If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

West Somerset Railway General Discussion

الموضوع في 'Heritage Railways & Centres in the UK' بواسطة gwr4090, بتاريخ ‏15 نوفمبر 2007.

  1. Bayard

    Bayard Well-Known Member

    إنضم إلينا في:
    ‏26 إبريل 2015
    المشاركات:
    1,841
    عدد المعجبين:
    3,904
    الجنس:
    ذكر
    Heritage Railway Volunteer:
    No I do not currently volunteer
    In what way? Either SCC are responsible as landowner, or they are responsible as the local authority.
     
  2. martin1656

    martin1656 Nat Pres stalwart Friend

    إنضم إلينا في:
    ‏8 ديسمبر 2014
    المشاركات:
    19,265
    عدد المعجبين:
    12,517
    الجنس:
    ذكر
    مكان الإقامة:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    To be honest, there are many issues that has lead the WSR to the place it now finds it's self in, the questions are many, structure, supporting groups, and personalities, just to deal with the main ones, but hopefully one day it will find a way out of the mess. when it does, serious thought has to be given to what distance do they operate, for example clearly there are issues with the permanent way and on controlling costs, it may be worth considering abandoning the Taunton end of the line mothballing it, to regular traffic and only operating a shorter line until the finances allow an staged extension , as the track is repaired and maintaince made good, who ever runs the line, will have to make this decision, if the railway can not afford to run over the full length, then run it over what it can afford, ,
     
    Triumph 2500S و Paulthehitch معجبون بهذا.
  3. Big Al

    Big Al Nat Pres stalwart Staff Member Moderator

    إنضم إلينا في:
    ‏30 ماي 2009
    المشاركات:
    22,591
    عدد المعجبين:
    22,724
    مكان الإقامة:
    1016
    Heritage Railway Volunteer:
    No I do not currently volunteer
    At present, all that seems to be happening are relatively minor things - cosmetic almost - in advance of basically an event that is closer to a static display than anything else. That's good, nevertheless, but one has to assume that this is all that is possible at this time.

    So as someone who would like to revisit an operating railway, what interests me most are the steps being taken now to reopen the railway for trains and over which part of the WSR if the whole line would be stretching it. I'm not thinking of wishful intentions such the Christmas period comment, but the visible action. Maybe a lot is taking place behind the scenes that it would be reassuring to read about. So how will things change from now so it is possible to reopen 'down the line'? As I've not read anything that gives me clues about that you have to conclude that the situation remains very difficult and financially unsustainable.

    That's immensely sad, if it's true. And in that situation logic suggests that all the Railway can do at present is what it is actually doing and good luck to them for that. But as none of this involves the line reopening, ergo, the line is unlikely to reopen at all, or in the near future.
     
  4. malcolm imps

    malcolm imps New Member

    إنضم إلينا في:
    ‏31 يناير 2016
    المشاركات:
    175
    عدد المعجبين:
    504
    الجنس:
    ذكر
    الوظيفة:
    Hillman Imp Specialist
    مكان الإقامة:
    norton fitzwarren
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Simples, ....ask the company infrastructure board .....;);)
     
    أعجب بهذه المشاركة Premier.Prairie
  5. nanstallon

    nanstallon Part of the furniture

    إنضم إلينا في:
    ‏8 سبتمبر 2005
    المشاركات:
    4,358
    عدد المعجبين:
    2,418
    الجنس:
    ذكر
    الوظيفة:
    Retired
    مكان الإقامة:
    Westcountry
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    If you mothball the Taunton/ BL end, goodbye to through excursions and may lose the income from servicing main line steam.
     
    Triumph 2500S و malcolm imps معجبون بهذا.
  6. Greenway

    Greenway Part of the furniture

    إنضم إلينا في:
    ‏16 مارس 2008
    المشاركات:
    4,019
    عدد المعجبين:
    3,804
    الجنس:
    ذكر
    مكان الإقامة:
    South Hams
    Heritage Railway Volunteer:
    No I do not currently volunteer
    The WSR, in the past, hoped to increase excursion/charter traffic as it was seen as lucrative. I doubt they would want to mothball the main line connections end despite the high maintenance costs entailed.
     
