If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Wensleydale Tour: 28/03/20

الموضوع في 'What's Going On' بواسطة sgthompson, بتاريخ ‏5 فبراير 2020.

  1. Jamessquared

    Jamessquared Nat Pres stalwart

    إنضم إلينا في:
    ‏8 مارس 2008
    المشاركات:
    27,811
    عدد المعجبين:
    64,528
    مكان الإقامة:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Ah strange - ‘cos I had it stretching from Bristol in the west to London in the east - and everywhere beyond that is classed as the north! It does suggest there’s a heck of a lot in the middle neither side wants! ;)

    Tom
     
    أعجب بهذه المشاركة henrywinskill
  2. Romsey

    Romsey Part of the furniture

    إنضم إلينا في:
    ‏14 جويلية 2007
    المشاركات:
    3,869
    عدد المعجبين:
    1,849
    الجنس:
    ذكر
    الوظيفة:
    Retired SPM
    مكان الإقامة:
    Close to Spike Island
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Sorry, my mistake, but at least it has caused some amusement.

    My view is a bit like the one Tom holds, except that Banbury, Willesden and Temple Mills were the border points. Southern crews didn't work any further north!

    Cheers, Neil
     
    أعجب بهذه المشاركة henrywinskill
  3. MarkinDurham

    MarkinDurham Well-Known Member

    إنضم إلينا في:
    ‏4 ماي 2007
    المشاركات:
    2,229
    عدد المعجبين:
    999
    مكان الإقامة:
    Durham
    Well, quite. Spare paths are becoming fewer and fewer at many 'choke points' across the network, and Leeds station is definitely one of them...
     
  4. The Black Hat

    The Black Hat Member

    إنضم إلينا في:
    ‏7 اكتوبر 2010
    المشاركات:
    860
    عدد المعجبين:
    399
    الوظيفة:
    Defender of the Faith
    مكان الإقامة:
    51F
    Uh oh! Are they not running back to back on the set this year... I thought it was changed to avoid 45mph on ECML. Last years trip only managed Bedale!
     
  5. Steamie Boxes

    Steamie Boxes Member

    إنضم إلينا في:
    ‏17 أوت 2017
    المشاركات:
    721
    عدد المعجبين:
    674
    الجنس:
    ذكر
    الوظيفة:
    Apprentice Enginner at NYMR
    مكان الإقامة:
    Cumbria
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I was on that tour and wasn't the issue being the 8Fs 50mph limit
     
    أعجب بهذه المشاركة Graft on
  6. The Black Hat

    The Black Hat Member

    إنضم إلينا في:
    ‏7 اكتوبر 2010
    المشاركات:
    860
    عدد المعجبين:
    399
    الوظيفة:
    Defender of the Faith
    مكان الإقامة:
    51F
    Off topic from: WCME

    The issue was that the 8F led the tour backwards at 45mph including the need to get the tour off the branch, across the down mainline and then onto the up slow at Northallerton. It had to be in place by then. Running back to back with two Jubilees would make life a lot easier to path it as the speed restriction for tender running wouldn't apply and I'm still sure NR don't like tender first on this area between Darlington and York.
     
  7. Will RL

    Will RL Member

    إنضم إلينا في:
    ‏12 جوان 2017
    المشاركات:
    767
    عدد المعجبين:
    1,166
    مكان الإقامة:
    Midlands
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Tender first operation dictates 45mph running regardless of 8F or Jubilee
     
  8. Steamage

    Steamage Part of the furniture

    إنضم إلينا في:
    ‏14 سبتمبر 2005
    المشاركات:
    4,751
    عدد المعجبين:
    1,126
    مكان الإقامة:
    Oxford
    Only if the leading loco is TF. With a loco at each end, facing in opposite directions, the train can run at the slowest loco's forward speed. A Jubilee at each end should allow the train to work at up to 75 mph. The problems occur when a tender is the thing leading a train across facing points and such like.
     
  9. 30567

    30567 Part of the furniture Friend

    إنضم إلينا في:
    ‏7 أوت 2012
    المشاركات:
    6,125
    عدد المعجبين:
    4,088
    So it all depends what the Westmorland Gazette means by double headed. I suspect it is loose language for back to back with a runaround at Holgate.
     
  10. Will RL

    Will RL Member

    إنضم إلينا في:
    ‏12 جوان 2017
    المشاركات:
    767
    عدد المعجبين:
    1,166
    مكان الإقامة:
    Midlands
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Assuming both locos work out of Carnforth chimney first, then one loco will be end up running tender first at some point. If they’re both somehow in a situation running chimney first at either end of the train on the T&T sections, then the limit would be 60mph, not the maximum capable of the lead loco.

    Thread drift though, is it worth these posts being moved to the appropriate thread?
     
    أعجب بهذه المشاركة 26D_M
  11. RalphW

    RalphW Nat Pres stalwart Staff Member Administrator Friend

    إنضم إلينا في:
    ‏11 سبتمبر 2005
    المشاركات:
    36,453
    عدد المعجبين:
    9,914
    الجنس:
    ذكر
    الوظيفة:
    Retired-ish, Part time rail tour steward.
    مكان الإقامة:
    Northwich
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Yes and they have. :)
     
    أعجب بهذه المشاركة Will RL

مشاركة هذه الصفحة