If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Tornado

الموضوع في 'Steam Traction' بواسطة Leander's Shovel, بتاريخ ‏20 اكتوبر 2007.

  1. Jamessquared

    Jamessquared Nat Pres stalwart

    إنضم إلينا في:
    ‏8 مارس 2008
    المشاركات:
    27,793
    عدد المعجبين:
    64,460
    مكان الإقامة:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Not a whole boiler, but there is a batch order for either five or six Bulleid light Pacific fireboxes currently underway at South Devon, with the costs and risks of set up (primarily producing the necessary dies for the presses) shared between the different owning societies. As you say, there are other boiler designs for which a similar pooling of resources would be entirely feasible.

    Tom
     
    أعجب بهذه المشاركة S.A.C. Martin
  2. 61624

    61624 Part of the furniture

    إنضم إلينا في:
    ‏27 سبتمبر 2006
    المشاركات:
    5,294
    عدد المعجبين:
    3,599
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    It is already starting to happen. I understand that the DSR are planning to have a third boiler (albeit with steel firebox) constructed to reduce overhaul turnaround times on their GW 2-8-0Ts.
     
    أعجب بهذه المشاركة NSWGR 3827
  3. class8mikado

    class8mikado Part of the furniture

    إنضم إلينا في:
    ‏1 جوان 2009
    المشاركات:
    3,840
    عدد المعجبين:
    1,644
    الوظيفة:
    Print Estimator/ Repository of Useless Informatio.
    مكان الإقامة:
    Bingley W.Yorks.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    If the Night owl arent using their No1 then presumably thats also a spare...

    Whilst ordering Two A1/P2 boilers allows the producing of 2 sets of component parts the final assembly is still a one off process, allowing one to be put into service / assessed before completing the other...
     
    أعجب بهذه المشاركة jnc
  4. Sheff

    Sheff Resident of Nat Pres

    إنضم إلينا في:
    ‏21 إبريل 2006
    المشاركات:
    8,059
    عدد المعجبين:
    3,137
    الجنس:
    ذكر
    الوظيفة:
    Retired Engineer & Heritage Volunteer
    مكان الإقامة:
    N Warks
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I'm pretty sure that given the combined experience of the A1 operations and the boiler manufacturer , the necessary design mods required will already be well defined.
     
    أعجب بهذه المشاركة keith6233
  5. Jimc

    Jimc Part of the furniture

    إنضم إلينا في:
    ‏8 سبتمبر 2005
    المشاركات:
    4,117
    عدد المعجبين:
    4,821
    الوظيفة:
    Once computers, now part time writer I suppose.
    مكان الإقامة:
    SE England
    Heritage Railway Volunteer:
    No I do not currently volunteer
    As a point of detail, although there were Large Prairies with Std 4 boilers all the surviving Large Prairies have Std 2. I think though the Std 1 and the Std 4 used the same flanging blocks.
     
  6. W.Williams

    W.Williams Well-Known Member

    إنضم إلينا في:
    ‏20 ديسمبر 2015
    المشاركات:
    1,650
    عدد المعجبين:
    1,559
    الوظيفة:
    Mechanical Engineer
    مكان الإقامة:
    Aberdeenshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Just reading the Patriot project update

    "No sooner had we moved in, a phone call was received from the operators of 60163 'Tornado' who were required to carry out urgent repairs to some leaking stays on their boiler. This would necessitate the removal of the cab to gain access to complete the repairs."

    Arent Tornado's Stays welded?
     
  7. Steve

    Steve Resident of Nat Pres Friend

    إنضم إلينا في:
    ‏7 اكتوبر 2006
    المشاركات:
    12,729
    عدد المعجبين:
    11,847
    الوظيفة:
    Gentleman of leisure, nowadays
    مكان الإقامة:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I'm fairly certain that they have tell-tales, though, in which case, if they are leaking, they are cracked/broken and need replacing.
     
