If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

West Somerset Railway General Discussion

الموضوع في 'Heritage Railways & Centres in the UK' بواسطة gwr4090, بتاريخ ‏15 نوفمبر 2007.

  1. Snifter

    Snifter Well-Known Member

    إنضم إلينا في:
    ‏26 أوت 2014
    المشاركات:
    1,692
    عدد المعجبين:
    4,298
    الجنس:
    ذكر
    Heritage Railway Volunteer:
    No I do not currently volunteer
    How quickly we forget.
     
  2. johnofwessex

    johnofwessex Resident of Nat Pres

    إنضم إلينا في:
    ‏6 إبريل 2015
    المشاركات:
    9,748
    عدد المعجبين:
    7,860
    الجنس:
    ذكر
    الوظيفة:
    Thorn in my managers side
    مكان الإقامة:
    72
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I met the GWSR Head of Drains & had a fascinating conversation, clearly its a far more important & complex issue than you might think
     
    Paul Kibbey, malcolm imps و flying scotsman123 معجبون بهذا.
  3. Miff

    Miff Part of the furniture Friend

    إنضم إلينا في:
    ‏17 جوان 2008
    المشاركات:
    3,004
    عدد المعجبين:
    3,025
    If you mean the Ex6+1 I entirely agree with you.
     
    أعجب بهذه المشاركة Paul Kibbey
  4. threelinkdave

    threelinkdave Well-Known Member

    إنضم إلينا في:
    ‏1 أوت 2013
    المشاركات:
    2,065
    عدد المعجبين:
    1,240
    الجنس:
    ذكر
    الوظيفة:
    Retired
    مكان الإقامة:
    Stratford-upon-Avon or in a brake KD to BH
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Drains and culverts are extreemly important. On the SVR they are inspected yearly and using a drain jetting lorry on a wellwagon are flushed through
     
    Paul Kibbey, malcolm imps, Wenlock و 4 آخرون معجبون بهذا.
  5. mdewell

    mdewell Well-Known Member Friend

    إنضم إلينا في:
    ‏23 مارس 2005
    المشاركات:
    1,925
    عدد المعجبين:
    2,999
    الوظيفة:
    UK & Ireland Heritage Railways Webmaster
    مكان الإقامة:
    Ruabon, Wrexham
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Pardon my going slightly off topic but . . . .
    . . . I work in IT and we often have outside consultants reviewing our systems and procedures etc. While there is a slight element of 'Don't mangement trust us to do our jobs properly?, this is more than offset by the occasions when a report fully agrees with things we have been saying for ages. It sometimes takes an external expert to add their weight to your arguments before an issue is given appropriate attention and any necessary resources (aka money!) allocated to the rectifying the issue(s). On balance we usually welcome such reviews.:)
    And if they find something we had overlooked, :oops: then embarassing though that might be, it does enable us to do a better job in future.
     
    Paul Kibbey, oddsocks, Wenlock و 13 آخرون معجبون بهذا.
  6. misspentyouth62

    misspentyouth62 Well-Known Member

    إنضم إلينا في:
    ‏8 نوفمبر 2017
    المشاركات:
    1,718
    عدد المعجبين:
    2,222
    الجنس:
    ذكر
    مكان الإقامة:
    34D, now flexible
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Whilst I do agree, as someone who has also worked in IT Service Management for many years and has just retired, there is an added comment that I should wish to make whereby ; where an outside organisation are contracted at great expense to tell a business what they already knew, this can have a not-insignificant negative impact on the performance of the incumbent expertise within.
     
    أعجب بهذه المشاركة Paul Kibbey
  7. simon

    simon Resident of Nat Pres

    إنضم إلينا في:
    ‏26 جوان 2006
    المشاركات:
    11,872
    عدد المعجبين:
    5,565
    It may be that the auditors do not have faith in the internal view of the costs of restoring the WSR trackbed and track to the desired standard and, in order to break the impasse, the Board have decided to employ external professionals to come up with a cost estimate
     
  8. 35B

    35B Nat Pres stalwart

    إنضم إلينا في:
    ‏18 جوان 2011
    المشاركات:
    28,741
    عدد المعجبين:
    28,687
    الجنس:
    ذكر
    مكان الإقامة:
    Grantham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Or, in the spirit of speculation, that the size of any writedowns of the value of the infrastructure (and which would hit both P&L and balance sheet) need a lot more time to work through and agree than would a "normal" set of accounts.

