    The Soller Railway (Mallorca) started life with steam, but the tortuous nature of this 3ft gauge line led to electrification in the late 1920s .... with the same four electric locos still 'doing their thing' to this day. Here's a pretty recent image to prove it!

    download.jpeg-1.jpg
    [Image courtesy Hidden Europe]

    Can't see anyone being overly keen on OHLE through Snowdonia National Park. :)
     
    已获得Sheff的支持.
  2. DcB

    DcB Well-Known Member

    注册日期:
    2018-06-05
    帖子:
    1,487
    支持:
    455
    所在地:
    Surrey
    Heritage Railway Volunteer:
    No I do not currently volunteer
    If the web info is correct (and there is not much info) the PB&SSR decided to go with 630 volts 3 phase which might have caused problems. Would have had made the 3 power wires very thick and unsuitable for overhead (the Italian line used a better voltage of 3kv AC with 3 wires then later went to a single wire with DC).
    A surface 5 rail track might have worked (rails would have taken the higher AC 3 phase current due to the lower 630v) but expensive and maybe why the project failed.
     
  3. johnofwessex

    johnofwessex Resident of Nat Pres

    注册日期:
    2015-04-06
    帖子:
    9,748
    支持:
    7,858
    性别:
    职业:
    Thorn in my managers side
    所在地:
    72
    Heritage Railway Volunteer:
    No I do not currently volunteer
    But what if it had succeeded??
     
  4. 1729

    1729 New Member

    注册日期:
    2019-08-14
    帖子:
    54
    支持:
    42
    所在地:
    Hampshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Personally the best solution of train rescue would be to build a third or even fourth vale of ffestiniog esk loco. So a 350hp ffestioniog gauge diesel, though to solve the WHR train weight problem multiple unit working would be practical. Though the existing funkeys have differing control systems so not every engine could be made for multiple unit working.
     
  5. Hunslet589

    Hunslet589 New Member

    注册日期:
    2017-03-19
    帖子:
    126
    支持:
    220
    性别:
    所在地:
    Oxfordshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    A tricky question - and difficult to know the answer. The most probable scenario IMHO...

    According to at least one history I have read (Boyd? - and yes, yes I know...) the electric company's promotion of the PBSSR was really a Trojan horse so that they could use the trackbed to cable their electricity to Porthmadoc and other coastal communities for sale. Which means that they might have kept it going when another management would have given up.

    Assuming a merger with NWNGR had gone ahead (not at all certain) to create a WHR when the former company's finances became terminal and that the electric company retained control, then they would have had a motive to keep the WHR running as an independent entity. In which case the lease to the FR would probably not have happened. The next question is whether the railway would have survived WWII. That seems doubtful - and it probably would have folded around the same time as the old FR together with the Creosor tramway. So the end result is not all that different to what happened for real.

    The above is pure speculation and a number of other equally plausible scenarios can be constructed. We will just never know!
     
  6. mickpop

    mickpop Resident of Nat Pres

    注册日期:
    2010-06-18
    帖子:
    6,408
    支持:
    5,603
    性别:
    职业:
    Retired
    所在地:
    Cheshire
    How about one of these for 'Thunderbird' duties? Rated at 335hp so not far short of a Funkey. Seem to manage on the Himalayas so Snowdonia should be a doddle!

    DSCN1215.jpg
     
    已获得Forestpines的支持.
  7. 30854

    30854 Resident of Nat Pres

    注册日期:
    2017-03-08
    帖子:
    12,172
    支持:
    11,496
    性别:
    职业:
    Retired
    所在地:
    Brighton&Hove
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Calling such a plan a 'Trojan Horse' has certain negative connotations. Recall, the Isle of Man Rly did rather well out of hosting a utility, in the form of a much needed track relay on the Port Erin line .... whilst admittedly waving bye-bye to any realistic chance of reopening the Peel line, due to same project, executed without train services in mind, on that long lifted route.

