If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Co-Bo D5705

本贴由 730872009-09-17 发布. 版块名称: Diesel & Electric Traction

  1. Rob Mason

    Rob Mason New Member

    注册日期:
    2020-03-10
    帖子:
    5
    支持:
    20
    性别:
    所在地:
    Bury, Manchester
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    V8 liner removal
     

    附件文件:

    已获得Steve BMonkey MagicJohnme101的支持.
  2. Rob Mason

    Rob Mason New Member

    注册日期:
    2020-03-10
    帖子:
    5
    支持:
    20
    性别:
    所在地:
    Bury, Manchester
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Traction Motor Blower in the cooler group
     

    附件文件:

    已获得Steve BMonkey MagicJohnme101的支持.
  3. Rob Mason

    Rob Mason New Member

    注册日期:
    2020-03-10
    帖子:
    5
    支持:
    20
    性别:
    所在地:
    Bury, Manchester
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Wiring has been terminated and brake frame reassembled
     

    附件文件:

    已获得Ganger, brmp201, Steve B另外2人的支持.
  4. misspentyouth62

    misspentyouth62 Well-Known Member

    注册日期:
    2017-11-08
    帖子:
    1,795
    支持:
    2,360
    性别:
    所在地:
    34D, now flexible
    Heritage Railway Volunteer:
    No I do not currently volunteer
    is there an overall prognosis and planned return do you know Rob?
     
  5. ssk2400

    ssk2400 New Member

    注册日期:
    2010-11-14
    帖子:
    180
    支持:
    40
    性别:
    职业:
    electrical engineer
    所在地:
    South cumbria
    Heritage Railway Volunteer:
    No I do not currently volunteer
    hi i am confused which is easily done do the co bo have two engines a v12 and a v8 ?
     
  6. Rob Mason

    Rob Mason New Member

    注册日期:
    2020-03-10
    帖子:
    5
    支持:
    20
    性别:
    所在地:
    Bury, Manchester
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    @misspentyouth62 The V8 has had a crankshaft bearing (there are several on the crank) that had 'picked up' whilst in service (the white metal on the bearing had become too hot). We've got others recovered from the V12 that will fit. The troublesome reed valves (it's a 2 stroke and had a habit of ingesting them causing the PU to smoke badly) have been replaced with good ones from the V12. All being well the PU will be built back up in the next 2 years. As for time until it is running ... it would be foolish of me to speculate. However, it is closer to running now than it has been in the last 45 years (at least!)

    @ssk2400 The V8 is the correct PU for the loco. The V12 was bought as a source of spares. Crossley made some of the PU types with standard parts, so they could be changed with ease. The V8 & V12 are both HST engines, but with some minor differences. The spares sourced from the V12, which had really low engine hours, will go into the V8 when we rebuild it.
     
    已获得Richard Roperpaullad19845944的支持.
  7. ssk2400

    ssk2400 New Member

    注册日期:
    2010-11-14
    帖子:
    180
    支持:
    40
    性别:
    职业:
    electrical engineer
    所在地:
    South cumbria
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Hi thanks for that whats a HST engine ?
     
  8. buzby2

    buzby2 Well-Known Member

    注册日期:
    2009-03-26
    帖子:
    1,721
    支持:
    591
    所在地:
    Swanage
    Crossley Brothers [established 1867] developed a wide range of diesel engines for railway, marine and stationary power uses.
    Marine engines had durability and reliability but their locomotive engines did not.
    Apparently one of its (successful) WW2 Patrol Boat engines was re-engineered for railway service of which one type became the HST V8.
     
  9. Mandator

    Mandator Part of the furniture

    注册日期:
    2015-02-12
    帖子:
    4,875
    支持:
    3,052
    性别:
    Heritage Railway Volunteer:
    No I do not currently volunteer

分享此页面