If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

West Somerset Railway General Discussion

Dieses Thema im Forum 'Heritage Railways & Centres in the UK' wurde von gwr4090 gestartet, 15 November 2007.

  1. Andy Norman

    Andy Norman Member

    Registriert seit:
    14 Mai 2015
    Beiträge:
    739
    Zustimmungen:
    4.422
    Geschlecht:
    männlich
    Ort:
    West Somerset
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Rather than a theory of what it should do here's some real feedback. I've fired 5542 over the WSR (so slightly more water) with 7 on which is its line limit. I was having a good day and had a good trainee with me, we were never short of steam, didn't blow off (much!!) and had more than enough water at the other end both ways. The engine was on its limit and water may have been an issue if we were delayed for a long while along the line so I wouldn't say it would be good for all firemen everyday of the week, a Manor gives you plenty of power & water to cope with delays and a bad firing day and can take those last minute extra coaches the Ops team like to put on, but 4561 would be usable most of the time.

    But I would say 4561 with 5 on would give you plenty of leeway for water and a bad day.
     
    Last edited: 10 Juli 2020
    Dennis John Brooks und RailWest gefällt dies.
  2. Snifter

    Snifter Well-Known Member

    Registriert seit:
    26 August 2014
    Beiträge:
    1.693
    Zustimmungen:
    4.299
    Geschlecht:
    männlich
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Remind me to kick you in the shins next time we meet.

    ;)
     
    nine elms fan und flying scotsman123 gefällt dies.
  3. Matt37401

    Matt37401 Nat Pres stalwart

    Registriert seit:
    8 Juni 2014
    Beiträge:
    15.552
    Zustimmungen:
    11.961
    Ort:
    Wnxx
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Would they be the 7-8 coach trains that have graced the line in recent years that have been hauled by a group's loco that 'has a Peckett that now lives in Cornwall?'
    Just asking.
     
    ghost und flying scotsman123 gefällt dies.
  4. Paulthehitch

    Paulthehitch Well-Known Member

    Registriert seit:
    13 Februar 2020
    Beiträge:
    1.090
    Zustimmungen:
    1.093
    Geschlecht:
    männlich
    Ort:
    Hayling Island
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    A bit puzzled here. I understood that a major part of the WSR problems came from passenger numbers falling off somewhat yet there is an implication that the trains have got longer.
     
    Roland Bushell und Greenway gefällt dies.
  5. martin1656

    martin1656 Nat Pres stalwart Friend

    Registriert seit:
    8 Dezember 2014
    Beiträge:
    19.427
    Zustimmungen:
    12.626
    Geschlecht:
    männlich
    Ort:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    its the only loco currently on the line that can manage those loads , hence why it makes no sence, unless a certain loco owning chairman is hoping to hire his Hall to the railway once 88 has run out of ticket its not a wise move to allow someone who owns what could after the 7f goes, to be the majority of the lines motive power, assuming the line gets uprated and his pannier and hall become WSR based, unlimited power because the suspicion will always be that they are feathering their own nest at the railways expense.
     
    53807, granmaree und Dennis John Brooks gefällt dies.
  6. malcolm imps

    malcolm imps New Member

    Registriert seit:
    31 Januar 2016
    Beiträge:
    175
    Zustimmungen:
    504
    Geschlecht:
    männlich
    Beruf:
    Hillman Imp Specialist
    Ort:
    norton fitzwarren
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Who mentioned missing fishplates ?? & 5 weeks work ?.....wrong facts again ...... ...the relay has had welded pot joints done there......4 weeks work in general to do soon maybe ?....by....
     
    Maunsell907 und Steve Edge gefällt dies.
  7. malcolm imps

    malcolm imps New Member

    Registriert seit:
    31 Januar 2016
    Beiträge:
    175
    Zustimmungen:
    504
    Geschlecht:
    männlich
    Beruf:
    Hillman Imp Specialist
    Ort:
    norton fitzwarren
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    dont need an appeal for us to be doing this if it was needed ????
     
    Last edited: 10 Juli 2020
  8. Sidmouth

    Sidmouth Resident of Nat Pres Staff Member Moderator

    Registriert seit:
    12 September 2005
    Beiträge:
    10.176
    Zustimmungen:
    9.840
    Geschlecht:
    männlich
    Ort:
    Alderan !
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    upload_2020-7-10_20-5-23.png
     
    Forestpines gefällt dies.
  9. aldfort

    aldfort Well-Known Member

    Registriert seit:
    4 März 2009
    Beiträge:
    1.933
    Zustimmungen:
    4.252
    Geschlecht:
    männlich
    Beruf:
    Retired
    Ort:
    Cardiff
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I've fired 5542 as well. It's a bit special.
     
