    I see there is a target figure for the next phase I.e. The factory flyover - has there ever been a cost estimate given for that sizeable embankment between this flyover and the canal bridge?


    Sent from my iPad using Tapatalk
     
  2. Johann Marsbar

    Johann Marsbar Well-Known Member

    Дата регистрации:
    21 фев 2016
    Сообщения:
    1.669
    Симпатии:
    2.180
    Пол:
    Мужской
    Адрес:
    Suffolk
    Heritage Railway Volunteer:
    No I do not currently volunteer
    From memory, the whole scheme was costed a few years back at £8-£9 million, but what savings have been made on the budgeted costs for the 2 phases completed, I don't know. There is still expediture required (after phase 3) on that embankment, the bridge by the Brush works and the embankment north of the MML. I think the shed removal phase has become seperate to the "gap" work now, though it obviously needs to be done in conjunction with the other works.
     
  3. class8mikado

    class8mikado Part of the furniture

    Дата регистрации:
    1 июн 2009
    Сообщения:
    3.840
    Симпатии:
    1.644
    Род занятий:
    Print Estimator/ Repository of Useless Informatio.
    Адрес:
    Bingley W.Yorks.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Lots more to do then, was under the impression that the bit between the new Rail bridge and old Canal bridge was mostly extant
     
  4. Johann Marsbar

    Johann Marsbar Well-Known Member

    Дата регистрации:
    21 фев 2016
    Сообщения:
    1.669
    Симпатии:
    2.180
    Пол:
    Мужской
    Адрес:
    Suffolk
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Nope.....

    17-1749a.jpg
     
  5. mogulb

    mogulb New Member

    Дата регистрации:
    20 дек 2010
    Сообщения:
    133
    Симпатии:
    95
    Was largely removed by BR to build the spur line connecting to GCRN.
     
    stallis1 нравится это.
  6. jnc

    jnc Well-Known Member

    Дата регистрации:
    3 апр 2012
    Сообщения:
    1.511
    Симпатии:
    2.709
    Пол:
    Мужской
    Адрес:
    Western Atlantic
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Well, it's all open ground...

    Noel
     
  7. pmh_74

    pmh_74 Part of the furniture

    Дата регистрации:
    28 янв 2009
    Сообщения:
    2.423
    Симпатии:
    1.707
    Indeed, but with a factory on the left which carries out precision engineering work and is concerned about vibration, and a stream on the right which the relevant authorities want to maintain digger access to, hence not just a simple matter of putting the original embankment back in.
     
    jnc нравится это.
  8. jnc

    jnc Well-Known Member

    Дата регистрации:
    3 апр 2012
    Сообщения:
    1.511
    Симпатии:
    2.709
    Пол:
    Мужской
    Адрес:
    Western Atlantic
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Any idea what approaches will be used to tackle those issues?

    Noel
     
  9. pmh_74

    pmh_74 Part of the furniture

    Дата регистрации:
    28 янв 2009
    Сообщения:
    2.423
    Симпатии:
    1.707
    I think something similar to the Heathrow Express construction at Airport Junction (which allows an 'embankment' with much steeper sides, hence smaller footprint) was talked about at one time, some years ago, but what the latest thinking is I'm afraid I don't know. All will be revealed in due course, no doubt!
     
  10. staffordian

    staffordian Well-Known Member

    Дата регистрации:
    27 мар 2012
    Сообщения:
    1.524
    Симпатии:
    2.172
    Пол:
    Мужской
    Род занятий:
    Retired
    Адрес:
    The Potteries
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I wonder if cwr rather than jointed track might reduce vibration, and maybe a greater ballast depth or a layer of something with some "give" in it under the track?

    I'll be interested to hear the solution.
     
  11. class8mikado

    class8mikado Part of the furniture

    Дата регистрации:
    1 июн 2009
    Сообщения:
    3.840
    Симпатии:
    1.644
    Род занятий:
    Print Estimator/ Repository of Useless Informatio.
    Адрес:
    Bingley W.Yorks.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Cork Underlay....
     
