    Interesting twists in this tale ...
     
    أعجب بهذه المشاركة lil Bear
  2. Gav106

    Gav106 Well-Known Member

    إنضم إلينا في:
    ‏29 مارس 2010
    المشاركات:
    1,772
    عدد المعجبين:
    2,171
    مكان الإقامة:
    Nantwich, Cheshire
    FB_IMG_1575658951453.jpg FB_IMG_1575658958090.jpg FB_IMG_1575658964349.jpg FB_IMG_1575658972132.jpg FB_IMG_1575658984475.jpg

    HBSS have just posted these updated images of progress on the boiler. Looking great!
     
    Davo, Richard Roper, MPR و 10 آخرون معجبون بهذا.
  3. Richard Roper

    Richard Roper Well-Known Member

    إنضم إلينا في:
    ‏22 ماي 2006
    المشاركات:
    1,310
    عدد المعجبين:
    1,359
    الجنس:
    ذكر
    الوظيفة:
    Librarian
    مكان الإقامة:
    Just up the road from 56E Sowerby Bridge
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Good to see the boiler coming along (very) nicely! Once the rectification work at West Shed is complete, we should have a very worthy machine. Really looking forward to next year!

    Richard.
     
    أعجب بهذه المشاركة Gav106
  4. RalphW

    RalphW Nat Pres stalwart Staff Member Administrator Friend

    إنضم إلينا في:
    ‏11 سبتمبر 2005
    المشاركات:
    36,658
    عدد المعجبين:
    10,046
    الجنس:
    ذكر
    الوظيفة:
    Retired-ish, Part time rail tour steward.
    مكان الإقامة:
    Northwich
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I think that your comment needs a little clarification, people could read it as the boiler, whilst coming along, needs some rectification. This as we know is not the case, the boiler being built by HBSS is not a cause for concern, the problems lie elsewhere.
     
    Gav106 و misspentyouth62 معجبون بهذا.
  5. Richard Roper

    Richard Roper Well-Known Member

    إنضم إلينا في:
    ‏22 ماي 2006
    المشاركات:
    1,310
    عدد المعجبين:
    1,359
    الجنس:
    ذكر
    الوظيفة:
    Librarian
    مكان الإقامة:
    Just up the road from 56E Sowerby Bridge
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Sorry Ralph, not thinking straight (full of cold!)

    The boiler doesn't require rectification. I meant that it's great to see the boiler coming along nicely, and once the "bottom half" has been rectified at West Shed, we should have a worthy machine... Once my head's not full of goop I may be able to think straight!

    Richard.
     
    أعجب بهذه المشاركة Gav106
  6. RalphW

    RalphW Nat Pres stalwart Staff Member Administrator Friend

    إنضم إلينا في:
    ‏11 سبتمبر 2005
    المشاركات:
    36,658
    عدد المعجبين:
    10,046
    الجنس:
    ذكر
    الوظيفة:
    Retired-ish, Part time rail tour steward.
    مكان الإقامة:
    Northwich
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Understood. thumbsup.gif Hope you are soon feeling better.
     
    أعجب بهذه المشاركة Gav106
  7. Gav106

    Gav106 Well-Known Member

    إنضم إلينا في:
    ‏29 مارس 2010
    المشاركات:
    1,772
    عدد المعجبين:
    2,171
    مكان الإقامة:
    Nantwich, Cheshire
    I nipped Into the west shed to collect some sales stock and took these pics while i was there. The quality looks fantastic! IMG_20191206_121307.jpg IMG_20191206_121255.jpg
     
    CH 19, Richard Roper, S.A.C. Martin و 10 آخرون معجبون بهذا.
  8. Argus

    Argus New Member

    إنضم إلينا في:
    ‏14 جويلية 2010
    المشاركات:
    75
    عدد المعجبين:
    30
    الجنس:
    ذكر
    Heritage Railway Volunteer:
    Yes I am an active volunteer
  9. Gav106

    Gav106 Well-Known Member

    إنضم إلينا في:
    ‏29 مارس 2010
    المشاركات:
    1,772
    عدد المعجبين:
    2,171
    مكان الإقامة:
    Nantwich, Cheshire
    As the two guys who started HBSS were working on the boiler as LNWR staff, along with a number of others, Andy Tranter for one, I think we can give them a break :)
     
    أعجب بهذه المشاركة ragl
  10. huochemi

    huochemi Part of the furniture

    إنضم إلينا في:
    ‏6 ماي 2008
    المشاركات:
    3,095
    عدد المعجبين:
    1,569
    الجنس:
    ذكر
    مكان الإقامة:
    UK
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Thank you. From the photo, the machining on the inside face of the wheel boss doesn't look that great and there is a suggestion of pitting on the journal, but perhaps that is an optical illusion.
     
  11. RalphW

    RalphW Nat Pres stalwart Staff Member Administrator Friend

    إنضم إلينا في:
    ‏11 سبتمبر 2005
    المشاركات:
    36,658
    عدد المعجبين:
    10,046
    الجنس:
    ذكر
    الوظيفة:
    Retired-ish, Part time rail tour steward.
    مكان الإقامة:
    Northwich
    Heritage Railway Volunteer:
    No I do not currently volunteer
    It was started whilst at LNWR, the majority of work however done by HBSS.
     