    The point being not that you, I or anyone else are right, but that there may be very good practical reasons why the normal lead time for production of accounts is impractical.
     
    أعجب بهذه المشاركة jnc
  9. 30854

    30854 Resident of Nat Pres

    إنضم إلينا في:
    ‏8 مارس 2017
    المشاركات:
    12,172
    عدد المعجبين:
    11,496
    الجنس:
    ذكر
    الوظيفة:
    Retired
    مكان الإقامة:
    Brighton&Hove
    Heritage Railway Volunteer:
    No I do not currently volunteer
    ..... as I discovered for myself at Goat Cutting, Beddgelert, in 1972, when the then abandoned formation proved to be a decidedly boggy thigh-deep ditch! :(

    It isn't all about the glamour jobs like raking out ashpans and smokeboxes, oiling inaccessible inside motions and most important of all, ensuring the workshop doesn't run out of tea bags, is it? :D
     
    Paul Kibbey, Jim O'Brien, Bluenosejohn و 1 شخص آخر معجبون بهذا.
  10. Gladiator 5076

    Gladiator 5076 Resident of Nat Pres

    إنضم إلينا في:
    ‏2 اكتوبر 2015
    المشاركات:
    7,927
    عدد المعجبين:
    6,661
    الجنس:
    ذكر
    مكان الإقامة:
    Swanage
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Maybe engineering or infrastructure consultants are different by my experience of outside consultants (Supply Chain, Marketing, Component Overhaul) was to agree that very little if anything you currently did was good enough and hence justify their suggestions and fee.
     
    Bluenosejohn و jnc معجبون بهذا.
  11. free2grice

    free2grice Part of the furniture Friend

    إنضم إلينا في:
    ‏19 سبتمبر 2005
    المشاركات:
    5,626
    عدد المعجبين:
    3,617
    الجنس:
    ذكر
    الوظيفة:
    Retired Rolls-Royce engineer
    مكان الإقامة:
    Bath Green Park / Mangotsfield
    Heritage Railway Volunteer:
    No I do not currently volunteer
    An example of that was when we had an inspection at Rolls-Royce of an engineering department. We were confident that all was well and were surprised when the group of inspectors found a problem. They had discovered a can of 3 in 1 oil that was out of date (what?). It transpired that the date on the can was when the oil was produced. The embarrassed group departed rather quickly. <BJ>
     
    baldbof, oddsocks, daveb و 5 آخرون معجبون بهذا.
  12. Keith Sims

    Keith Sims Member

    إنضم إلينا في:
    ‏22 مارس 2015
    المشاركات:
    236
    عدد المعجبين:
    702
    الجنس:
    ذكر
    الوظيفة:
    retired from volunteering
    مكان الإقامة:
    Somerset
    Heritage Railway Volunteer:
    No I do not currently volunteer
    To ask a silly question?
    Several years ago, at considerable expense and disruption to services, the loop at Williton was extended. The reason given was to allow trains to use the whole Up platform. Having traveled from and back to Williton today I noticed that the up trains still stop way back from the end of the platform, where they always did! The last 2 or so carriages off the end of the platform! Progress? Can anyone explain WHY?
     
    أعجب بهذه المشاركة malcolm imps
  13. toplink

    toplink New Member Friend

    إنضم إلينا في:
    ‏28 مارس 2006
    المشاركات:
    155
    عدد المعجبين:
    90
    الوظيفة:
    Signalman (retired)
    مكان الإقامة:
    South Dorset & sometimes Somerset, now Spain
    Heritage Railway Volunteer:
    No I do not currently volunteer
    If the UP train arrives first and there is going to be a while before the DOWN comes in, it has to wait behind the footbridge so as the crossing is free to road traffic. When trains arrive within a few minutes of each other then the the full length of the platforms can be used.
    Prior to all the work being done only one train at a time could be allowed into the station, with the new layout both trains can come in at the same time that way train arrival and departures can be completed much more swiftly.
     