  8. Sheff

    Sheff Resident of Nat Pres

    إنضم إلينا في:
    ‏21 إبريل 2006
    المشاركات:
    8,059
    عدد المعجبين:
    3,137
    الجنس:
    ذكر
    الوظيفة:
    Retired Engineer & Heritage Volunteer
    مكان الإقامة:
    N Warks
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Yes the stays are counter-bored most of the way through from the outside so there is no doubt if you have a crack, this is unlike most locos where you rely on a man with a hammer tapping them every so often.
     
    NSWGR 3827 و jnc معجبون بهذا.
  9. Shoddy127

    Shoddy127 Well-Known Member

    إنضم إلينا في:
    ‏1 جوان 2005
    المشاركات:
    1,905
    عدد المعجبين:
    330
    الجنس:
    ذكر
    مكان الإقامة:
    Portsmouth
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The joys of having a disposable boiler I guess rather than the standard version. Weren't all Dampflokwerk Meiningen boilers meant to last for only 10 years or so anyhow before a new one was required? Even with the order for 2 new boilers, is it actually solving the problem long term or just another quick fix that will require attention every 2-4 years?
     
  10. class8mikado

    class8mikado Part of the furniture

    إنضم إلينا في:
    ‏1 جوان 2009
    المشاركات:
    3,840
    عدد المعجبين:
    1,644
    الوظيفة:
    Print Estimator/ Repository of Useless Informatio.
    مكان الإقامة:
    Bingley W.Yorks.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Think for ' boiler' you should read 'firebox' ? plus the boilers produced are to A1SLT spec. not Deutsche Reichsbahn....
     
    The Green Howards و jnc معجبون بهذا.
  11. Shoddy127

    Shoddy127 Well-Known Member

    إنضم إلينا في:
    ‏1 جوان 2005
    المشاركات:
    1,905
    عدد المعجبين:
    330
    الجنس:
    ذكر
    مكان الإقامة:
    Portsmouth
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    So, are you saying that the firebox had to be replaced after that time period rather than the barrel as well? Was this standard German practice?
     
  12. class8mikado

    class8mikado Part of the furniture

    إنضم إلينا في:
    ‏1 جوان 2009
    المشاركات:
    3,840
    عدد المعجبين:
    1,644
    الوظيفة:
    Print Estimator/ Repository of Useless Informatio.
    مكان الإقامة:
    Bingley W.Yorks.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I am saying that steel fireboxes tend not to last as long as copper ones and AFAIK you are right that DRB see Boilers as consumeable items rather than something to be endlessly patched up but since the firebox is 'wearing out'much quicker than the rest firebox replacement must be outstripping whole boiler replacement.
    If a steam loco costs ' Half a million' every 8 years then there simply wouldnt be as many steam locos running in Germany
     
  13. Chuffington

    Chuffington New Member

    إنضم إلينا في:
    ‏25 إبريل 2018
    المشاركات:
    98
    عدد المعجبين:
    63
    الجنس:
    ذكر
    مكان الإقامة:
    Cheltenham
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I may be wrong but I am to understand that the practice on steel boilers (Poland Germany) was to replace the fire box every five years up fifteen years and then replace the whole boiler at fifteen years, not really a cost saving if you have replace it after such a short period, which I suppose is why they have to have a spare.

    As far replacing copper boxes for steel, we have been here before, that wasn't successful and cost the owners dearly.
     
  14. class8mikado

    class8mikado Part of the furniture

    إنضم إلينا في:
    ‏1 جوان 2009
    المشاركات:
    3,840
    عدد المعجبين:
    1,644
    الوظيفة:
    Print Estimator/ Repository of Useless Informatio.
    مكان الإقامة:
    Bingley W.Yorks.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Dont know which instance you are referring to chuffers ( standard 4 tank ?) but there is clearly more too it than just using a different material, the dimensional relationship and staying scheme between inner and outer firebox clearly has to be very different and one of the reasons why the design was contracted to Meiningen even before the order for the build was placed there.
    IIrc The teething troubles with Tornados lower firebox early on were to do with aspects of the original LNER design being retained rather than Meiningens redesign, and the other way round with the foundation ring construction..
     
