If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

BR Standard class 6 No. 72010 'Hengist' and Clan Discussion Thread

Discuție în 'Steam Traction' creată de Bulleid Pacific, 23 Noi 2009.

  1. 'Clan' Hengist

    'Clan' Hengist New Member

    Înscris:
    23 Oct 2014
    Mesaje:
    74
    Aprecieri primite:
    232
    Sex:
    Masculin
    Ocupație:
    Train Driver, Member Hengist Management Team
    Locație:
    East Midlands
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Initially, the front buffer beam will be bolted, but the intention is that it will be hot riveted at a later stage. There is a requirement to have some riveting done to the rear buffer beam as well so it makes more sense to have both areas done at the same time. (Ian will be able to tell you exactly what - I am no engineer!). That requires the frame extensions to be fitted, for which we have all the required components. The first stage is to get the frames back the right way up rather than upside down as at present. We were told yesterday that the intention is to do this tomorrow, Wednesday. As we, (myself, Ashley Shimwell and Mke Sedgley) will be there on Thursday to do more fettling and painting we will be able to confirm if this has been done.

    Steady progress - and I hope that we might be able to have a current photo of the frames the right way up to post tomorrow.
     
  2. northernsteam

    northernsteam Member

    Înscris:
    25 Mai 2010
    Mesaje:
    609
    Aprecieri primite:
    297
    Sex:
    Masculin
    Ocupație:
    Used to be in civil engineering, highway bridges.
    Locație:
    Tyne and Wear
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Thanks Bob. Latest 'News' shows a useful visit to show the buffer beam being worked on and explains the construction sequence.
    Have the frames been turned yet?
     
    'Clan' Hengist și 26power apreciază asta.
  3. 'Clan' Hengist

    'Clan' Hengist New Member

    Înscris:
    23 Oct 2014
    Mesaje:
    74
    Aprecieri primite:
    232
    Sex:
    Masculin
    Ocupație:
    Train Driver, Member Hengist Management Team
    Locație:
    East Midlands
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The frames are now the correct way up. They are now also facing down the shop towards the doors at the end. This is because we need to fit the frame extension plates and if that were done with the frames athwart the assembly shop they would be so long that all the walkways would be obstructed.

    Never stopped raining today in Sheffield. A wet miserable day, but worth the trip for the progress being made.

    Hopefully, we will have a further update to show you all next week.
     
    Johnme101, Haighie, jnc și alți 2 apreciază asta.
  4. ianh1

    ianh1 Member

    Înscris:
    10 Mai 2018
    Mesaje:
    230
    Aprecieri primite:
    719
    Sex:
    Masculin
    Locație:
    Cumbria
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Std tank pointed us in the right direction a few posts ago. Originally, the buffer beam was to be bolted. We quickly came to the realisation that it wouldn't look right so we changed the plans so that the buffer beam would be riveted with dome head rivtes. std tank pointed us to the drawings which sho that the front buffer beam components are hot riveted to the frames whereas the rest of the frames used cold rivets.

    With regards to the hind beam. This has 3 components fastened to it. In the centre is the intermediate rubbing block with curved faces. The engine/tender drawbar goes through the mouth of this. This will be bolted to the hindbeam. Either side of this are large rubbing plates. On the surface of these are manganese steel plates. The manganese steel plates are welded to the rubbing plates (from behind the rubbing plate) and the whole assembly is then to be flush riveted to the hind beam. The "dumb buffers" on the front of the tender press on the rubbing plates. As Bob says, the front buffer beam and the hind beam will be riveted at the same time. Here's a view from the 3D model

    HindBeam.jpg
     
    Johnme101, S.A.C. Martin, ragl și alți 4 apreciază asta.
  5. northernsteam

    northernsteam Member

    Înscris:
    25 Mai 2010
    Mesaje:
    609
    Aprecieri primite:
    297
    Sex:
    Masculin
    Ocupație:
    Used to be in civil engineering, highway bridges.
    Locație:
    Tyne and Wear
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Latest news on website shows the 2 new build frames side by side. Excellent!!
    Progress will soon be seen on the frame extensions on Hengist.
    Heres's hoping that our gang can still visit during lockdown but the reg's. seem to say no chance.
     
    jnc apreciază asta.
  6. 'Clan' Hengist

    'Clan' Hengist New Member

    Înscris:
    23 Oct 2014
    Mesaje:
    74
    Aprecieri primite:
    232
    Sex:
    Masculin
    Ocupație:
    Train Driver, Member Hengist Management Team
    Locație:
    East Midlands
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    We can continue to go to CTL. The MD has classified us as "Essential engineering staff, unable to work from home". We have letters to that effect, issued to us on Monday this week. Mine is in the glove box of my car, just on the off chance that I do get stopped and asked why I am driving up the M1 to Sheffield.

    So progress will continue, with our next working day scheduled for Thursday this week.
     
    Johnme101, ragl, jnc și alți 2 apreciază asta.
  7. 26power

    26power New Member

    Înscris:
    17 Aug 2020
    Mesaje:
    12
    Aprecieri primite:
    8
    Sex:
    Masculin
    Locație:
    Dumfries
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Link: https://www.theclanproject.org/Clan_News.php
     
    Richard Roper apreciază asta.
  8. Richard Roper

    Richard Roper Well-Known Member

    Înscris:
    22 Mai 2006
    Mesaje:
    1.310
    Aprecieri primite:
    1.359
    Sex:
    Masculin
    Ocupație:
    Librarian
    Locație:
    Just up the road from 56E Sowerby Bridge
    Heritage Railway Volunteer:
    No I do not currently volunteer
    26power apreciază asta.
  9. northernsteam

    northernsteam Member

    Înscris:
    25 Mai 2010
    Mesaje:
    609
    Aprecieri primite:
    297
    Sex:
    Masculin
    Ocupație:
    Used to be in civil engineering, highway bridges.
    Locație:
    Tyne and Wear
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Check that web link again folks. Continuing progress and maintenance on the cab after its time on display.
    It really is a factory production project despite the pandemic, thanks to a sympathetic and enthusiastic MD.
    Keep taking care and keeping safe folks!
     
