If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Llangollen Railway

Тема в разделе 'Heritage Railways & Centres in the UK', создана пользователем 14xx Lover, 4 янв 2010.

  1. Sidmouth

    Sidmouth Resident of Nat Pres Staff Member Moderator

    Дата регистрации:
    12 сен 2005
    Сообщения:
    10.146
    Симпатии:
    9.777
    Пол:
    Мужской
    Адрес:
    Alderan !
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    nothing insurmountable were the money and opportunity there
     
  2. Breva

    Breva Well-Known Member

    Дата регистрации:
    11 окт 2010
    Сообщения:
    2.347
    Симпатии:
    4.078
    Адрес:
    Gloucestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    A conflict in terms, surely? They are there to be seen, and the interesting end at the top has been marred by the oil refinery pipe.
     
  3. flying scotsman123

    flying scotsman123 Resident of Nat Pres

    Дата регистрации:
    9 сен 2013
    Сообщения:
    10.674
    Симпатии:
    18.698
    Пол:
    Мужской
    Адрес:
    Cheltenham
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I apologise if this has been asked before, but on the tactile slabs, what is the difference between Corwen and, say, Broadway? Both are newbuild stations where there was nothing there before. Is the block paving cheaper than tarmac, which would surely look better?
     
    echap и Bill Drewett нравится это.
  4. Matt78

    Matt78 Well-Known Member

    Дата регистрации:
    27 июн 2007
    Сообщения:
    1.729
    Симпатии:
    3.862
    Род занятий:
    Solicitor
    Адрес:
    South Wales
    As I understand it tactile paving is recommended for new platforms. There seems to be a differing view about use on heritage railways. I believe that ORR would suggest that they should be used on a new platform (ORR do not give approval or otherwise).

    Ultimately it’s down to the railway concerned whether they are installed or not as they are ultimately responsible for the safety of the platform and its users.

    regards

    Matt
     
  5. RA & FC

    RA & FC Well-Known Member

    Дата регистрации:
    4 окт 2007
    Сообщения:
    1.128
    Симпатии:
    415
    Пол:
    Мужской
    Адрес:
    Gogledd Cymru
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Was Broadway not rebuilt on the original station site? Corwen platform is a complete new build rather than recreation of something that was there before. As for a tarmac surface, how do you get it onto a platform on top of an embankment with no road access to rail / platform level. Or indeed the machines to roll it.
     
    jnc нравится это.
  6. Breva

    Breva Well-Known Member

    Дата регистрации:
    11 окт 2010
    Сообщения:
    2.347
    Симпатии:
    4.078
    Адрес:
    Gloucestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Originally would have been 3x2s, not tarmac.
     
  7. RA & FC

    RA & FC Well-Known Member

    Дата регистрации:
    4 окт 2007
    Сообщения:
    1.128
    Симпатии:
    415
    Пол:
    Мужской
    Адрес:
    Gogledd Cymru
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    From what I believe the platform design is down to the constraints of the site. Not enough room length or widthways to do much more than what is there. 8 coach length one side, but only 6 the other with no ramps. I’m assuming this is to do with minimum width specification for island platforms against single faced platforms?
     
  8. RA & FC

    RA & FC Well-Known Member

    Дата регистрации:
    4 окт 2007
    Сообщения:
    1.128
    Симпатии:
    415
    Пол:
    Мужской
    Адрес:
    Gogledd Cymru
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    But then the GWR wouldn’t have built the platform out of legioblocks would it.
     
  9. flying scotsman123

    flying scotsman123 Resident of Nat Pres

    Дата регистрации:
    9 сен 2013
    Сообщения:
    10.674
    Симпатии:
    18.698
    Пол:
    Мужской
    Адрес:
    Cheltenham
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    It was indeed, yes. I'm struggling to wrap my head round why that makes a difference when they're both brand new stations starting with nothing on the ground (not a jab at you, but the ORR or whoever decides that it does make a difference!)

    As @Breva has said, slabs would have been much better than tarmac or blocks.
     
  10. Ploughman

    Ploughman Part of the furniture

    Дата регистрации:
    1 апр 2008
    Сообщения:
    5.969
    Симпатии:
    2.761
    Род занятий:
    Ex a lot of things.
    Адрес:
    Near where the 3 Ridings meet
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I believe that ramps are no longer a requirement for platforms.
    As long as measures such as fencing and step access are in place.
     
