If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Swanage Railway General Discussion

Discussie in 'Heritage Railways & Centres in the UK' gestart door Rumpole, 10 okt 2012.

  1. martin1656

    martin1656 Nat Pres stalwart Friend

    Lid geworden:
    8 dec 2014
    Berichten:
    19.270
    Leuk Bevonden:
    12.520
    Geslacht:
    Man
    Locatie:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    the problem has to be in finding a suitable end destination, Salisbury possibly if your talking more than one trip, but it would need to be heavily advertised, and have pre booking , then do you run only as far as Southampton on the return, or run back via Eastleigh, Southampton and back to Salisbury via Red bridge returning to Salisbury with the first, and last trips running Swanage, Bournemouth Southampton in addition, to return the loco and stock to Swanage and give additional pick up points, with the second being a Salisbury round trip out via Chandlers Ford, returning via Redbridge calling at Eastleigh and Southampton that maximises the earning potential if tickets for the second train can be sold on the day, whilst passengers off the first enjoy a day in Salisbury, one other question would be, would NR accept using the DMU as hauled stock?
     
  2. Alan Kebby

    Alan Kebby Well-Known Member

    Lid geworden:
    18 sep 2019
    Berichten:
    1.193
    Leuk Bevonden:
    1.249
    Geslacht:
    Man
    Locatie:
    Brighton
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Let’s not get too carried away with the idea of Swanage Railway running mainline tours. The primary aim is running steam into Wareham - enough of a challenge in itself.

    If that’s a success, then in time tentative steps may be taken to run short trips slightly further afield.

    Any mainline tours by 31806 in the next year or so, would I imagine involve it being hired to another tour operator.
     
    Last edited: 29 sep 2019
    Shaggy, lil Bear, Daddsie71b en 7 anderen vinden dit leuk.
  3. Gladiator 5076

    Gladiator 5076 Resident of Nat Pres

    Lid geworden:
    2 okt 2015
    Berichten:
    7.931
    Leuk Bevonden:
    6.663
    Geslacht:
    Man
    Locatie:
    Swanage
    Heritage Railway Volunteer:
    No I do not currently volunteer
    A sight many will be pleased to see. IMG_2914.JPG IMG_2908.JPG
     
  4. Alan Kebby

    Alan Kebby Well-Known Member

    Lid geworden:
    18 sep 2019
    Berichten:
    1.193
    Leuk Bevonden:
    1.249
    Geslacht:
    Man
    Locatie:
    Brighton
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Good to see it back. Hopefully we can now enjoy it for a year of trouble free service before the boiler certicate expires.
     
  5. desperado

    desperado Member

    Lid geworden:
    12 dec 2006
    Berichten:
    217
    Leuk Bevonden:
    89
    Locatie:
    Brussels
    There will be other changes needed to Mk1s if they are to be used on the main line in a few years time - at least retention toilets and changes to the windows and doors to stop people leaning out. There may be more. It may be that the cost of fitting the central door locking would not be recovered before the other changes become required & that the total bill isn't worth it.
     
    flying scotsman123 vindt dit leuk.
  6. Alan Kebby

    Alan Kebby Well-Known Member

    Lid geworden:
    18 sep 2019
    Berichten:
    1.193
    Leuk Bevonden:
    1.249
    Geslacht:
    Man
    Locatie:
    Brighton
    Heritage Railway Volunteer:
    No I do not currently volunteer
    If only running to Wareham, the toilets could be locked out of use whilst on the mainline to prevent any need for retention tanks. If travelling any further afield this might cause problems though!

    On the 2017 trial service with the 4TC, I remember the guard making announcements about the toilets.

    “We are now joining the mainline, please do not use the toilets”

    “We are leaving the mainline, you may now use the toilets”

    What form of door locking is normally used on mainline Mk1s? It’s not the same as used on the Swanage DMUs and the TC is it?
     
    desperado vindt dit leuk.
  7. desperado

    desperado Member

    Lid geworden:
    12 dec 2006
    Berichten:
    217
    Leuk Bevonden:
    89
    Locatie:
    Brussels
    It all depends what regulations will apply when Swanage could have enough Mk1s to form a viable mainline set. Some of the changes have been covered in the railway press - door handles on the inside (so no need for opening windows) and retention toilets being two of them.
     
  8. gricerdon

    gricerdon Well-Known Member

    Lid geworden:
    10 mrt 2018
    Berichten:
    1.795
    Leuk Bevonden:
    870
    Geslacht:
    Man
    Beroep:
    Gricer and Grandad
    Locatie:
    Wallers Ash
    Heritage Railway Volunteer:
    No I do not currently volunteer
    It will need to be turned before the Gala
     
  9. evilswans

    evilswans Member

    Lid geworden:
    18 dec 2007
    Berichten:
    349
    Leuk Bevonden:
    205
    Locatie:
    Woking, Surrey
    I think a short visit to the great central should take care of that...
     
