If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

S&D Railway Trust

本贴由 Andy Norman2020-02-24 发布. 版块名称: Heritage Railways & Centres in the UK

  1. Snifter

    Snifter Well-Known Member

    注册日期:
    2014-08-26
    帖子:
    1,692
    支持:
    4,298
    性别:
    Heritage Railway Volunteer:
    No I do not currently volunteer
    So if the head of infrastructure who is known to be very much his own man were to suddenly depart, then he could be replaced by someone much more compliant. Has anyone seen the long standing jobholder of late ?

    The cost of fixing the wheels of the 4F was worked out using locally available coded welders and volunteer labour. The official cost of ~£1M was stated on the basis of the work being done at Tyseley hence the loco was sent away. The departure of 4110 was down to the Dear Leader and now we face the same outcome for "88". As Lady Bracknell would have said, "to lose one locomotive is unfortunate, but to lose three..."
     
  2. Another Lancastrian

    Another Lancastrian New Member

    注册日期:
    2015-03-28
    帖子:
    29
    支持:
    65
    性别:
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    But has not the Head of Infrastructure already departed? Seem to recall a message to that effect some little time ago and an advertisement for a replacement was published on 3rd March on the WSR website
     
  3. Snifter

    Snifter Well-Known Member

    注册日期:
    2014-08-26
    帖子:
    1,692
    支持:
    4,298
    性别:
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Nail, head, hit.

    One can presume that as with other senior positions, the most qualified applicant who scores the highest at interview will be selected for the role.
     
  4. 35B

    35B Nat Pres stalwart

    注册日期:
    2011-06-18
    帖子:
    28,739
    支持:
    28,683
    性别:
    所在地:
    Grantham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I seem to remember that the ORR inspection that led to last winter’s extended closedown was the result of a report to ORR. That suggests that self certification has limits, if Machiavellian* tactics are feared.

    * As an aside, according to reviews of a recent biography of Niccolo Machiavelli, he was useless at the tactics that bear his name.


    Sent from my iPad using Tapatalk
     
  5. ghost

    ghost Part of the furniture

    注册日期:
    2006-05-29
    帖子:
    4,306
    支持:
    5,737
    性别:
    所在地:
    N.Ireland
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Was the work on the 4F's wheels actually completed, or just costed?

    If you include 6695, that's 3 locos lost already, even before the situation with 88 is resolved

    Keith
     
  6. Matt78

    Matt78 Well-Known Member

    注册日期:
    2007-06-27
    帖子:
    1,730
    支持:
    3,868
    职业:
    Solicitor
    所在地:
    South Wales
    In a nutshell - the WSR decide what standards they want to work to (SMS) and must ensure themselves those standards are being maintained.

    the ORR would have the powers to issue a prohibition notice preventing operations if they felt either a) the standards were not being met or b) the standards were not good enough.

    basically it’s the same for every heritage line, no matter what size.

    regards

    Matt
     
  7. 45076

    45076 Member

    注册日期:
    2011-09-15
    帖子:
    478
    支持:
    313
    性别:
    职业:
    Retired
    所在地:
    34004
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Williton 14/3/1976
     

    附件文件:

  8. free2grice

    free2grice Part of the furniture Friend

    注册日期:
    2005-09-19
    帖子:
    5,625
    支持:
    3,616
    性别:
    职业:
    Retired Rolls-Royce engineer
    所在地:
    Bath Green Park / Mangotsfield
    Heritage Railway Volunteer:
    No I do not currently volunteer
    已获得45076的支持.
  9. MattA

    MattA Member

    注册日期:
    2014-08-11
    帖子:
    325
    支持:
    378
    所在地:
    82F
    Heritage Railway Volunteer:
    No I do not currently volunteer
    When the 4F arrived at the CVR after moving from the WSR, it was stated that "44422 is not in working order. However, the Churnet Valley Railway will be completing a full assessment in 2020."

    I'm not an insider so I don't know for sure, but it wouldn't surprise me if the wheels were not repaired before it moved back to Cheddleton.
     
    已获得nick glanfghost的支持.
  10. dunghill1

    dunghill1 New Member

    注册日期:
    2011-01-02
    帖子:
    65
    支持:
    61
    性别:
    职业:
    retired
    所在地:
    williton
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Yes 53808 was restored by the WSR before it was fit for use but the work done on the locomotive was paid for by the S & D Trust
     
    已获得jncAberdare的支持.
  11. jma1009

    jma1009 Well-Known Member

    注册日期:
    2013-03-16
    帖子:
    1,392
    支持:
    1,639
    性别:
    所在地:
    ynysddu south wales
    The experts on all this psychological stuff might want to comment on whether JJP has a 'confirmatory bias' against the SDRT?

    I don't myself understand why anyone would be so 'anti' the SDRT at Washford... Perhaps he feels the workshop staff and loco crews should not be so keen on loco '88', and should instead be doing work on his own loco 'Kinlet Hall', and that he has a 'GWR' mindset?

