If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Bridge that Gap: Great Central Railway News

Discuție în 'Heritage Railways & Centres in the UK' creată de Gav106, 8 Mai 2010.

  1. Flying Phil

    Flying Phil Part of the furniture

    Înscris:
    10 Dec 2018
    Mesaje:
    3.018
    Aprecieri primite:
    6.318
    Sex:
    Masculin
    Locație:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Trains are now back running over the new bridge 341.
    There is another "Re-Unification" zoom talk on-line on Sunday 27th Sept.....details on the GCR website.
     
  2. Flying Phil

    Flying Phil Part of the furniture

    Înscris:
    10 Dec 2018
    Mesaje:
    3.018
    Aprecieri primite:
    6.318
    Sex:
    Masculin
    Locație:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Here is the view North over the refurbished Canal Bridge. DSC00297.JPG
     
    Gareth, weltrol, frazoulaswak și alți 10 apreciază asta.
  3. Johann Marsbar

    Johann Marsbar Well-Known Member

    Înscris:
    21 Feb 2016
    Mesaje:
    1.669
    Aprecieri primite:
    2.178
    Sex:
    Masculin
    Locație:
    Suffolk
    Heritage Railway Volunteer:
    No I do not currently volunteer
    There is another fundrasing talk on 29th November courtesy of a certain Class 86 owner..
    https://www.gcrailway.co.uk/unify/
    Another post has sneaked in under that announcement stating the reunification "pot" has gone up to £320K as of early October as well...
     
    jnc, 30854 și weltrol apreciază asta.
  4. Flying Phil

    Flying Phil Part of the furniture

    Înscris:
    10 Dec 2018
    Mesaje:
    3.018
    Aprecieri primite:
    6.318
    Sex:
    Masculin
    Locație:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    To get the "Pot" up to £320K is seriously impressive.
    This part of the fund started in March, the country has been in a Covid state since then. The Railway was shutdown and has steadily restarted - only to be shut down again. There has been a double track bridge totally replaced by a newly designed, built and installed (in 30 weeks) elsewhere on the railway.
    Obviously a lot of people have been working very hard.....Well Done!
     
    AndyY, 69530, The Dainton Banker și alți 8 apreciază asta.
  5. Drop_Shunt

    Drop_Shunt New Member

    Înscris:
    10 Apr 2007
    Mesaje:
    63
    Aprecieri primite:
    74
    I wouldn’t be surprised if the fundraising results drop right off now, as the apparent antipathy of the current MD towards the GCR(N) is becoming more evident. I don’t think it is much of a secret that his interest in bridging the gap begins, and ends, with the main line connection.

    As for the new bridge, perhaps the less said about that the better. I would hardly consider it to have been an unqualified success.
     
  6. Johann Marsbar

    Johann Marsbar Well-Known Member

    Înscris:
    21 Feb 2016
    Mesaje:
    1.669
    Aprecieri primite:
    2.178
    Sex:
    Masculin
    Locație:
    Suffolk
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I assume you are referring to the statement in the latest Steam Railway concerning a request for the Ruddington end to drop the "GCR" part, temporarily, until they get themselves sorted out with the ORR?
    My initial ressponse on reading that was along the lines of "WTF?", but realised that comments about the "GCR" having problems with the ORR could easily be taken to refer to the Loughborough operation rather than Ruddington. Any enthusiast with knowledge of the different set-ups will know which part is being referred to, but the "Public" at large are unlikely to do so....
     
    jnc, The Dainton Banker și mogulb apreciază asta.
  7. echap

    echap New Member

    Înscris:
    23 Sep 2009
    Mesaje:
    178
    Aprecieri primite:
    424
    Sex:
    Masculin
    Ocupație:
    Church Volunteer
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Could you expand on your comment about the new bridge please
     
    AndyY apreciază asta.
  8. Gunz412

    Gunz412 New Member Loco Owner

    Înscris:
    14 Feb 2013
    Mesaje:
    79
    Aprecieri primite:
    113
    This is however dangerous ground. If I get any sense of animosity between the two operations my donations to the reunification project will cease.
    The GCR has in my view been a very well run railway but there have been some troubling signs in recent months.
     
  9. Bikermike

    Bikermike Well-Known Member

    Înscris:
    11 Mar 2020
    Mesaje:
    1.814
    Aprecieri primite:
    2.045
    Sex:
    Masculin
    Locație:
    Thameslink territory
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Such as....?
     
  10. Flying Phil

    Flying Phil Part of the furniture

    Înscris:
    10 Dec 2018
    Mesaje:
    3.018
    Aprecieri primite:
    6.318
    Sex:
    Masculin
    Locație:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Despite the worry expressed by "Drop-Shunt", according to the GCR website the donations total went from £250,000 at the beginning of September to £320,000 at the beginning of October. This would seem to indicate that the donation rate is actually increasing......Which is even better news!
     