    Bean-counter, MarkinDurham و Sheff معجبون بهذا.
  15. MarkinDurham

    MarkinDurham Well-Known Member

    إنضم إلينا في:
    ‏4 ماي 2007
    المشاركات:
    2,229
    عدد المعجبين:
    999
    مكان الإقامة:
    Durham
    ISTR that yes, it was the KWVR who tried a steel firebox on their Standard 4 tank 80002 instead of copper, but as stated above, it didn't work, for the reasons also given above.
     
  16. gwalkeriow

    gwalkeriow Well-Known Member

    إنضم إلينا في:
    ‏17 أوت 2009
    المشاركات:
    1,710
    عدد المعجبين:
    1,732
    الجنس:
    ذكر
    الوظيفة:
    Retired.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    The IOWSR has had two new boilers built with steel fireboxes but that was accomplished with a complete redesign of the firebox to suit the steel inner box. W8 has just completed its second 10yr stint without any major repairs and is currently being assessed for a third ticket
     
    NSWGR 3827, Greenway, Bean-counter و 2 آخرون معجبون بهذا.
  17. Richard Roper

    Richard Roper Well-Known Member

    إنضم إلينا في:
    ‏22 ماي 2006
    المشاركات:
    1,310
    عدد المعجبين:
    1,359
    الجنس:
    ذكر
    الوظيفة:
    Librarian
    مكان الإقامة:
    Just up the road from 56E Sowerby Bridge
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I seem to recall from reading Push & Pull, that a lot of star-fractures were occurring in the side sheets. Not sure about broken stays though.

    Richard.
     
  18. GWR4707

    GWR4707 Nat Pres stalwart

    إنضم إلينا في:
    ‏12 ماي 2006
    المشاركات:
    19,232
    عدد المعجبين:
    17,566
    الجنس:
    ذكر
    مكان الإقامة:
    Cumbria
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Quite a brave thing to do in the present climate, I assume any problems of common standards, specification and potential tariff come November have been factored into this cost and decision?

    The 47xx could (and maybe will) run with a no.1 for a while as per 4700 as built, however I cannot imagine the GWS getting rid of a spare no.1 as it would be handy for many locos on site at Didcot if required. However there is a spare No.1 kicking around (at Tyseley originally earmarked for a Star conversion??) I believe it came off 2873 which now stands forlorn and boiler less at the SDR.
     
  19. marshall5

    marshall5 Part of the furniture

    إنضم إلينا في:
    ‏26 اكتوبر 2010
    المشاركات:
    2,521
    عدد المعجبين:
    4,359
    مكان الإقامة:
    i.o.m
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I believe that the idea of using the #1 boiler on 4709 has been abandoned and the ex 2861 cylinder block is to be removed. A 'correct' replacement cylinder block is to be made to suit the larger boiler.
    Ray.
     
    Sheff و jnc معجبون بهذا.
  20. free2grice

    free2grice Part of the furniture Friend

    إنضم إلينا في:
    ‏19 سبتمبر 2005
    المشاركات:
    5,625
    عدد المعجبين:
    3,613
    الجنس:
    ذكر
    الوظيفة:
    Retired Rolls-Royce engineer
    مكان الإقامة:
    Bath Green Park / Mangotsfield
    Heritage Railway Volunteer:
    No I do not currently volunteer
    A still image from Tornado's FFCCTV trial (front facing CCTV) during it's mainline charter to Kingswear on 6th July.

    News from Graeme Bunker at the A1 Steam Trust: ''The trial was successful so permanent fitment next''.


    [​IMG]
     
    weltrol, Richard Roper و Sheff معجبون بهذا.

مشاركة هذه الصفحة