    Triumph 2500S و malcolm imps معجبون بهذا.
  7. 35B

    35B Nat Pres stalwart

    إنضم إلينا في:
    ‏18 جوان 2011
    المشاركات:
    28,735
    عدد المعجبين:
    28,668
    الجنس:
    ذكر
    مكان الإقامة:
    Grantham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I suspect that may be the tail that wags the dog financially speaking. However, it may also affect how people access the railway and the 20 minute drive up the A358 deter them from joining further up the line.
     
    أعجب بهذه المشاركة Triumph 2500S
  8. MellishR

    MellishR Resident of Nat Pres Friend

    إنضم إلينا في:
    ‏16 إبريل 2009
    المشاركات:
    8,912
    عدد المعجبين:
    5,849
    There have been many voices shouting the warning for some time now, but sadly many deaf ears.
     
    أعجب بهذه المشاركة jnc
  9. simon

    simon Resident of Nat Pres

    إنضم إلينا في:
    ‏26 جوان 2006
    المشاركات:
    11,872
    عدد المعجبين:
    5,563
    Never understood why people think this was something Rumsfeld dreamt up. We were taught it on my MBA course many years before and it wasn't new then. It's always been the case that what you don't know you don't know may prove fatal.
     
  10. Triumph 2500S

    Triumph 2500S Well-Known Member

    إنضم إلينا في:
    ‏26 جويلية 2014
    المشاركات:
    1,066
    عدد المعجبين:
    933
    الجنس:
    ذكر
    الوظيفة:
    Retired
    مكان الإقامة:
    Swindon
    Heritage Railway Volunteer:
    No I do not currently volunteer
    The question would remain - which end - It is the Minehead end that requires the work, does it not?
     
  11. Triumph 2500S

    Triumph 2500S Well-Known Member

    إنضم إلينا في:
    ‏26 جويلية 2014
    المشاركات:
    1,066
    عدد المعجبين:
    933
    الجنس:
    ذكر
    الوظيفة:
    Retired
    مكان الإقامة:
    Swindon
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I don't believe we have made sufficient use of our Main Line connection and that is down to selling the Railway to make it attractive for trains to come.

    I must say I am very surprised that with the turntable and facilities available that there has not been more activity - so why not?

    There could be a mini Torbay Express from Bristol for example or a Minehead Express from Birmingham - an untapped market!
     
  12. Triumph 2500S

    Triumph 2500S Well-Known Member

    إنضم إلينا في:
    ‏26 جويلية 2014
    المشاركات:
    1,066
    عدد المعجبين:
    933
    الجنس:
    ذكر
    الوظيفة:
    Retired
    مكان الإقامة:
    Swindon
    Heritage Railway Volunteer:
    No I do not currently volunteer
    However much Minehead is regarded as the jewel in the crown it is a slog from the M5 and therefore I would favour a staged reopening from the Lydeard end even if it only went to Crowcombe initially a reversal of what was achieved from 1976
     
    free2grice و flying scotsman123 معجبون بهذا.
  13. Greenway

    Greenway Part of the furniture

    إنضم إلينا في:
    ‏16 مارس 2008
    المشاركات:
    4,019
    عدد المعجبين:
    3,804
    الجنس:
    ذكر
    مكان الإقامة:
    South Hams
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I would not be surprised in the Birmingham trips have been discussed already given the Birmingham connections with the PLC
     
    أعجب بهذه المشاركة Triumph 2500S
  14. Jamessquared

    Jamessquared Nat Pres stalwart

    إنضم إلينا في:
    ‏8 مارس 2008
    المشاركات:
    27,800
    عدد المعجبين:
    64,480
    مكان الإقامة:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Surely it's a bit of an illusion that there is lots of money to be made from incoming charters.

    A typical train has maybe 400 passengers at most. Given the normal sort of ticket price for mainline charters (starting at ca. £100) that means at most the gross income from a train might be of the order of £50 - £60k, and that has to pay everything - all the mainline costs, loco costs, Network Rail fees, the business overheads of the charter operator and so on. So the amount available to a railway hosting an inbound charter is only going to be a small fraction of that. Even if you could get 20 trains in a season (and historically the WSR has actually been very successful at attracting incoming trains), the total revenue generated is going to amount to no more than a five figure sum over a whole season. Which is good to have, but it is peanuts relative to the £3m+ that the railway needs to generate each year. (And without a large catering outlet at Minehead and the town so close, most of the arriving passengers are likely to head straight into town, minimising any secondary spend on the railway).

