    Yes I am an active volunteer
    Now that trains have stopped running the real work has started.
    A sure sign of this is the appearance of Nigel's News, the first issue is attached.

    Working in a flood at the top of the hill.
    https://www.nymr.co.uk/blog/civil-engineering-diary-19-november-2019


    https://www.nymr.co.uk/nymr-is-building-bridges-for-the-future-ymj

    https://twitter.com/nymr/status/1197416895894429697?s=19
     
  2. Ploughman

    Ploughman Part of the furniture

    Joined:
    Apr 1, 2008
    Messages:
    5,806
    Likes Received:
    2,649
    Occupation:
    Ex a lot of things.
    Location:
    Near where the 3 Ridings meet
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Still waiting for the next isue of Nigel's News, until then some notes on work todate.
    Now that the train crews have finally gone home we can come out to play.

    Br 27 at Goathland is the big project this winter.
    2/3rds of it to be replaced with a new bridge.
    The bridge under the 2 tracks to the right is to be replaced.
    Following the arrival before Christmas of the new bridge from Cleveland Bridge on Teeside and the deliver this week of the 2 KIROW Cranes that will do the heavy lifting.
    The UP line has now been removed ready for excavation into spoil wagons for disposal.
    After the Up then the Down will be removed and dug out before bridge works can proceed.
    BR 27 view North.jpg
    Site cabins, temporary access from the road and S+T dismantling.

    81601 view South to Fylingdales.jpg

    Br 27 2 Kirow Plasser 12t, + Mega railer.jpg
    The plant on site is a bit on the serious side. As seen in the photo, 1 Kirow alongside the Signal box the other can be seen through the arch of the bridge.
    Not one but Two KIROW Cranes on a break from mainline duties.
    A Colmar MEGARAILER and our own resident 12t Plasser crane removing track.

    All photos here are from publically accesible positions as of today.
    There is no access to site other than by the booked personnel for the job.
     
    brmp201, Romsey, weltrol and 5 others like this.
  3. Ploughman

    Ploughman Part of the furniture

    Joined:
    Apr 1, 2008
    Messages:
    5,806
    Likes Received:
    2,649
    Occupation:
    Ex a lot of things.
    Location:
    Near where the 3 Ridings meet
    Heritage Railway Volunteer:
    Yes I am an active volunteer
  4. Sidmouth4me

    Sidmouth4me Member

    Joined:
    May 26, 2011
    Messages:
    204
    Likes Received:
    317
    Gender:
    Male
    Occupation:
    Retired
    Location:
    Malton
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    jnc likes this.
  5. Sidmouth4me

    Sidmouth4me Member

    Joined:
    May 26, 2011
    Messages:
    204
    Likes Received:
    317
    Gender:
    Male
    Occupation:
    Retired
    Location:
    Malton
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    At Fen Bog all the replacement sleepers have now been laid and existing rails put back and joined up to the exiting track.
     

    Attached Files:

    banburysaint, jnc and Bluenosejohn like this.
  6. Ploughman

    Ploughman Part of the furniture

    Joined:
    Apr 1, 2008
    Messages:
    5,806
    Likes Received:
    2,649
    Occupation:
    Ex a lot of things.
    Location:
    Near where the 3 Ridings meet
    Heritage Railway Volunteer:
    Yes I am an active volunteer
  7. Ploughman

    Ploughman Part of the furniture

    Joined:
    Apr 1, 2008
    Messages:
    5,806
    Likes Received:
    2,649
    Occupation:
    Ex a lot of things.
    Location:
    Near where the 3 Ridings meet
    Heritage Railway Volunteer:
    Yes I am an active volunteer
  8. Ploughman

    Ploughman Part of the furniture

    Joined:
    Apr 1, 2008
    Messages:
    5,806
    Likes Received:
    2,649
    Occupation:
    Ex a lot of things.
    Location:
    Near where the 3 Ridings meet
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    No bridge updates recently, but we have been doing more run of the mill works in the meantime.

    A little bit of rerailing, changing FB98 of 1950 vintage for some brand new FB 113A in old money.
    From Summit down to Moorgates, photos taken by a number of different people and not in any order.
    A few shots showwing our BORAIL Wagon in use. Does anyone else have one set up like this?

