If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Current and Proposed New-Builds

本贴由 aron332017-08-15 发布. 版块名称: Steam Traction

  1. GWR4707

    GWR4707 Nat Pres stalwart

    注册日期:
    2006-05-12
    帖子:
    19,346
    支持:
    17,834
    性别:
    所在地:
    Cumbria
    Heritage Railway Volunteer:
    No I do not currently volunteer
    4709 has a new/updated website. https://www.4709.org.uk/
     
  2. jnc

    jnc Well-Known Member

    注册日期:
    2012-04-03
    帖子:
    1,515
    支持:
    2,711
    性别:
    所在地:
    Western Atlantic
    Heritage Railway Volunteer:
    No I do not currently volunteer
    That's been around for a while, but it does seem to have been re-organized; my bookmarked Latest News page there seems to have disappeared. The new blog page is a welcome addition/replacement, though. Good news about the cylinder patterns!

    Noel
     
    已获得240P15KinghambranchNick C的支持.
  3. GWR4707

    GWR4707 Nat Pres stalwart

    注册日期:
    2006-05-12
    帖子:
    19,346
    支持:
    17,834
    性别:
    所在地:
    Cumbria
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Hence I added 'updated', although unhelpfully it doesn't give any details that I can see of explaining how visitors can support the project unlike its predecessor.
     
    已获得jnc的支持.
  4. MellishR

    MellishR Resident of Nat Pres Friend

    注册日期:
    2009-04-16
    帖子:
    9,061
    支持:
    5,966
    Each item is dated, but only by month and day, with no indication of year. For example "Sat at Didcot for decades, 4709’s tender will soon return, coupled to our 2-8-0 monster" is dated MAR 5. Obviously not this year, but was it 2019 or earlier?
     
  5. aron33

    aron33 Member

    注册日期:
    2016-05-22
    帖子:
    519
    支持:
    635
    性别:
    职业:
    Food packaging worker
    所在地:
    Mayfield, KY (USA)
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Hi everyone. I’m back, and am safe at the moment.
    I’m sure everyone knows of the current situation regarding Covid-19 and the impact it is having on the Heritage Railway scene.
     
    已获得240P15的支持.
  6. Richard Roper

    Richard Roper Well-Known Member

    注册日期:
    2006-05-22
    帖子:
    1,310
    支持:
    1,359
    性别:
    职业:
    Librarian
    所在地:
    Just up the road from 56E Sowerby Bridge
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Excellent! A couple of questions:

    1. What are the cylinders off which are shown in the photo on the blog?
    2. Where will 4709 be moving to?

    Good Luck with the project once all this Covid 19 stuff is over!

    Richard.
     
  7. aron33

    aron33 Member

    注册日期:
    2016-05-22
    帖子:
    519
    支持:
    635
    性别:
    职业:
    Food packaging worker
    所在地:
    Mayfield, KY (USA)
    Heritage Railway Volunteer:
    No I do not currently volunteer
    1. Those are the patterns for the cylinders, and
    2: I do not know.
     
  8. Richard Roper

    Richard Roper Well-Known Member

    注册日期:
    2006-05-22
    帖子:
    1,310
    支持:
    1,359
    性别:
    职业:
    Librarian
    所在地:
    Just up the road from 56E Sowerby Bridge
    Heritage Railway Volunteer:
    No I do not currently volunteer
    No, I was meaning the cylinders in this photo:

    Richard.
    _PSF7092.jpg
     
    已获得240P15的支持.
  9. ghost

    ghost Part of the furniture

    注册日期:
    2006-05-29
    帖子:
    4,354
    支持:
    5,871
    性别:
    所在地:
    N.Ireland
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    2861

    Keith
     
    已获得jncRichard Roper的支持.
  10. Richard Roper

    Richard Roper Well-Known Member

    注册日期:
    2006-05-22
    帖子:
    1,310
    支持:
    1,359
    性别:
    职业:
    Librarian
    所在地:
    Just up the road from 56E Sowerby Bridge
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Aha! Cheers Keith, it makes sense now - The new smokebox won't fit the saddle on 2861's cylinder block, it's a larger diameter.

    Richard.
     
  11. ghost

    ghost Part of the furniture

    注册日期:
    2006-05-29
    帖子:
    4,354
    支持:
    5,871
    性别:
    所在地:
    N.Ireland
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    They have changed the plan now and are having new cylinders cast to the original design.