    It's icing on the cake - which is tasty, but certainly not a substitute for the cake. Better to carry 400 passengers on your own train paying potentially up to £28 each than 400 of someone else's paying a fraction of that.

    Tom
     
    Paulthehitch, Paul42, Triumph 2500S و 7 آخرون معجبون بهذا.
  15. martin1656

    martin1656 Nat Pres stalwart Friend

    إنضم إلينا في:
    ‏8 ديسمبر 2014
    المشاركات:
    19,265
    عدد المعجبين:
    12,517
    الجنس:
    ذكر
    مكان الإقامة:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    In what ever way the WSR re opens, assuming it does, the reality of the situation will mean some very hard decisions having to be taken, either running over a shorter distance, whilst the track that needs attention is brought up to standard , either that or once again putting it of for another day, until you can't run anything.
    If DMU's are kinder to track that needs attention, then perhaps split the operation to one of a DMU shuttle BL-WT, changing over to steam.at WL meaning less steam mileage,
    As regards mainline use, mainline engines could still turn at NF , and be serviced either there, or BL.
     
    أعجب بهذه المشاركة Triumph 2500S
  16. johnofwessex

    johnofwessex Resident of Nat Pres

    إنضم إلينا في:
    ‏6 إبريل 2015
    المشاركات:
    9,748
    عدد المعجبين:
    7,859
    الجنس:
    ذكر
    الوظيفة:
    Thorn in my managers side
    مكان الإقامة:
    72
    Heritage Railway Volunteer:
    No I do not currently volunteer
    It may not be a money maker for the WSR but it is a moneymaker for Minehead and I think that that can be no bad thing
     
    Roland Bushell و Triumph 2500S معجبون بهذا.
  17. Dan Taylor

    Dan Taylor New Member Account Suspended

    إنضم إلينا في:
    ‏10 ديسمبر 2019
    المشاركات:
    159
    عدد المعجبين:
    142
    الوظيفة:
    Fireman
    مكان الإقامة:
    Titfield
    Heritage Railway Volunteer:
    No I do not currently volunteer



    Even if it benefits the local area,

    Said monies, wouldn't go directly into the railway.

    So they don't seem interested, in helping the local area outside of the boundary fence so to speak.
     
  18. Matt37401

    Matt37401 Nat Pres stalwart

    إنضم إلينا في:
    ‏8 جوان 2014
    المشاركات:
    15,551
    عدد المعجبين:
    11,955
    مكان الإقامة:
    Wnxx
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I think you only have to look at say the SVR, it uses its mainline connection for the odd charter but Bridgnorth and Bewdley aren't exactly regular destinations, it's things like Tampers coming in for training, Network Rail and LSL using it for loco trials/running in, diesel groups taking advantage of using the facilities at Kiddy TRSMD, basically what I'd call commercial work, that day to day is possibly more valuable than the occasional charter.
    How often is the connection used for the ballest work at Norton Fitzwarren?
     
    free2grice و jnc معجبون بهذا.
  19. Fish Plate

    Fish Plate New Member

    إنضم إلينا في:
    ‏31 اكتوبر 2015
    المشاركات:
    147
    عدد المعجبين:
    832
    مكان الإقامة:
    The Northern Hemisphere
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Astoishing. How can you give your support to a Chairman who felt it appropriate to tell the Chairman of the WSRA to Foxtrot Oscar (I have never seen any denial of this story, so assume that it is accurate)? That is totally unacceptable behaviour not matter how you look at it and it should not have been @Paul Whitehouse who resigned from his post as a result. I cannot imagine that this would have been tolerated on any other railway and have no idea why it is tolerated on the WSR.
     
    ghost, MellishR, Blue Horizon و 5 آخرون معجبون بهذا.
  20. Steve

    Steve Resident of Nat Pres Friend

    إنضم إلينا في:
    ‏7 اكتوبر 2006
    المشاركات:
    12,732
    عدد المعجبين:
    11,848
    الوظيفة:
    Gentleman of leisure, nowadays
    مكان الإقامة:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    How often do tampers go anywhere by rail?
     

مشاركة هذه الصفحة