  12. Scrat

    Scrat New Member

    إنضم إلينا في:
    ‏10 ماي 2015
    المشاركات:
    133
    عدد المعجبين:
    106
    الجنس:
    ذكر
    الوظيفة:
    railway worker
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Boiler looking great, and even better that it is built in this country.

    I think however LNWR deserve a bit more credit. I believe the barrel, front tubeplate, and smokebox were made at Crewe along with the copper firebox , backplate and tubeplate, the barrel and firebox wrapper were bent by Barnshaws, the Steel firebox backplate and throatplate were made by Tyseley. So really this is a collective achievement by several key companies in the heritage engineering industry, and no one company can claim to have built it in its entirety...?
     
    joe_issitt, huochemi, jnc و 2 آخرون معجبون بهذا.
  13. estwdjhn

    estwdjhn Member

    إنضم إلينا في:
    ‏24 يناير 2013
    المشاركات:
    345
    عدد المعجبين:
    701
    الوظيفة:
    Boilermaker
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The barrel was pretty much finished by LNWR. I think that was the irony being observed. In a lot of ways, LNWR (or their suppliers) did the hard bits of this job - HSBS inheritited the job as a kit of parts at the "just add rivets and stays" stage. Lot of man hours in that, but the difficult bits of a boiler tend to be the press work and initial setting up and laying out aspects of the job.
     
    أعجب بهذه المشاركة jnc
  14. fergusmacg

    fergusmacg Resident of Nat Pres

    إنضم إلينا في:
    ‏17 أوت 2008
    المشاركات:
    6,793
    عدد المعجبين:
    4,190
    الوظيفة:
    Design Engineer
    مكان الإقامة:
    Cumbria
    Indeed although I wouldn't class Barnshaws as being in "the heritage engineering industry" being more of a mainstream engineering outfit and very useful for bending all sorts of stuff (I used them often in the day job, and you couldn't get further from heritage if you tried).


    Sent from my iPad using Tapatalk
     
    أعجب بهذه المشاركة ragl
  15. RalphW

    RalphW Nat Pres stalwart Staff Member Administrator Friend

    إنضم إلينا في:
    ‏11 سبتمبر 2005
    المشاركات:
    36,658
    عدد المعجبين:
    10,046
    الجنس:
    ذكر
    الوظيفة:
    Retired-ish, Part time rail tour steward.
    مكان الإقامة:
    Northwich
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Pedant mode... It's HBSS. :)
     
  16. Richard Roper

    Richard Roper Well-Known Member

    إنضم إلينا في:
    ‏22 ماي 2006
    المشاركات:
    1,310
    عدد المعجبين:
    1,359
    الجنس:
    ذكر
    الوظيفة:
    Librarian
    مكان الإقامة:
    Just up the road from 56E Sowerby Bridge
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Lovely to see some nice tasty bits of freshly painted metal! The paint finish does indeed look superb!

    Richard.
     
  17. Steve

    Steve Resident of Nat Pres Friend

    إنضم إلينا في:
    ‏7 اكتوبر 2006
    المشاركات:
    12,856
    عدد المعجبين:
    12,096
    الوظيفة:
    Gentleman of leisure, nowadays
    مكان الإقامة:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    It is and always was common practice to sub contract things out. Even the likes of (BR) Crewe was not immune to doing this, sub contracting fireboxes and other components to the likes of North British. At the end of the day, HBSS will (hopefully) finish the boiler and it will probably carry their makers plate. Does it really matter if that plate doesn't make reference to parts being made elsewhere?
     
    LMS2968 و jnc معجبون بهذا.
  18. LMS2968

    LMS2968 Part of the furniture

    إنضم إلينا في:
    ‏1 سبتمبر 2006
    المشاركات:
    3,094
    عدد المعجبين:
    5,425
    الجنس:
    ذكر
    الوظيفة:
    Lecturer retired: Archivist of Stanier Mogul Fund
    مكان الإقامة:
    Wigan
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Completely off topic, but from Frank Webb's days Crewe tried to make everything in-house, but copper firebox plate was an exception and bought in trimmed to size. This was because they were paying by weight, and it was cheaper doing it that way than buying in full-sized plate and trimming it themselves.
     
    andrewshimmin, ragl و Jamessquared معجبون بهذا.
  19. Jamessquared

    Jamessquared Nat Pres stalwart

    إنضم إلينا في:
    ‏8 مارس 2008
    المشاركات:
    28,158
    عدد المعجبين:
    66,079
    مكان الإقامة:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    One difficulty with contracting out is maintaining quality control, particularly where the contractor is working remotely from the project base (and therefore requiring periodic inspection visits from the client). That's made more difficult where multiple parties are involved, for example where Contractor A makes parts that are assembled by Contractor B, to quality standards set by Inspector C and on behalf of Client D.

    By no means impossible, but clearly requiring a degree of management expertise on behalf of the client. One assumes that by now it is a necessity that the project is well aware needs careful managing.

    Tom
     
    andrewshimmin و ragl معجبون بهذا.
  20. Steve

    Steve Resident of Nat Pres Friend

    إنضم إلينا في:
    ‏7 اكتوبر 2006
    المشاركات:
    12,856
    عدد المعجبين:
    12,096
    الوظيفة:
    Gentleman of leisure, nowadays
    مكان الإقامة:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    But that is the norm in the big wide world. Very few firms make everything they need these days.
     