    Keith
     
    已获得Richard Roper的支持.
  12. MellishR

    MellishR Resident of Nat Pres Friend

    注册日期:
    2009-04-16
    帖子:
    9,061
    支持:
    5,966
    Two questions:
    If the cylinders from 2861 are now not going to be used, why are they still attached to the frames in that picture?
    And is the plan still to fit a No. 7 boiler in the fullness of time (with the saddle on the new castings dimensioned accordingly) and to make a temporary arrangement to take a No. 1 boiler?
     
  13. 60044

    60044 Member

    注册日期:
    2016-02-24
    帖子:
    899
    支持:
    1,303
    性别:
    所在地:
    Salisbury
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I think it hasbeen announced that they have now decided to go for a new No. 7 boiler.
     
  14. ghost

    ghost Part of the furniture

    注册日期:
    2006-05-29
    帖子:
    4,354
    支持:
    5,871
    性别:
    所在地:
    N.Ireland
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    As far as I am aware the plan is to build a new No7 boiler which would then fit the new build original design cylinders/saddle. I don't think they are going to use the No1 boiler now. I assume the cylinders are still in the frames for rigidity purposes and maybe some measurements, until such time that the new cylinders are cast, machined and can be swapped in.

    Keith
     
  15. Thompson1706

    Thompson1706 Part of the furniture

    注册日期:
    2007-11-19
    帖子:
    2,557
    支持:
    1,916
    性别:
    职业:
    Retired
    所在地:
    Rhiwabon
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The cylinders shown in the photograph aren't physically attached, just held in place by gravity.

    Bob.
     
    已获得ghost的支持.
  16. Gav106

    Gav106 Well-Known Member

    注册日期:
    2010-03-29
    帖子:
    1,772
    支持:
    2,171
    所在地:
    Nantwich, Cheshire
    Out of interest, how much a year are the 4709 group currently raising?
     
  17. Hunslet589

    Hunslet589 New Member

    注册日期:
    2017-03-19
    帖子:
    126
    支持:
    220
    性别:
    所在地:
    Oxfordshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    To reiterate what was posted back in May of last year :

    Cylinders:
    While the original intent was to use the spare castings from 2861 plans have changed. First off the pair need to be split to allow confirmation of the integrity of each. The possibility exists of finding something nasty in which case all the effort is wasted ..

    Assuming all is OK the block still has problems as it stands:
    • As said, the curvature of the saddle is wrong for the no7 boiler (see below),
    • The boiler pitch is too high for the NR loading gauge - about 2 inches needs to be removed
    • Once you have done that the block is still too wide for the NR loading gauge severely restricting main line usage - if any.
    So a lot of work to make the existing block usable and the decision was taken to go for new with a few detail changes to take care of these problems. The latest newsletter shows the poly patterns for these complete and the casting of the new blocks was apparently only a few days away when the foundry shut down due to the virus situation.

    The 28xx blocks are probably still on the frames as having been in position to help with the setting up of the extension frames etc, there has, to date, been no need to remove them - and wont be until the replacements are ready in due course/eventually.

    Boiler:
    The available no1 boiler is in ex Barry condition with all that this entails. It could require a lot spending on it to make it serviceable and probably more at the first 10 year overhaul and more after that. New boilers are currently under construction for other projects so the capacity has been proven to exist. Hence the decision has been made to go for a new no 7 boiler and ensure (hopefully) a trouble free period of operation. So the plan to use the no1 boiler even as a temporary measure has been dropped.

    M
     
    已获得David Humphreys, Bluenosejohn, ghost另外1人的支持.
  18. Richard Roper

    Richard Roper Well-Known Member

    注册日期:
    2006-05-22
    帖子:
    1,310
    支持:
    1,359
    性别:
    职业:
    Librarian
    所在地:
    Just up the road from 56E Sowerby Bridge
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Thank you for this!

    So, is the boiler centreline actually going to be lowered by 2" from original then, or is it sat at the correct height when using the new cylinders / saddle?

    Sorry for all the questions!

    Richard.
     
  19. class8mikado

    class8mikado Part of the furniture

    注册日期:
    2009-06-01
    帖子:
    3,883
    支持:
    1,667
    职业:
    Print Estimator/ Repository of Useless Informatio.
    所在地:
    Bingley W.Yorks.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Is the no 7 boiler similar in size to the castle boiler ?
     
  20. Jimc

    Jimc Part of the furniture

    注册日期:
    2005-09-08
    帖子:
    4,119
    支持:
    4,822
    职业:
    Once computers, now part time writer I suppose.
    所在地:
    SE England
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Bigger. The Castle boiler is basically a Standard 7 with a reduced diameter barrel to get the weight down.
     

分享此页面