  10. gricerdon

    gricerdon Well-Known Member

    Lid geworden:
    10 mrt 2018
    Berichten:
    1.795
    Leuk Bevonden:
    870
    Geslacht:
    Man
    Beroep:
    Gricer and Grandad
    Locatie:
    Wallers Ash
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Let’s hope they don’t break my favourite Swanage loco
     
  11. Daddsie71b

    Daddsie71b Member Friend

    Lid geworden:
    4 apr 2013
    Berichten:
    943
    Leuk Bevonden:
    803
    Geslacht:
    Man
    Locatie:
    34091
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Sorry Gladiator, Bincombe Bank, not Upwey Bank
     
  12. biggles200

    biggles200 Member

    Lid geworden:
    2 jul 2007
    Berichten:
    328
    Leuk Bevonden:
    237
    Beroep:
    retired and holding on
    Locatie:
    Purbeck
    Heritage Railway Volunteer:
    No I do not currently volunteer
    It is off to the Great Central Railway at Loughborough to take part in their Autumn Gala and when it comes back it maybe pointing the other way.
     
  13. martin1656

    martin1656 Nat Pres stalwart Friend

    Lid geworden:
    8 dec 2014
    Berichten:
    19.270
    Leuk Bevonden:
    12.520
    Geslacht:
    Man
    Locatie:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Not every coach needs to have toilets, so why not take them out, and convert a brake coach to have a single disabled friendly toilet with retension tank , on the mainline set, it can be done, Pedros has shown how to do it, central locking doors can be done quite easy, using electro magnetic bolts activated by the guard, to lock the doors , Mk 1 based mu stock had handles on the inside VEP's for instance, how much wiring would that take, then of course, once you have the first done, the rest becomes a fitting job as you already have the wiring components sorted out and ironed out any snags, hopefully as it becomes a requirement on the main line, one of the big heritage TOC's should have sorted out kits to make electronic central locking easier. and the toilet installation, should use components that are available off the shelf .
     
  14. 35B

    35B Nat Pres stalwart

    Lid geworden:
    18 jun 2011
    Berichten:
    28.742
    Leuk Bevonden:
    28.692
    Geslacht:
    Man
    Locatie:
    Grantham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    You trivialise two material issues. As discussed on various threads, loos cannot be so easily dismissed, while applying VEP type door handles is not necessarily a customer friendly answer to leaning out - my memory of them as a user is not particularly repeatable in polite company.


    Sent from my iPad using Tapatalk
     
  15. DcB

    DcB Well-Known Member

    Lid geworden:
    5 jun 2018
    Berichten:
    1.488
    Leuk Bevonden:
    455
    Locatie:
    Surrey
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I think the LU 4TC had no indoor door handles? But mainline certifaction may be getting tighter?
    Looking at the gala timetable and there are 4 trips to the River Frome each day. Maybe during 2020, if some coaches could be brought up to mainline standards, running the 31806 with a 33 to Wareham to tie in with SWR trains (inbetween railcar trips) might be finally be possible?
     
    Last edited: 1 okt 2019
  16. Gladiator 5076

    Gladiator 5076 Resident of Nat Pres

    Lid geworden:
    2 okt 2015
    Berichten:
    7.931
    Leuk Bevonden:
    6.663
    Geslacht:
    Man
    Locatie:
    Swanage
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I think this answers the question

    https://orr.gov.uk/__data/assets/pdf_file/0019/1936/reg5-cert-railfilms-2013-03-30.pdf
     
  17. twr12

    twr12 Well-Known Member

    Lid geworden:
    2 sep 2007
    Berichten:
    1.659
    Leuk Bevonden:
    821
    To retrofit coaches that currently have outside door handles only; with inside actuation, would start at £2M, just for the tooling to make the parts.
     
  18. martin1656

    martin1656 Nat Pres stalwart Friend

    Lid geworden:
    8 dec 2014
    Berichten:
    19.270
    Leuk Bevonden:
    12.520
    Geslacht:
    Man
    Locatie:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I did say in my post that i would hope that one of the TOC'S that intend to continue to use slam door stock would be able to supply kits to enable the door locking to be done. are there any scrap 4 veps still around that could be stripped to provide doors i'm of course assuming the doors are a straight swop.
     
  19. Southernman99

    Southernman99 Member Friend

    Lid geworden:
    10 nov 2009
    Berichten:
    946
    Leuk Bevonden:
    698
    That price seems very high considering Kayes of Leeds still have the tooling to make BR mk1 double acting locks with inside actuation.
    You would extremely lucky to find doors that just drop onto the balls. Each hinge is aligned per door. So putting a door from coach A onto coach B isnt as easy.
     
    Hirn en flying scotsman123 vinden dit leuk.
  20. flying scotsman123

    flying scotsman123 Resident of Nat Pres

    Lid geworden:
    9 sep 2013
    Berichten:
    10.676
    Leuk Bevonden:
    18.701
    Geslacht:
    Man
    Locatie:
    Cheltenham
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Or even a door from coach A into another position on coach A!
     
    lil Bear vindt dit leuk.

Deel Deze Pagina