    As some have already mentioned, the building replaces the mk1 coach that the loco dept gave called home for many years. Apart from the mess room- which will triple the current seating capacity, there will be a training classroom, another room for undertaking railway medicals, and changing area, decent toilets and showers for both Male and female staff. The machine shop extension from the good shed is to house small lathes and tooling along with more bench space - allowing a reshuffle of the machines in the goods shed. It’s been a while coming, but we can’t wait to take ownership over the summer.
     
    Kinghambranch și jnc apreciază asta.
  3. Chuffington

    Chuffington New Member

    Înscris:
    25 Apr 2018
    Mesaje:
    98
    Aprecieri primite:
    63
    Sex:
    Masculin
    Locație:
    Cheltenham
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Ah but the GWR didnt build it, as most railways that were built at the time, it was built buy a seperate limited company, obvoiusly it was built to a price/time rather than properly, the railway is used as an example in Pway engineering on how not build cuttings and embankments!
     
  4. huochemi

    huochemi Part of the furniture

    Înscris:
    6 Mai 2008
    Mesaje:
    2.995
    Aprecieri primite:
    1.515
    Sex:
    Masculin
    Locație:
    UK
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I think the construction was let in several contracts. I don't think that absolves the GWR though as either they agreed with the method or they did not exercise enough oversight.
     
  5. jnc

    jnc Well-Known Member

    Înscris:
    3 Apr 2012
    Mesaje:
    1.511
    Aprecieri primite:
    2.709
    Sex:
    Masculin
    Locație:
    Western Atlantic
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Hence my careful use of the phrase "at Churchward House", after replacing 'in'! :)
    Excellent! So good to see all the physical plant improvements on the GWSR! A long way from the low point of the Chicken Curve severing.

    Noel
     
  6. Kinghambranch

    Kinghambranch Well-Known Member

    Înscris:
    20 Dec 2006
    Mesaje:
    1.879
    Aprecieri primite:
    1.612
    Sex:
    Masculin
    Ocupație:
    Retired
    Locație:
    White Rose County
    Heritage Railway Volunteer:
    No I do not currently volunteer
    The contractors for the Cheltenham to Honeybourne Line were Messrs Walter Scott & Middleton. They started work at Honeybourne towards the end of 1902. Hutted accommodation for navvies was provided at Toddington and Gretton. In November 1904, Colonel Yorke inspected the section from Broadway to Toddington. Two embankments showed signs of settlement and so he ordered that a watch be kept on them and a speed restriction of 10 mph be imposed. He found that Stanway/Toddington viaduct was perfectly sound (the viaduct had partially collapsed whilst under construction on Friday 13 November 1903 - due to formers being removed too early from the viaduct arches and a steam crane on the viaduct at the time hastened the accident which claimed 4 lives). On 26 January 1905, Colonel Yorke inspected the section from Toddington to Winchcombe with the 1st train running to there the following month. (From: The Honeybourne Line by Colin Maggs and Peter Nicholson)
     
  7. Breva

    Breva Well-Known Member

    Înscris:
    11 Oct 2010
    Mesaje:
    2.347
    Aprecieri primite:
    4.078
    Locație:
    Gloucestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    That's interesting, can you be more specific / quote your source?

    I know of one picture taken at CRC which was used to advertise the straightness of the track :)
     
  8. huochemi

    huochemi Part of the furniture

    Înscris:
    6 Mai 2008
    Mesaje:
    2.995
    Aprecieri primite:
    1.515
    Sex:
    Masculin
    Locație:
    UK
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I should have said two contracts, one from Honeybourne to Winchcombe, and one from Winchcombe to Cheltenham. (source GWR half year reports for 31 December 1902 and 30 June 1903)
     
  9. JJJ

    JJJ New Member

    Înscris:
    24 Iul 2007
    Mesaje:
    59
    Aprecieri primite:
    47
    Sex:
    Masculin
    Locație:
    Gloucestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I was looking at the recent S&T blog and thought I recalled a note sometime saying the Broadway signalling would be ready for start of this season.

    I assume that wont be the case, but wondered what still needs doing and likely commissioning date?

    All good work to date so just a nice to know
     
  10. Chuffington

    Chuffington New Member

    Înscris:
    25 Apr 2018
    Mesaje:
    98
    Aprecieri primite:
    63
    Sex:
    Masculin
    Locație:
    Cheltenham
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Don't know of the specific publication, but it is still used today.
    Ivor used to use it for reference.
     
  11. flying scotsman123

    flying scotsman123 Resident of Nat Pres

    Înscris:
    9 Sep 2013
    Mesaje:
    10.674
    Aprecieri primite:
    18.699
    Sex:
    Masculin
    Locație:
    Cheltenham
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Probably not until next running season now from what I can gather.

    Meanwhile the slip at Gotherington looks more frightening every time the drain gang photograph it, 2.7m now, with another storm and buckets of rain coming:

    [​IMG]

    I understand this is going to be soil nailed, like the Broadway slip was. Just watching our carriage shed slip further and further into the distance too...
     
  12. michaelh

    michaelh Part of the furniture

    Înscris:
    29 Apr 2006
    Mesaje:
    3.080
    Aprecieri primite:
    1.291
    Sex:
    Masculin
    Ocupație:
    Very comfortably early retired
    Locație:
    1029
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Is it close to the previous Gotherington slip?
     
