If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

LE Movements, ECS and Test Runs 2020

Тема в разделе 'What's Going On', создана пользователем mike1522, 24 дек 2019.

  1. martin1656

    martin1656 Nat Pres stalwart Friend

    Дата регистрации:
    8 дек 2014
    Сообщения:
    19.268
    Симпатии:
    12.518
    Пол:
    Мужской
    Адрес:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    if the onboard stewardess were clones of 7 of 9, then, I would not put up any resistance at all, :)
     
    gwalkeriow, Haighie и green five нравится это.
  2. Ploughman

    Ploughman Part of the furniture

    Дата регистрации:
    1 апр 2008
    Сообщения:
    5.969
    Симпатии:
    2.761
    Род занятий:
    Ex a lot of things.
    Адрес:
    Near where the 3 Ridings meet
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    From a PW point of view, if the BORG controlled the tracks and got rid of the trains then we could get on and renew everything.
    Even less faults and delays.:):)
     
  3. mrKnowwun

    mrKnowwun Part of the furniture

    Дата регистрации:
    22 окт 2011
    Сообщения:
    4.366
    Симпатии:
    2.823
    Род занятий:
    Retired
    Адрес:
    West Byfleet
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Seen the vids, thought they had done a good job TBH, it looks stunning and a little like the pullman and I'm delighted that 43's can live on doing stuff like this. It needs buffers tho.
     
    green five нравится это.
  4. DismalChips

    DismalChips Member

    Дата регистрации:
    11 апр 2016
    Сообщения:
    682
    Симпатии:
    715
    Адрес:
    9A
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Just said precisely this on the other thread. The buffers are the missing element.
     
  5. free2grice

    free2grice Part of the furniture Friend

    Дата регистрации:
    19 сен 2005
    Сообщения:
    5.626
    Симпатии:
    3.616
    Пол:
    Мужской
    Род занятий:
    Retired Rolls-Royce engineer
    Адрес:
    Bath Green Park / Mangotsfield
    Heritage Railway Volunteer:
    No I do not currently volunteer
    As is shown here.
    https://upload.wikimedia.org/wikipedia/commons/3/32/43468_at_London_Kings_Cross.jpg

    ''In 1987, as electrification of the East Coast Main Line was under way, British Rail realised that the new Mark 4 carriages for the Class 89 and Class 91 locomotives were not going to be finished in time for the introduction of electric services on the East Coast Main Line so, in late 1987, a total of eight Eastern Region power cars (Numbers 43013/014/065/067/068/080/084/123) conversions (on 43014/123) were carried out at the Derby Engineering Development Unit, whilst the other six (43013/065/067/068/080/084) were converted by the diesel repair shop at Stratford to have the lower valancing removed and buffers fitted.
    After being fitted with buffers, these power cars began work as surrogate DVTs to work with the Class 91s and 89. The locomotives, working with conventional Mk3 stock, worked on the line between 1987 and 1991, when the last Class 91 locomotives entered service. As well as buffers being fitted to these powercars, special remote control equipment was also added to the locomotives so they could be controlled by the locomotive at the front''. <BJ>
     
  6. MellishR

    MellishR Resident of Nat Pres Friend

    Дата регистрации:
    16 апр 2009
    Сообщения:
    8.913
    Симпатии:
    5.851
    Why did an HST power car running as a DVT need buffers while one running as part of an HST set did not? Isn't the need to couple to another loco in abnormal circumstances equally likely or unlikely in both cases?

    Anyway I agree that the ersatz Blue Pullman looks good. I look forward to a ride when it's legal and I can feel safe.
     
  7. John2

    John2 Member

    Дата регистрации:
    3 сен 2007
    Сообщения:
    225
    Симпатии:
    68
    At the time, locomotives fitted with drop-head buckeye couplings could not be attached to ordinary HST power cars using the standard bar coupling carried on power cars so if the TDM wasn't working the loco couldn't be coupled to the London end of the train. Subsequently, a new bar coupling was developed that would fit buckeye fitted locos.
     
  8. MellishR

    MellishR Resident of Nat Pres Friend

    Дата регистрации:
    16 апр 2009
    Сообщения:
    8.913
    Симпатии:
    5.851
    Thank you. That makes sense. Presumably TDM failure, requiring a loco to be attached at the DVT end, was more likely than failure of the front power unit of an HST in combination with failure of the control link to the rear power car.
     