    Brake van breakfast 22-2-20.jpg Rail offload 22-2-20.jpg Rerail 22-2-20.jpg BORAIL 22-2-20.jpg 20200223_094856.jpg 20200223_130019.jpg
    Brake van breakfast 22-2-20.jpg Rail offload 22-2-20.jpg Rerail 22-2-20.jpg
     
  9. Ploughman

    Ploughman Part of the furniture

    Joined:
    Apr 1, 2008
    Messages:
    5,806
    Likes Received:
    2,649
    Occupation:
    Ex a lot of things.
    Location:
    Near where the 3 Ridings meet
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    KIROW 81601 + 73307 Newbridge NYMR 6-3-20.jpg KIROW 81601 Newbridge NYMR 6-3-20.jpg Led to believe all bridge lifts for 27 and 8 have all been completed.
    The KIROW crane is now in Newbridge awaiting a move date but is having a few days servicing first.
    KIROW 81601 + 73307 Newbridge NYMR 6-3-20.jpg KIROW 81601 Newbridge NYMR 6-3-20.jpg
     
    2392, Davo, Hugh Perrett and 4 others like this.
  10. Ploughman

    Ploughman Part of the furniture

    Joined:
    Apr 1, 2008
    Messages:
    5,806
    Likes Received:
    2,649
    Occupation:
    Ex a lot of things.
    Location:
    Near where the 3 Ridings meet
    Heritage Railway Volunteer:
    Yes I am an active volunteer
  11. Sidmouth4me

    Sidmouth4me Member

    Joined:
    May 26, 2011
    Messages:
    204
    Likes Received:
    317
    Gender:
    Male
    Occupation:
    Retired
    Location:
    Malton
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Keep up the good work!
    Ps Nigel’s update ought to be dated 10th March (rather than February).
     
    Last edited: Mar 11, 2020
  12. Sidmouth4me

    Sidmouth4me Member

    Joined:
    May 26, 2011
    Messages:
    204
    Likes Received:
    317
    Gender:
    Male
    Occupation:
    Retired
    Location:
    Malton
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Out dropping ballast on a 1 mile stretch between Pickering and Levisham.
     

    Attached Files:

    banburysaint likes this.
  13. Ploughman

    Ploughman Part of the furniture

    Joined:
    Apr 1, 2008
    Messages:
    5,806
    Likes Received:
    2,649
    Occupation:
    Ex a lot of things.
    Location:
    Near where the 3 Ridings meet
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Total of 3 stone trains today with a convoy of tippers running stone from the Dales into Newbridge.
    Some stone did not even stay in the yard for 10 minutes before being loaded and taken away.



    12-3-20 Stone tip run.jpg Back in the yard a first for me.
    The provision of Rubber crossing panels in pointwork. Seen plenty on plain line but not in pointwork. This unit will be the turnout into the new carriage stable.

    20200312_085402.jpg

    Also back in the yard the Regulator was undergoing Air Brake system checks.
    20200312_112401.jpg 20200312_112415.jpg
    Thats it 5 minutes and another 40 - 50 tonnes gone.
    All stone gone.jpg
     
  14. banburysaint

    banburysaint Member

    Joined:
    Jan 12, 2008
    Messages:
    310
    Likes Received:
    368
    jnc and RLinkinS like this.
  15. 46118

    46118 Part of the furniture

    Joined:
    Sep 16, 2005
    Messages:
    4,043
    Likes Received:
    212

    Does any kind soul have an update as to how far the winter work progressed before lockdown?
    ( I have been checking the NYMR website to see if a further update has been posted since the 10th March one linked above.)

    Any update appreciated.
     
  16. Brunswick Green 2

    Brunswick Green 2 Member

    Joined:
    Mar 9, 2013
    Messages:
    214
    Likes Received:
    89
    Might be worth subscribing to Moors Express via NYMR website. Monthly updates but not sure for how long.
     
  17. banburysaint

    banburysaint Member

    Joined:
    Jan 12, 2008
    Messages:
    310
    Likes Received:
    368
    The track across the new bridge at Goathland has been laid on one line but has yet to ballasted, tamped, the other line has yet to be completed. Moors Express sign up link below https://1460523-88bbb5.sibpages.com/

    Sent from my PRA-LX1 using Tapatalk
     
    jnc likes this.

Share This Page