  11. Ian Milne

    Ian Milne New Member

    Înscris:
    5 Iun 2011
    Mesaje:
    159
    Aprecieri primite:
    93
    It’s one heck of a price to pay for a main line connection. Can’t see a cost-benefit case stacking up. Whilst I readily donated to the first bridge appeal, I have become increasingly sceptical about the reunification project. Creating a predominantly single track line from nowhere to nowhere seems at odds with a usp of a double track main line. Doubling from Rothley to Leicester would open my wallet, reunification won’t.
     
    Last edited by a moderator: 13 Noi 2020
  12. jnc

    jnc Well-Known Member

    Înscris:
    3 Apr 2012
    Mesaje:
    1.511
    Aprecieri primite:
    2.709
    Sex:
    Masculin
    Locație:
    Western Atlantic
    Heritage Railway Volunteer:
    No I do not currently volunteer
    There is an 'Edit' button.

    Noel
     
  13. Bikermike

    Bikermike Well-Known Member

    Înscris:
    11 Mar 2020
    Mesaje:
    1.814
    Aprecieri primite:
    2.045
    Sex:
    Masculin
    Locație:
    Thameslink territory
    Heritage Railway Volunteer:
    No I do not currently volunteer
    So much insinuation and so few facts...
     
    lil Bear, AndyY și The Dainton Banker apreciază asta.
  14. Flying Phil

    Flying Phil Part of the furniture

    Înscris:
    10 Dec 2018
    Mesaje:
    3.018
    Aprecieri primite:
    6.318
    Sex:
    Masculin
    Locație:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    It certainly is expensive....but, as has been said earlier, modern constructions are far more regulated than in the past.
    It is not surprising that a cost-benefit case doesn't stack up....it doesn't stack up for anything else in the heritage industry .....because it is driven by passion, not purely cash profit, as I'm sure you realise.
    Once the gap is closed, I am sure the museum project at Leicester will reappear - and then we will have the driver for double track extension - Rothley to Leicester.
    Still plenty of time and projects for donations to be made from open wallets;)
     
    lil Bear, AndyY, jnc și alți 3 apreciază asta.
  15. J Rob't Harrison

    J Rob't Harrison Member

    Înscris:
    6 Noi 2016
    Mesaje:
    240
    Aprecieri primite:
    360
    Sex:
    Masculin
    Locație:
    Stafford
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Fundamentally I'm donating to the project because one day I want to be able to get on a train at Loughborough Central and go north. The mainline connection is merely an additional benefit and one that I am rather unlikely to take advantage of, unless of course it's used for visiting locos on galas. Make no mistake about that. I've bought into this project in the spirit in which it has been marketed, and I expect the outcome to match the vision I have been sold. If it looks like the powers that be are going to arbitrarily alter that vision- and let's face it a bit of a public spat between the two groups, whilst unseemly, doesn't mean that- yet- they will lose my support.

    As for double track to Leicester, if the Railway announced it as a goal then yes it would gain my support and financial backing. Maybe once the Gap's closed, eh?
     
    mdewell, Flying Phil, jnc și alți 2 apreciază asta.
  16. Flying Phil

    Flying Phil Part of the furniture

    Înscris:
    10 Dec 2018
    Mesaje:
    3.018
    Aprecieri primite:
    6.318
    Sex:
    Masculin
    Locație:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    As J Rob't says, to stand on Loughborough station and hear "The next train for Ruddington will depart from Platform 2, the train from Leicester will arrive at Platform 1"......followed a little later by the Non-stopping 567 locomotive hauling a short express of Gresley teaks!....that's the vision I have.:Morewaitingisrequired:
     
    SpudUk, Mark Thompson, 35B și încă o persoană apreciază asta.
  17. AndyY

    AndyY Member

    Înscris:
    23 Feb 2013
    Mesaje:
    433
    Aprecieri primite:
    480
    Would the preservation of the Great Central ever have started if it had been required to pass a cost-benefit analysis??? I think not.
    Fortunately there are people with greater vision.
     
  18. 30854

    30854 Resident of Nat Pres

    Înscris:
    8 Mar 2017
    Mesaje:
    12.172
    Aprecieri primite:
    11.496
    Sex:
    Masculin
    Ocupație:
    Retired
    Locație:
    Brighton&Hove
    Heritage Railway Volunteer:
    No I do not currently volunteer
    You mean there are some lines which would? :Woot:

    100% with you on 'greater vision'. What a unremittingly tedious experience life would be were it not so.
     
  19. Legrandanglais

    Legrandanglais New Member

    Înscris:
    11 Sep 2011
    Mesaje:
    170
    Aprecieri primite:
    218
    Sex:
    Masculin
    Locație:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Gresley Teaks - NOOOOO - Short rake of GCR Barnum coaches!
     
  20. martin1656

    martin1656 Nat Pres stalwart Friend

    Înscris:
    8 Dec 2014
    Mesaje:
    19.260
    Aprecieri primite:
    12.512
    Sex:
    Masculin
    Locație:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    you forgot to add, " the next train does not stop, please stand well back" As the 9f , whistle blasting, hurries the windcutter's through the station :)
     

Distribuie pagina asta