  13. flying scotsman123

    flying scotsman123 Resident of Nat Pres

    Înscris:
    9 Sep 2013
    Mesaje:
    10.674
    Aprecieri primite:
    18.699
    Sex:
    Masculin
    Locație:
    Cheltenham
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    A bit further south.
     
    michaelh apreciază asta.
  14. Davo

    Davo Well-Known Member

    Înscris:
    12 Oct 2018
    Mesaje:
    1.539
    Aprecieri primite:
    649
    Sex:
    Masculin
    Locație:
    W yorkshire 56f
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Is this what storm ciara has done last w,end gosh thats quite bad could some hardcore stone be packed there and a bit of top soil to secure the railway enbankment or is that not feasable?
     
  15. flying scotsman123

    flying scotsman123 Resident of Nat Pres

    Înscris:
    9 Sep 2013
    Mesaje:
    10.674
    Aprecieri primite:
    18.699
    Sex:
    Masculin
    Locație:
    Cheltenham
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    It's been on the move for longer than that, it was first noticeably visible late last year but has sunk about a metre in the last month. A dry summer followed by a very, very wet winter. Just throwing rocks at it won't help much in the long term, BR found that too! No, a permanent solution is much better even if the cost looks a bit eye-watering. @Breva wrote a handy guide to soil nailing when it was being done at Broadway here.
     
  16. Ken_R

    Ken_R Member

    Înscris:
    31 Oct 2011
    Mesaje:
    309
    Aprecieri primite:
    177
    It will be dealt with Professionally. As I understand it, the hot, dry Summer didn't help. It unstabilized the interface between the Clay surface matter and the underlying material. We then had many weeks/months of excessive rainfall which caused the Clay material to take up moisture and become heavier. Hence the 'slip'.

    I believe the plan is, in the short term, to stabilize the supporting area for the 'running line' for the current Season, and to then deal with the matter such that the problem will then be resolved.
     
    Bluenosejohn și jnc apreciază asta.
  17. jnc

    jnc Well-Known Member

    Înscris:
    3 Apr 2012
    Mesaje:
    1.511
    Aprecieri primite:
    2.709
    Sex:
    Masculin
    Locație:
    Western Atlantic
    Heritage Railway Volunteer:
    No I do not currently volunteer
    To add to this, as discussed up-thread here, many of the GWSR earth-works used poor construction designs, in part because of limited understanding of such things at the time they were built. 'Patching' them just doesn't work, as BR found (e.g. at Chicken Curve). A proper well-engineered fix will give the GWSR sound infrastructure which it can rely on for a long time to come. The expense will delay some other much-desired infrastructure investments, but it's just a delay, not a cancellation. Luckily the GWSR is now healthy enough that it can handle these without threatening the line; in part because its heavy use of volunteers, instead of paid staff, reduces the amount of cash needed for normal operation.

    In this particular case, the drainage blog reports that site preparation is already underway, and as @Ken_R reports, work to stabilize the line for its use this running season will shortly commence.

    Noel
     
  18. 46229

    46229 New Member

    Înscris:
    17 Ian 2017
    Mesaje:
    62
    Aprecieri primite:
    165
    Locație:
    Toddington
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    There’s no urgency for it this year at least, so 2021 probably. Until platform 2 is opened for public use there’s no need for it. Having a working signal box at Broadway doesn’t increase the capacity of the line it just means you can run passenger trains into P2 and also you can remove the required stop board from the north end of P1.
     
  19. jnc

    jnc Well-Known Member

    Înscris:
    3 Apr 2012
    Mesaje:
    1.511
    Aprecieri primite:
    2.709
    Sex:
    Masculin
    Locație:
    Western Atlantic
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Yeah; I get impression from the S+T blog that it's a combination i) of a lot of distractions elsewhere, some unforeseen (e.g. the point damage; having to relocate lines at another slip site, including installing several line-side cabinets; etc), with a limited work-force to deal with them all; and ii) they don't really need the box, operationally, until the second platform comes into use, and that'll be a while yet (which has made diversion of S+T resources to other things, e.g. the refurbishment and installation of two point machines at Toddington, plausible and desirable). They may also be still collecting and training the people to operate it.

    But there has been a lot done since last spring, e.g. installing all the rodding and cabling, putting up posts and signals, and starting the work connecting it all up inside the box. I think dressing the bracket at Broadway is about to start. I think once that's done it's mostly connecting things up inside the box.

    Noel
     
    Last edited: 15 Feb 2020
  20. flying scotsman123

    flying scotsman123 Resident of Nat Pres

    Înscris:
    9 Sep 2013
    Mesaje:
    10.674
    Aprecieri primite:
    18.699
    Sex:
    Masculin
    Locație:
    Cheltenham
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I'd politely dispute that! It means you can have 2 trains north of Toddington at once, which does increase capacity, and could allow some different and more flexible timetables. It would also mean more room to run a freight train during a gala, my own personal hobby horse! :)

    Indeed, compounded by the fact that not only is there less money for the signalling stuff and more distractions for the signalling staff, but less money to finish of P2 as well so even less incentive to get the signalling up and working to allow its use! It'll all happen, just like the carriage shed, just got to be patient and sit tight, and carry on running a brilliant railway to fill the coffers up again.
     