    Wenlock, ilvaporista, 2392 и 3 другим нравится это.
  12. staffordian

    staffordian Well-Known Member

    Дата регистрации:
    27 мар 2012
    Сообщения:
    1.524
    Симпатии:
    2.172
    Пол:
    Мужской
    Род занятий:
    Retired
    Адрес:
    The Potteries
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Ahh, but on top of chipboard or something else? :D
     
  13. Thompson1706

    Thompson1706 Part of the furniture

    Дата регистрации:
    19 ноя 2007
    Сообщения:
    2.524
    Симпатии:
    1.886
    Пол:
    Мужской
    Род занятий:
    Retired
    Адрес:
    Rhiwabon
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Polystyrene blocks ?

    Bob.
     
  14. std tank

    std tank Part of the furniture

    Дата регистрации:
    20 сен 2005
    Сообщения:
    3.927
    Симпатии:
    1.070
    Пол:
    Мужской
    Род занятий:
    Retired
    Адрес:
    Liverpool
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    When Network Rail/Railtrack were refurbishing the bridge over the Manchester ship canal at Irlam on the CLC Liverpool to Manchester line, they did away with the bridge that took the line over the original course of River Irwell. Polystyrene blocks were used for the infill to create the new embankment.
     
  15. crantock

    crantock Member

    Дата регистрации:
    22 ноя 2008
    Сообщения:
    528
    Симпатии:
    276
    Пол:
    Мужской
    Род занятий:
    Beancounter
    Адрес:
    Birmingham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Poly blocks were used on the Nuneaton link from flyover to platform. Need to be well covered though as lineside fires could be interesting.


    Sent from my iPhone using Tapatalk
     
  16. Flying Phil

    Flying Phil Part of the furniture

    Дата регистрации:
    10 дек 2018
    Сообщения:
    3.018
    Симпатии:
    6.319
    Пол:
    Мужской
    Адрес:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The Canal bridge is still awaiting the lattice girders, but more brickwork pointing etc has been done.
    Here are two pictures, taken today, of the site for the "Factory Flyover" bridges and arches for phase 3 and 4. There were three orange clad people, further down towards the engine shed, on the embankment base. DSCF7615.JPG DSCF7617.JPG
     
    Goldie и AndyY нравится это.
  17. class8mikado

    class8mikado Part of the furniture

    Дата регистрации:
    1 июн 2009
    Сообщения:
    3.840
    Симпатии:
    1.644
    Род занятий:
    Print Estimator/ Repository of Useless Informatio.
    Адрес:
    Bingley W.Yorks.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Perhaps someone was going to get 'Tangoed'
     
  18. ianh

    ianh Member

    Дата регистрации:
    10 май 2006
    Сообщения:
    335
    Симпатии:
    194
    Род занятий:
    Farmer -
    Адрес:
    Brecon In Wettest Wales
    What is the relationship of the 2nd photo to Factory Flyover?
     
  19. mogulb

    mogulb New Member

    Дата регистрации:
    20 дек 2010
    Сообщения:
    133
    Симпатии:
    95
    To the right of the picture are the remains of bridge abutment that went over the road that leads to the council tip, this will now be bridged by one of ex Reading bridge decks. New abutments either side of the road. Second reading span to the right and then two concrete arches to connect to the MML bridge.
     
    jnc нравится это.
  20. Flying Phil

    Flying Phil Part of the furniture

    Дата регистрации:
    10 дек 2018
    Сообщения:
    3.018
    Симпатии:
    6.319
    Пол:
    Мужской
    Адрес:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    As Mogulb says....but here is another picture which might make it clearer.... DSCF7616.JPG
    On the extreme right is the new MML bridge. Then it is anticipated there will be two blue brick faced concrete arches, two Ex Reading bridge decks with one crossing the road, then two more arches (needed to get the height needed for tall lorries to access the tip). This will be, to this side of the old brick abutment, just on the corner of the road.
     