  9. Robin

    Robin Well-Known Member Friend

    Дата регистрации:
    7 май 2012
    Сообщения:
    1.472
    Симпатии:
    1.918
    Адрес:
    Stourbridge
    3ABescot нравится это.
  10. Deepgreen

    Deepgreen Well-Known Member Friend

    Дата регистрации:
    30 июл 2010
    Сообщения:
    2.099
    Симпатии:
    1.403
    Пол:
    Мужской
    Род занятий:
    Early retirement! (Ex-Business Improvement, LU).
    Адрес:
    Gomshall, Surrey
    Heritage Railway Volunteer:
    No I do not currently volunteer
  11. green five

    green five Resident of Nat Pres

    Дата регистрации:
    30 апр 2006
    Сообщения:
    6.789
    Симпатии:
    2.633
    Пол:
    Мужской
    Род занятий:
    Design Draughtsman
    Адрес:
    Hampshire
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Does anyone know if 45596 passed her fitness to run exam for tomorrow's move back to the KWVR? Hoping to see her tomorrow morning.

    Sent from my I3312 using Tapatalk
     
  12. Bodorganboy

    Bodorganboy Member

    Дата регистрации:
    17 мар 2017
    Сообщения:
    642
    Симпатии:
    1.576
    Пол:
    Мужской
    Адрес:
    Lancaster
    Heritage Railway Volunteer:
    No I do not currently volunteer
    If it runs will it get past Carnforth. The line has been closed all day due to flooding. At various places including Melling tunnel and Wennington
     
  13. green five

    green five Resident of Nat Pres

    Дата регистрации:
    30 апр 2006
    Сообщения:
    6.789
    Симпатии:
    2.633
    Пол:
    Мужской
    Род занятий:
    Design Draughtsman
    Адрес:
    Hampshire
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Is there an alternative route they can use or could they stable 45596 at Carnforth for a while until she can make it back to the KWVR?

    The Alton line also had a number of cancellations today as shown on RTT. Caused by the weather conditions I guess.

    Sent from my I3312 using Tapatalk
     
  14. jonathonag

    jonathonag Well-Known Member

    Дата регистрации:
    11 май 2006
    Сообщения:
    1.626
    Симпатии:
    3.142
    Род занятий:
    Railway Engineer
    Адрес:
    Cowdenbeath
    Take a right turn before Preston, wee skirmish round Blackburn and a reversal at Hellifield?
     
  15. 46223

    46223 Resident of Nat Pres Friend

    Дата регистрации:
    10 апр 2011
    Сообщения:
    6.693
    Симпатии:
    6.342
    Пол:
    Мужской
    Адрес:
    Lancs
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Or Copy Pit, Calder Valley, Normanton, and Leeds?
     
  16. green five

    green five Resident of Nat Pres

    Дата регистрации:
    30 апр 2006
    Сообщения:
    6.789
    Симпатии:
    2.633
    Пол:
    Мужской
    Род занятий:
    Design Draughtsman
    Адрес:
    Hampshire
    Heritage Railway Volunteer:
    No I do not currently volunteer
    It looks like the positioning move back to the KWVR is going ahead with 45596 as it has been activated on RTT:

    TRUST ID 875Z961A03

    Activated 02/11/2020 23:51







    Sent from my I3312 using Tapatalk
     
  17. osprey

    osprey Resident of Nat Pres

    Дата регистрации:
    3 окт 2007
    Сообщения:
    10.497
    Симпатии:
    2.857
    Род занятий:
    semi-retired, currently doing R&D for my patents
    Адрес:
    Halifax
    Yes please...
     
  18. Bodorganboy

    Bodorganboy Member

    Дата регистрации:
    17 мар 2017
    Сообщения:
    642
    Симпатии:
    1.576
    Пол:
    Мужской
    Адрес:
    Lancaster
    Heritage Railway Volunteer:
    No I do not currently volunteer
    The only problem with that option is that the engine would arrive tender first at Keighley, the same if it ran via Leeds
     
  19. Will RL

    Will RL Member

    Дата регистрации:
    12 июн 2017
    Сообщения:
    767
    Симпатии:
    1.166
    Адрес:
    Midlands
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    If only there was some way of turning Bahamas on arrival...
     
  20. Dan Hamblin

    Dan Hamblin Part of the furniture

    Дата регистрации:
    27 мар 2006
    Сообщения:
    2.549
    Симпатии:
    190
    Род занятий:
    Rolling Stock Engineer
    Адрес:
    Kent
    By good fortune I'm at Acton Works today looking at S Stock gearboxes, so hopefully can nip out and see it later.

    Don't forget the route might be constrained by in date gauging assessments. Hence going via Carnforth.

    Regards,

    Dan
     

Поделиться этой страницей