    35B apreciază asta.
  10. 'Clan' Hengist

    'Clan' Hengist New Member

    Înscris:
    23 Oct 2014
    Mesaje:
    74
    Aprecieri primite:
    232
    Sex:
    Masculin
    Ocupație:
    Train Driver, Member Hengist Management Team
    Locație:
    East Midlands
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I ordered some touch-up paint for the cab a week or so ago. I had an email from the supplier yesterday telling me that it would be delivered on Wednesday. No intention of completely repainting the cab at this stage but preventative maintenance will stop deterioration as the paint is getting a bit scratched/shabby in places. A job for Ashley and I on Thursday. As we were not sure if we could get the cab inside for the winter Ashley repainted the cab roof a few weeks ago while we had a spell of good weather.

    Always something happening at the moment. Keep your eyes on our website for regular updates. 26power provided a link a couple of posts ago. That will take you straight to the news page.
     
    jnc apreciază asta.
  11. class8mikado

    class8mikado Part of the furniture

    Înscris:
    1 Iun 2009
    Mesaje:
    3.840
    Aprecieri primite:
    1.644
    Ocupație:
    Print Estimator/ Repository of Useless Informatio.
    Locație:
    Bingley W.Yorks.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Just out of interest, what function do the two 'Eyelets'on the top side of the frame extensions fulfil...
     
  12. LMS2968

    LMS2968 Part of the furniture

    Înscris:
    1 Sep 2006
    Mesaje:
    3.072
    Aprecieri primite:
    5.361
    Sex:
    Masculin
    Ocupație:
    Lecturer retired: Archivist of Stanier Mogul Fund
    Locație:
    Wigan
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Lifting the engine in shops?
     
    Jamessquared apreciază asta.
  13. 'Clan' Hengist

    'Clan' Hengist New Member

    Înscris:
    23 Oct 2014
    Mesaje:
    74
    Aprecieri primite:
    232
    Sex:
    Masculin
    Ocupație:
    Train Driver, Member Hengist Management Team
    Locație:
    East Midlands
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    They are indeed lifting eyes. Without looking at the drawings I cannot say if they are reinforced like the front ones, though I suspect that that will be the case.
     
  14. northernsteam

    northernsteam Member

    Înscris:
    25 Mai 2010
    Mesaje:
    609
    Aprecieri primite:
    297
    Sex:
    Masculin
    Ocupație:
    Used to be in civil engineering, highway bridges.
    Locație:
    Tyne and Wear
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Superceded by previous post
     
  15. Jamessquared

    Jamessquared Nat Pres stalwart

    Înscris:
    8 Mar 2008
    Mesaje:
    27.793
    Aprecieri primite:
    64.460
    Locație:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Not necessarily ...

    Different class - but if things are designed right, you can sling through the cab roof; all you need is too remove the floor.

    [​IMG]

    Also, no problem using those eyelets at an earlier stage of erection.

    Tom
     
    jnc și Bluenosejohn apreciază asta.
  16. std tank

    std tank Part of the furniture

    Înscris:
    20 Sep 2005
    Mesaje:
    3.927
    Aprecieri primite:
    1.070
    Sex:
    Masculin
    Ocupație:
    Retired
    Locație:
    Liverpool
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Reinforcement not required on the extension frames. They are 2" thick, whereas the main frame plates are 1-1/4" thick.
     
  17. 'Clan' Hengist

    'Clan' Hengist New Member

    Înscris:
    23 Oct 2014
    Mesaje:
    74
    Aprecieri primite:
    232
    Sex:
    Masculin
    Ocupație:
    Train Driver, Member Hengist Management Team
    Locație:
    East Midlands
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Thank you. Saves me going through the drawing files to look for a definitive answer.
     
  18. class8mikado

    class8mikado Part of the furniture

    Înscris:
    1 Iun 2009
    Mesaje:
    3.840
    Aprecieri primite:
    1.644
    Ocupație:
    Print Estimator/ Repository of Useless Informatio.
    Locație:
    Bingley W.Yorks.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Right, so in that case i can work out where the fire box ends... so onto my real question - what are the brown 'channel' pieces and their fiddly little mounts for .... Footplate supports ? with some allowance for boiler expansion |?
     
  19. 'Clan' Hengist

    'Clan' Hengist New Member

    Înscris:
    23 Oct 2014
    Mesaje:
    74
    Aprecieri primite:
    232
    Sex:
    Masculin
    Ocupație:
    Train Driver, Member Hengist Management Team
    Locație:
    East Midlands
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Again, without checking the drawings, I think they are the rear firebox support mounts. They are fitted so that they can move slightly forward and backwards to allow for expansion and contraction of the boiler.
     
  20. std tank

    std tank Part of the furniture

    Înscris:
    20 Sep 2005
    Mesaje:
    3.927
    Aprecieri primite:
    1.070
    Sex:
    Masculin
    Ocupație:
    Retired
    Locație:
    Liverpool
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Yes, they are the rear firebox supports, but they are in the wrong place. They should be in front of the eyelets, where the three holes are on the frame.
     

Distribuie pagina asta