    أعجب بهذه المشاركة jnc
  14. gwilialan

    gwilialan Well-Known Member

    إنضم إلينا في:
    ‏8 ديسمبر 2012
    المشاركات:
    1,706
    عدد المعجبين:
    3,988
    الجنس:
    ذكر
    مكان الإقامة:
    Out there somewhere
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Memories of many happy (?) days fighting my way through the ditches, brambles and nettles on the low side of the railway listening for the sound of merrily trickling water, (usually in the biggest clump of brambles), pulling the undergrowth away and saying to myself "There's another one that's not on the plans then" Such fun. :rolleyes:
     
    Bluenosejohn, 35B, 30854 و 4 آخرون معجبون بهذا.
  15. Keith Sims

    Keith Sims Member

    إنضم إلينا في:
    ‏22 مارس 2015
    المشاركات:
    236
    عدد المعجبين:
    702
    الجنس:
    ذكر
    الوظيفة:
    retired from volunteering
    مكان الإقامة:
    Somerset
    Heritage Railway Volunteer:
    No I do not currently volunteer
    My point is , why cannot the engine pull forward to the end of the platform as it does at Blue Anchor? Why wait behind the footbridge? I understand about not fouling the road crossing.
     
  16. Robin Moira White

    Robin Moira White Resident of Nat Pres

    إنضم إلينا في:
    ‏27 إبريل 2014
    المشاركات:
    11,404
    عدد المعجبين:
    18,231
    الجنس:
    أنثي
    الوظيفة:
    Barrister
    مكان الإقامة:
    Stogumber
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    For the up train to run in without the gates being shut the signal has to be back where it is behind the footbridge.

    Robin
     
  17. 35B

    35B Nat Pres stalwart

    إنضم إلينا في:
    ‏18 جوان 2011
    المشاركات:
    28,741
    عدد المعجبين:
    28,687
    الجنس:
    ذكر
    مكان الإقامة:
    Grantham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Is that just a question of sighting, or something else? It seems an odd constraint.
     
  18. toplink

    toplink New Member Friend

    إنضم إلينا في:
    ‏28 مارس 2006
    المشاركات:
    155
    عدد المعجبين:
    90
    الوظيفة:
    Signalman (retired)
    مكان الإقامة:
    South Dorset & sometimes Somerset, now Spain
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Keith, the issue is with the locking of the crossing by the trackcircuit between the footbridge and the crossing. At Blue Anchor the down signal, BA3, is only 4 feet from the crossing that it protects. At Williton the protecting signal for the crossing is WN4 i.e. the one by the footbridge. The up starter WN5 is the Taunton side of the crossing, in front of the road bridge and is there to protect the points onto the single line.
    This whole scenario only happens occasionally as most of the time the down train comes in first. Also it's further for the signalman to walk, so we try not to use this procedure unless it's absolutely necessary.
     
  19. Robin Moira White

    Robin Moira White Resident of Nat Pres

    إنضم إلينا في:
    ‏27 إبريل 2014
    المشاركات:
    11,404
    عدد المعجبين:
    18,231
    الجنس:
    أنثي
    الوظيفة:
    Barrister
    مكان الإقامة:
    Stogumber
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    No. For the up train to be able to run in without the gates open if it runs in first, the protecting signal has to be sufficiently back from the crossing that if the train overran the signal 'a bit' it would not end up on the crossing.

    Robin
     
    Paul Kibbey و malcolm imps معجبون بهذا.
  20. 35B

    35B Nat Pres stalwart

    إنضم إلينا في:
    ‏18 جوان 2011
    المشاركات:
    28,741
    عدد المعجبين:
    28,687
    الجنس:
    ذكر
    مكان الإقامة:
    Grantham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I'm even more confused, then. Taking that at face value, how does it square with the layout at Blue Anchor, where there is a significantly smaller "bit" for an overrun, and to what I'd have thought was a riskier crossing.

    Please be kind to this non-expert in signalling design and rules!
     

مشاركة هذه الصفحة