If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

ÖSlJ, Mariefred, Sweden

Тема в разделе 'International Heritage Railways/Tramways', создана пользователем Dag Bonnedal, 23 фев 2018.

  1. Dag Bonnedal

    Dag Bonnedal New Member

    Дата регистрации:
    28 мар 2012
    Сообщения:
    184
    Симпатии:
    317
    Пол:
    Мужской
    Адрес:
    Stockholm, Sweden
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The latter is in use on one of the 891 mm preserved railways in Sweden, (Jädraås Tallås Järnväg)
    https://www.facebook.com/160160504179308/photos/a.858308544364497/1035050350023648/?type=3&theater

    Called "slither points" in Swedish.
     
    Jamessquared нравится это.
  2. Monkey Magic

    Monkey Magic Part of the furniture

    Дата регистрации:
    6 янв 2018
    Сообщения:
    3.498
    Симпатии:
    6.845
    Адрес:
    Here, there, everywhere
    Heritage Railway Volunteer:
    No I do not currently volunteer
    There used to be a three way stub point at Portmadoc, which if I didn't know it had been there I would have thought was a bad photoshop. I think it was taken out in the 1960s. I don't know of any diamond crossings.

    [​IMG]
    http://www.photobydjnorton.com/FfestiniogRailway.html
     
  3. Ploughman

    Ploughman Part of the furniture

    Дата регистрации:
    1 апр 2008
    Сообщения:
    5.969
    Симпатии:
    2.761
    Род занятий:
    Ex a lot of things.
    Адрес:
    Near where the 3 Ridings meet
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    We have a Double on the NYMR in use by every movement North of Grosmont P2 and 3.
    Another in Pickering yard leading to the C+W.
    Another in the yard at Levisham.
    Also a slip at Goathland under Cowath Bridge.
     
  4. Dag Bonnedal

    Dag Bonnedal New Member

    Дата регистрации:
    28 мар 2012
    Сообщения:
    184
    Симпатии:
    317
    Пол:
    Мужской
    Адрес:
    Stockholm, Sweden
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Very interesting per see, but my lengthy description of why we use double slip was just to describe why this was the one and only solution we could find.
    We could not find a viable solution using other equipment.
    Please keep discussions on odd points and track solutions in a separate thread (went into the trap myself, sorry).

    Comments or questions on our work and railway are always welcome.
     
    Last edited: 17 апр 2020
  5. Dunfanaghy Road

    Dunfanaghy Road Well-Known Member

    Дата регистрации:
    9 окт 2019
    Сообщения:
    1.401
    Симпатии:
    1.772
    Пол:
    Мужской
    Род занятий:
    Retired
    Адрес:
    Alton, Hants
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I would call the 'Baeseler' an outside slip. I am sure that I once saw that as the definition of 'Baeseler'.
    The Ropley point was my idea for using what we had (we couldn't afford to get a double slip made, and second-hand ones are never worth the trouble). It was inspired by a set in Woking Down Top Yard, which gets hammered by every stone train to Day's yard. It means a double move (or did when I was last involved), but given the (lack of) drainage a double slip would be a catastrophe.
    I had never heard the term 'Barry Slip' before. Every day a school day.:D
    Pat
     
  6. Dag Bonnedal

    Dag Bonnedal New Member

    Дата регистрации:
    28 мар 2012
    Сообщения:
    184
    Симпатии:
    317
    Пол:
    Мужской
    Адрес:
    Stockholm, Sweden
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    2020-04-26 ODh 7.jpg

    Work continues, slowly getting there...
    Photo by project manager Ola Dahlström,
    wish I could be there.
     
    Last edited: 28 апр 2020
    Paul42, Bluenosejohn, 5944 и ещё 1-му нравится это.
  7. Dag Bonnedal

    Dag Bonnedal New Member

    Дата регистрации:
    28 мар 2012
    Сообщения:
    184
    Симпатии:
    317
    Пол:
    Мужской
    Адрес:
    Stockholm, Sweden
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    IMG_8428s.jpg

    This year it has been a summer as no other, for all of us, I guess.
    We had to postpone the start of our traffic season until early July. But then it worked as we had hoped for.
    People had to stay locally during their vacation and needed things to do with their kids. With suitable adaptations like: limited seating, no cash, no ticket collection etc. we ran as much trains we could during July and early August.
    Only our two big engines (Nos. 5 and 9) could handle the trains. Both fresh out of overhaul last year and this. Maximum length 8 or 9 carriage trains when we had one engine in service and all available 13 carriages when both engines were in service.
    Most trains sold out (with the limited seating).
    Thus a good but very short season.
    As no galas or events are allowed, we ran only "enhanced" traffic the last day of the ordinary season. Five steam engines, two diesels and our 1916 battery electric. See photos from the day:
    https://museijarnvagenimariefred.se/
    Tomorrow (Saturday) we will run Halloween trains in the dark. Did this last year and it seems to be a great interest this year as well.
    After discussions with the local business association, we will not have any Santa specials this year
     
    240P15, Monkey Magic, Bluenosejohn и 4 другим нравится это.
  8. Dag Bonnedal

    Dag Bonnedal New Member

    Дата регистрации:
    28 мар 2012
    Сообщения:
    184
    Симпатии:
    317
    Пол:
    Мужской
    Адрес:
    Stockholm, Sweden
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    This year we had a similar summer to last year; short season, but lot of traffic with many visitors when we were able to run.
    We were able to run the youth camp as usual in July, and in August our younger members organized their own day. A full traffic day with two steam trains in operation, and all participating staff (total of 17) were between 13 and 29 years old. The youngest worked as ticket collectors. Picture below of most of the staff, missing are the staff manning Läggesta station and some of the Café staff.
    2021-08-15 Ungdomsdagen personal, Dag B.jpg

    Saturday 25 September we ran the traditional end of season gala. The two days before had miserable weather but Saturday was as good as anything could be. Five steam locos and one diesel in service all day from 10 am until 10 pm. Long 17 hour day for us on the footplates, but worth every minute of it. See the video filmed and edited by an 11 year old visitor. Well made. I am the driver of Mallet No. 5. Unfortunately No. 2 Virå does not appear in the video, but you can't be everywhere at the same time.


    As previous years we will also run Halloween trains for two days at the end of October. This has been very successful and popular with local families.
     
    Last edited: 29 сен 2021
    garth manor, Martin Perry и 5944 нравится это.

Поделиться этой страницей