If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Alycidon

本贴由 Victor2017-06-15 发布. 版块名称: Diesel & Electric Traction

  1. CH 19

    CH 19 Well-Known Member Friend

    注册日期:
    2013-12-30
    帖子:
    1,271
    支持:
    648
    性别:
    职业:
    Hospital Porter
    所在地:
    W14
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Ah righty oh, thanks Gary.
     
  2. guycarr360

    guycarr360 Part of the furniture

    注册日期:
    2005-10-04
    帖子:
    4,838
    支持:
    3,165
    性别:
    所在地:
    Chester le Street County Durham
    You have missed out, or not seen the piece about a collaboration with Siemens.

    Wonder what that could be all about????
     
  3. 5944

    5944 Resident of Nat Pres

    注册日期:
    2006-01-14
    帖子:
    8,871
    支持:
    9,290
    性别:
    职业:
    Train Maintainer for GTR at Hornsey
    所在地:
    Letchworth
    Heritage Railway Volunteer:
    No I do not currently volunteer
  4. guycarr360

    guycarr360 Part of the furniture

    注册日期:
    2005-10-04
    帖子:
    4,838
    支持:
    3,165
    性别:
    所在地:
    Chester le Street County Durham
  5. guycarr360

    guycarr360 Part of the furniture

    注册日期:
    2005-10-04
    帖子:
    4,838
    支持:
    3,165
    性别:
    所在地:
    Chester le Street County Durham
    Now the loco is back at Barrow Hill it will be sheeted over and remain outside to facilitate a thorough clean and to allow it to dry out. This may take up to 4 weeks.


    Once the loco is inside, a thorough assessment and testing of the traction cabling, switchgear and protection equipment will be carried out. It’s not been possible so far, due to the need to preserve evidence and working through the Insurance Company’s forensic engineering process. A worst case scenario is that all of the traction cables will need replacing. Estimated worst case cost £25,000.


    In order to obtain insurance cover in the future and to limit the possibility of such catastrophic damage in the future, new protection equipment will need designing and fitting to our locos. This will be filters to absorb high voltage surges that occur during fault conditions and events like wheel slip at high speed or traction current overload. The design work and approval of the changes will require professional support. Estimated cost £30,000.


    Asbestos has been found in two traction motor armatures and two field coil frames that need to be rewound as part of repairing the damage sustained when D9009 failed near Prestonpans on 03/03/2019. We may not be able to recover the cost of removing it through our insurance. Cost £15,000.


    A briefing will be provided at the Society AGM about what is likely to have happened on 03/03/2019, lessons to learn and improvements we can make for the future. To donate, please CLICK HERE.
     
    已获得60017的支持.
  6. 60017

    60017 Resident of Nat Pres Friend

    注册日期:
    2008-07-06
    帖子:
    9,107
    支持:
    8,076
    性别:
    职业:
    Retired from corporate slavery :o)
    所在地:
    Fylde Coast
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Thank you for the insight.
     
  7. Victor

    Victor Nat Pres stalwart Friend

    注册日期:
    2006-08-20
    帖子:
    14,533
    支持:
    9,200
    职业:
    Retired
    所在地:
    DEWSBURY West Yorkshire
    已获得Richard Roperguycarr360Davo的支持.
  8. Davo

    Davo Well-Known Member

    注册日期:
    2018-10-12
    帖子:
    1,540
    支持:
    650
    性别:
    所在地:
    W yorkshire 56f
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Great news to see work is going well on D9009 Alycidon
     
  9. MellishR

    MellishR Resident of Nat Pres Friend

    注册日期:
    2009-04-16
    帖子:
    8,915
    支持:
    5,860
    Has the "power surge" been explained?
     
  10. guycarr360

    guycarr360 Part of the furniture

    注册日期:
    2005-10-04
    帖子:
    4,838
    支持:
    3,165
    性别:
    所在地:
    Chester le Street County Durham
    Think it is confidential between the insurance company and The DPS.

    The list of possibilities was :-

    1. A Lightning Strike
    2. A Dropper cable from the Catenary grounding on the loco.

    A explanation was promised, however, the loco should also have had earth bonding straps between the body and bogie, and evidently these were missing.

    This all came out of a conversation on Martin Walker's excellent 55022 page on Facebook, so don't shoot the messenger.
     
  11. guycarr360

    guycarr360 Part of the furniture

    注册日期:
    2005-10-04
    帖子:
    4,838
    支持:
    3,165
    性别:
    所在地:
    Chester le Street County Durham
    已获得26power的支持.
  12. Victor

    Victor Nat Pres stalwart Friend

    注册日期:
    2006-08-20
    帖子:
    14,533
    支持:
    9,200
    职业:
    Retired
    所在地:
    DEWSBURY West Yorkshire
    Thank you, I've seen it. Seems as though a lot of new/expensive wiring is needed. My money is on 'touched the overhead power line' as the cause of the incident.
     
  13. guycarr360

    guycarr360 Part of the furniture

    注册日期:
    2005-10-04
    帖子:
    4,838
    支持:
    3,165
    性别:
    所在地:
    Chester le Street County Durham
  14. guycarr360

    guycarr360 Part of the furniture

    注册日期:
    2005-10-04
    帖子:
    4,838
    支持:
    3,165
    性别:
    所在地:
    Chester le Street County Durham
  15. Victor

    Victor Nat Pres stalwart Friend

    注册日期:
    2006-08-20
    帖子:
    14,533
    支持:
    9,200
    职业:
    Retired
    所在地:
    DEWSBURY West Yorkshire
    They've kept repair progress quiet, (but it's very welcome news). Progress reports for 22 RSG have been as rare as hens teeth since Martin Walker agreed a deal with the Crewe team.
    But I'll tell yo something.............if things are improving on the virus front come spring time we'll spend the kids inheritance.............First Class, table for 2.:Happy:
     
    已获得LMarsh1987, Will RL, weltrol另外4人的支持.
  16. LMarsh1987

    LMarsh1987 Part of the furniture Friend

    注册日期:
    2013-06-19
    帖子:
    2,973
    支持:
    3,918
    性别:
    职业:
    TBC
    所在地:
    Birmingham & Arley
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Surely it has to be No7 on the steam section !
     
  17. Matt37401

    Matt37401 Nat Pres stalwart

    注册日期:
    2014-06-08
    帖子:
    15,551
    支持:
    11,955
    所在地:
    Wnxx
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Would a Certain A2 be ready by then?
     
  18. 5944

    5944 Resident of Nat Pres

    注册日期:
    2006-01-14
    帖子:
    8,871
    支持:
    9,290
    性别:
    职业:
    Train Maintainer for GTR at Hornsey
    所在地:
    Letchworth
    Heritage Railway Volunteer:
    No I do not currently volunteer
    60007 is unlikely to be ready by then. Don't know about 60532.
     
  19. Will RL

    Will RL Member

    注册日期:
    2017-06-12
    帖子:
    767
    支持:
    1,166
    所在地:
    Midlands
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Not for the mainline...
     
  20. LMarsh1987

    LMarsh1987 Part of the furniture Friend

    注册日期:
    2013-06-19
    帖子:
    2,973
    支持:
    3,918
    性别:
    职业:
    TBC
    所在地:
    Birmingham & Arley
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I'm tempted to book a first class compartment for this, as Dining looks way overpriced for two people and add in your hotel costs and extras you wouldn't be too far off a two grand weekend in Edinburgh !!
     
    已获得Will RL的支持.

分享此页面