  11. Steve

    Steve Resident of Nat Pres Friend

    Дата регистрации:
    7 окт 2006
    Сообщения:
    12.729
    Симпатии:
    11.847
    Род занятий:
    Gentleman of leisure, nowadays
    Адрес:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    RSP5 suggests that tactile paviors should be provided. However, when we installed them on a new platform the Railway Inspector made the comment that they are not bothered about them on heritage railways. Make of that, what you will.
     
    jnc нравится это.
  12. Matt78

    Matt78 Well-Known Member

    Дата регистрации:
    27 июн 2007
    Сообщения:
    1.729
    Симпатии:
    3.862
    Род занятий:
    Solicitor
    Адрес:
    South Wales
    thank you, interesting. I had a slightly different comment but it was several years ago now.
     
  13. Herald

    Herald Member

    Дата регистрации:
    30 мар 2015
    Сообщения:
    311
    Симпатии:
    581
    Пол:
    Мужской
    Heritage Railway Volunteer:
    No I do not currently volunteer
    My guess would be that on a risk assessed basis there is a world of difference in terms of speeds and staff availability to assist people at heritage railways whereas mainline ones will often feature a total lack of staff and trains passing at high speed. Also when assessing relative risks an island will automatically be more hazardous as there is no safe area by a fence. Maybe somebody with impaired sight would be able to comment further.
     
  14. City of truro fan

    City of truro fan Member

    Дата регистрации:
    29 ноя 2015
    Сообщения:
    795
    Симпатии:
    90
    Пол:
    Женский
    Адрес:
    Honiton
    Heritage Railway Volunteer:
    No I do not currently volunteer
    They might hear a train come in one side and step back to get away from it and fall off the other side on an island. The Orr make them put them on these platforms more I would think.
     
  15. gwilialan

    gwilialan Well-Known Member

    Дата регистрации:
    8 дек 2012
    Сообщения:
    1.706
    Симпатии:
    3.987
    Пол:
    Мужской
    Адрес:
    Out there somewhere
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Isn't there something about wheelchair users having to be able to leave the platform in the case of a fire? (on a stopped train I assume. ) Don't know where they'd go though - they'd just end up un the cess or 6 foot.
     
  16. ross

    ross Well-Known Member

    Дата регистрации:
    18 май 2017
    Сообщения:
    1.002
    Симпатии:
    2.477
    Пол:
    Мужской
    Адрес:
    Titfield
    Heritage Railway Volunteer:
    No I do not currently volunteer
    There is a disabled access ramp from the west end of the new Corwen platform. Presumably there is a barrow crossing, but I wouldn't want to be the one writing the method statement for safe usage by non-railway personnel
     
  17. RA & FC

    RA & FC Well-Known Member

    Дата регистрации:
    4 окт 2007
    Сообщения:
    1.128
    Симпатии:
    415
    Пол:
    Мужской
    Адрес:
    Gogledd Cymru
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    There is a stairlift for wheelchair users to exit via the subway. I’m assuming this method is suitable in an emergency as there’s not much alternative! I believe they did look at having a narrow crossing then ramp down to the waterworks access road for the disabled access but this didn’t work out as the users would then end up on a fairly busy road with no pavements.
     
  18. Paulthehitch

    Paulthehitch Well-Known Member

    Дата регистрации:
    13 фев 2020
    Сообщения:
    1.090
    Симпатии:
    1.093
    Пол:
    Мужской
    Адрес:
    Hayling Island
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    This does not sound like a terribly brilliant arrangement in the event of fire, power failure or other kind of failure. In this sort of situation, buildings are required to provide evacuation chairs which are not free from difficulties of use and require special training of staff.
     
  19. City of truro fan

    City of truro fan Member

    Дата регистрации:
    29 ноя 2015
    Сообщения:
    795
    Симпатии:
    90
    Пол:
    Женский
    Адрес:
    Honiton
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I would imagine there would be an emergency gate somewhere that in a panic people could walk down to. But as for the disabled access I think this needs looking into. It is not good for people to be tempted onto the track.
     
  20. lil Bear

    lil Bear Part of the furniture

    Дата регистрации:
    11 дек 2006
    Сообщения:
    6.136
    Симпатии:
    1.700
    Пол:
    Мужской
    Род занятий:
    Railway Technician
    Адрес:
    8C / 5D / 27C / 71B
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Wasn’t Broadway on its original site? Therefore some grandfather rights were still applicable.

    It’s how Beddgelert was allowed to be rebuilt, new stations can’t have a gradient greater than 1in300(?) or something. However as Beddgelert was on its original site, it was permitted despite being on a 1in33.

    LR Corwen station will have none of this, as it is completely new with enhanced embankment.
     

Поделиться этой страницей