    S'pose, had a successful PB&SSR electrification scheme been employed, there'd have to have been at least a chance the FR would've looked to adopt same. Whether there'd have been a rash of of mergers will for ever remain a moot point, but with the 'Law of Impressive Sounding Names for Minor Railways' in mind (and tongue firmly in cheek), how does 'The Great North Wales Narrow Gauge Railways Company' grab y'all? :)
     
  8. Leafent

    Leafent New Member

    注册日期:
    2017-10-02
    帖子:
    100
    支持:
    58
    性别:
    所在地:
    The UK
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    This is something which I find quite interesting - if the WHR hadn't been able to get Garratts, they might have been able to get engineers from places like Brazil, India, and Java. However, there is very little info on what was available out there, and I suspect the condition would have been even worse.
     
  9. johnofwessex

    johnofwessex Resident of Nat Pres

    注册日期:
    2015-04-06
    帖子:
    9,748
    支持:
    7,858
    性别:
    职业:
    Thorn in my managers side
    所在地:
    72
    Heritage Railway Volunteer:
    No I do not currently volunteer
    But would any of those loco's be cpable of a long run or would they just be shunters?
     
  10. pgbffest

    pgbffest New Member

    注册日期:
    2018-06-17
    帖子:
    194
    支持:
    374
    性别:
    所在地:
    Somewhere with a lot of letters!
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    A solo Funkey will pull a failed train up a 1:40 (complete with Garratt). It won't get a lot of speed up, but it will do it - if all you are doing is getting it out the way, then you don't need anything else
     
    已获得kscanes的支持.
  11. mikehartuk

    mikehartuk New Member

    注册日期:
    2007-06-29
    帖子:
    107
    支持:
    515
    性别:
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Garratt Locomotive K1 - News Update


    Garratt K1 is now at the Statfold Narrow Gauge Museum Trust under a ten year loan agreement with Ffestiniog Railway Company. The current agreement is just for visual restoration and static display in the museum at Statfold. Since its arrival Statfold Narrow Gauge Museum Trust have though had a close look over the loco to assess the extent of work needed to return K1 to operational condition and have also checked that the engine would be able to fit their railway's loading gauge.


    SNGMT and FR Co are now working together toward a mutually beneficial deal whereby K1 will run at the Statfold Railway as well as be available for use on Welsh Highland Railway. To date we have mapped out both organisations aspirations and in the new year will look to develop those into a formal agreement. Nothing is finalised yet but both of our organisations have a will and passion to see K1 back in steam and at work on both of our railways.


    For and on behalf of Ffestiniog Railway Company and Statfold Narrow Gauge Museum Trust

    24th December 2019
     
    已获得black5, andrewshimmin, Bluenosejohn另外7人的支持.
  12. 30854

    30854 Resident of Nat Pres

    注册日期:
    2017-03-08
    帖子:
    12,172
    支持:
    11,496
    性别:
    职业:
    Retired
    所在地:
    Brighton&Hove
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I was cheered by news of the K1's move to Statfold. Given their superb track record, a more suitable base for this gem is hard to imagine and the notion of it being restored to running order is mouthwatering indeed ..... as well as (funding permitting) being a most logical move.

    The fact this historic loco is less than ideal for 'commercial' WHR services shouldn't really come as too much of a surprise to anyone, but given it's significance, finding a fitting role which allows future generations to see it in steam surely has to be welcomed by pretty much everyone.

    What d'ya say, folks? ..... If dual braking were to prove a feasible option, who wouldn't want to see this unique beastie not just at Statfold, but perhaps even heading for Devil's Bridge, or, assuming it fits the L&B loading gauge, simmering at Blackmoor Gate ...... nowt wrong with a modicum of optimism, Eh? ;)
     
    已获得andrewshimmin, Hunslet589, michaelh另外5人的支持.
  13. 48DL

    48DL Member

    注册日期:
    2008-07-21
    帖子:
    327
    支持:
    24
    所在地:
    North Warwickshire
    I agree, after all, its is the Season Of Goodwill and all that jazz
     
  14. MuzTrem

    MuzTrem Member

    注册日期:
    2011-03-13
    帖子:
    976
    支持:
    1,279
    Well, admittedly it is difficult to understand the promotion of the PBSSR otherwise. Given that the NWNGR had struggled financially for years, it ought to have been obvious from the start that electric power generation was likely to be a more profitable enterprise than operating a narrow-gauge railway through sparsely-populated country.
     
  15. MuzTrem

    MuzTrem Member

    注册日期:
    2011-03-13
    帖子:
    976
    支持:
    1,279
    已获得Mrcow的支持.

分享此页面