    Premier.Prairie gefällt dies.
  10. Bayard

    Bayard Well-Known Member

    Registriert seit:
    26 April 2015
    Beiträge:
    1.842
    Zustimmungen:
    3.904
    Geschlecht:
    männlich
    Heritage Railway Volunteer:
    No I do not currently volunteer
    yet I have noticed that the British, especially those involved in railways, are seldom able to resist the siren call of secrecy.
     
    nanstallon und The Dainton Banker gefällt dies.
  11. Bayard

    Bayard Well-Known Member

    Registriert seit:
    26 April 2015
    Beiträge:
    1.842
    Zustimmungen:
    3.904
    Geschlecht:
    männlich
    Heritage Railway Volunteer:
    No I do not currently volunteer
  12. jma1009

    jma1009 Well-Known Member

    Registriert seit:
    16 März 2013
    Beiträge:
    1.392
    Zustimmungen:
    1.639
    Geschlecht:
    männlich
    Ort:
    ynysddu south wales
    Hello 'malcolm imps',

    Can you perhaps clear up something a number of us have been puzzling over, as follows:-

    17th March 2020 the WSR PLC board announce the railway will not re-open on Saturday 21st March as planned due to the corona virus 'lockdown'; that is 3 working days left on the track maintenance - no more, no less.

    So far as I recollect, on 21st March the whole of the WSR was to be re-opened for passenger services (happy to be proved wrong on this).

    Therefore, unless I am quite wrong, there cannot have been '4 weeks or more' work required on the track to get it fit for the planned re-opening on 21st March. I perfectly accept that the WSR PLC board planned further work on the track this winter, but that is irrelevant for the 21st March re-opening.

    Are you sure you have your facts as quoted by you correct?

    Cheers,

    Julian
     
  13. D1039

    D1039 Guest

    See upthread

    Happy to be corrected. I wouldn't count this as the loco effectively belonging to the bank.

    Patrick
     
  14. malcolm imps

    malcolm imps New Member

    Registriert seit:
    31 Januar 2016
    Beiträge:
    175
    Zustimmungen:
    504
    Geschlecht:
    männlich
    Beruf:
    Hillman Imp Specialist
    Ort:
    norton fitzwarren
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    this was correct at the time in April & still is now, as I was informed by my volunteer gang........& am out on PW again tomorrow.....
     
  15. jma1009

    jma1009 Well-Known Member

    Registriert seit:
    16 März 2013
    Beiträge:
    1.392
    Zustimmungen:
    1.639
    Geschlecht:
    männlich
    Ort:
    ynysddu south wales
    Yes, but as of 17th March this year, the whole railway was going to re-open on Saturday 21st March? You stated in an earlier post a date of 23rd March as critical - now you state "in April". Can we really rely on the accuracy of your posts on here at all? Given that the WSR PLC board have never ever stated outstanding trackwork maintenance as an issue at all to any sort of re-opening, whether 17th or 21st March or subsequently, can you assist us with some further facts please?

    Like - what is not fit to run passenger trains over, and where precisely, and the work required please?
     
    alastair gefällt dies.
  16. flying scotsman123

    flying scotsman123 Resident of Nat Pres

    Registriert seit:
    9 September 2013
    Beiträge:
    10.707
    Zustimmungen:
    18.815
    Geschlecht:
    männlich
    Ort:
    Cheltenham
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    [​IMG]

    But seriously, what @malcolm imps has said does appear to be inconsistent and what the WSR intended to do up until lockdown was imposed in March, i.e. a full line service. Good to hear some WSR P'way volunteers are going to be able to get back to it tomorrow though.
     
    malcolm imps und D1039 gefällt dies.
  17. jma1009

    jma1009 Well-Known Member

    Registriert seit:
    16 März 2013
    Beiträge:
    1.392
    Zustimmungen:
    1.639
    Geschlecht:
    männlich
    Ort:
    ynysddu south wales
    Doing what exactly?

    'malcolm imps' stated there was '4 weeks or more' required on the track before trains can run again, yet the WSR PLC board reckoned back in mid March everything was ok for a 21st March re-opening over the whole line with just a few days to go.

    As others, including a Moderator (Martin - 'Sidmouth') have relied upon what 'malcolm imps' has stated on here in his posts it is something that IMHO needs to be resolved/clarified.

    Cheers,

    Julian
     
    Forestpines gefällt dies.
  18. flying scotsman123

    flying scotsman123 Resident of Nat Pres

    Registriert seit:
    9 September 2013
    Beiträge:
    10.707
    Zustimmungen:
    18.815
    Geschlecht:
    männlich
    Ort:
    Cheltenham
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I dunno!

    I agree. I just don't think we need the Spanish inquisition to agree all Malcolm is only an ordinary volunteer, not a WSR official.
     
    Forestpines, horace und malcolm imps gefällt dies.
  19. The Dainton Banker

    The Dainton Banker Well-Known Member

    Registriert seit:
    20 Juli 2014
    Beiträge:
    1.870
    Zustimmungen:
    3.397
    Geschlecht:
    männlich
    Ort:
    Over the hills and far away
    Heritage Railway Volunteer:
    No I do not currently volunteer
    But doesn't this illustrate part of the problem ? Malcolm and his PW gang are not being given essential information relating to their role, so cannot be quite sure of what is happening and why. Result : speculation, which reflects poorly on the line and its management.
    Easily solved by keeping everyone involved "in the loop". :rolleyes:
     
    jnc, Forestpines, malcolm imps und 3 anderen gefällt dies.
  20. But what management? They've all left, as have most of the infrastructure team. Is there a director with infrastructure responsibility?
     

Die Seite empfehlen