    Seems odd for a 'bus man', whatever way you look at it!

    Cheers,

    Julian
     
  12. Lplus

    Lplus Well-Known Member

    注册日期:
    2011-11-24
    帖子:
    1,919
    支持:
    991
    所在地:
    Waiting it out.
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    That seems a bit of an odd idea - isn't he the boss and can thus tell the staff to work on what he wants?
     
  13. martin1656

    martin1656 Nat Pres stalwart Friend

    注册日期:
    2014-12-08
    帖子:
    19,266
    支持:
    12,517
    性别:
    所在地:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    be poetic justice if at the end, Kinlet Hall ends up being the loco leaving , because he is not just ousted but banned for life from the railway.
     
  14. Piggy

    Piggy Member

    注册日期:
    2020-02-28
    帖子:
    250
    支持:
    327
    性别:
    所在地:
    Somerset
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    He doesn't own it, he's not the boss, just a temporary chairman.
     
    已获得tracker, ross, baldbazza另外2人的支持.
  15. jma1009

    jma1009 Well-Known Member

    注册日期:
    2013-03-16
    帖子:
    1,392
    支持:
    1,639
    性别:
    所在地:
    ynysddu south wales
    Well, 'Piggy' I hope you are correct, but I have my doubts; the multitudinous WSR PLC shareholders seem to be 'leeming sheep' and happy to give JJP their proxy votes; the WSRA is impotent, and the WSSRT shareholding via it's board of trustees is in support of JJP over his stance on Washford and the SDRT.

    Not a happy state of affairs.

    No one can call a WSR PLC EGM because of the lack of a majority shareholding, and by the time of the next WSR PLC AGM the time limits for court action over Washford and the SDRT will not have expired and come to a head, and likely as not JJP will do another flanneling exercise and potentially get away with it.

    Frankly, in the current circumstances it would have been better if the Ex-6 trustees of the WSRA had got the lease of the line to control the WSR PLC, and some very clever people were not so clever at the time. All they got control of was the WSRA that has no influence on the WSR PLC due to the minority shareholding the WSRA has!

    Those who invited JJP to join the WSR PLC board and elect him subsequently as Chairman, and those very clever people distracted by the Ex-6 Trustees of the WSRA in personal animosity and hatred to get rid of them, but not see the bigger picture, really ought to take stock as to what they have done for the WSR as a whole, and in my case particularly with regard to SDRT loco '88' and the SDRT at Washford.

    Happy Easter!

    Cheers,

    Julian
     
    已获得trackerWriggley的支持.
  16. City of truro fan

    City of truro fan Member

    注册日期:
    2015-11-29
    帖子:
    795
    支持:
    90
    性别:
    所在地:
    Honiton
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I would say if you are cancelling my agreement to have a museum then I’d cancel back my agreement that they have of 88 they won’t see that coming and would loose a good engine
     
  17. ghost

    ghost Part of the furniture

    注册日期:
    2006-05-29
    帖子:
    4,306
    支持:
    5,737
    性别:
    所在地:
    N.Ireland
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Really? You think that no one would have thought of that?

    Besides, the loan is a legal agreement. You can't just tear it up because of how someone treats you (no matter how bad) - you need to have legal reasons to cancel, and make sure those reasons would stand up in court.

    Keith
     
    已获得MattA, Jamessquared, RailWest另外2人的支持.
  18. 60044

    60044 Member

    注册日期:
    2016-02-24
    帖子:
    782
    支持:
    1,207
    性别:
    所在地:
    Salisbury
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    ..... but equally, you can enforce the WSR to honour its side of the legal agreement, which they have already indicated they may try to weasel out of. I can't the the S&DRMT having much sympathy for the "we can't afford it so we expect you to let us off" argument after they have had 10yrs use out of it.

    By the way, where did an estimate of £1M mentioned upthread to repair the LMS 4F's wheel cracks come from. A similar repair to 61264's wheels came to a tenth of that. I reckon that it would be possible to make a pattern , cast and machine new wheels and tyres for less than £1M!
     
    已获得BrightonBalticross的支持.
  19. ghost

    ghost Part of the furniture

    注册日期:
    2006-05-29
    帖子:
    4,306
    支持:
    5,737
    性别:
    所在地:
    N.Ireland
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Absolutely!

    Keith
     
    已获得BrightonBaltic的支持.
  20. flying scotsman123

    flying scotsman123 Resident of Nat Pres

    注册日期:
    2013-09-09
    帖子:
    10,674
    支持:
    18,700
    性别:
    所在地:
    Cheltenham
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    If that quote of a quote (if you see what I mean) for a million pounds is accurate, then it sounds like someone's purposely slapped a huge price tag on something so it would be put in the "too difficult" pile. I remember when there was a hoo-hah over the canopy at Broadway it was said that an authentic one would have cost over £100,000. Eventually after a lot of lobbying it we got it and it cost us £10,000.
     
    已获得tracker, Wriggley, Greenway另外7人的支持.

分享此页面