If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

LMS Patriot Project Updates

الموضوع في 'Steam Traction' بواسطة Gav106, بتاريخ ‏10 إبريل 2011.

  1. Davo

    Davo Well-Known Member

    إنضم إلينا في:
    ‏12 اكتوبر 2018
    المشاركات:
    1,539
    عدد المعجبين:
    649
    الجنس:
    ذكر
    مكان الإقامة:
    W yorkshire 56f
    Heritage Railway Volunteer:
    No I do not currently volunteer
    A new axle is been provided by riley and son engineering for the rear drivers and as gav said 1 pair has already been welded on at rileys workshops and not forgetting a nearly complete boiler at H.B.S.S. to be trial fitted with superheater header and regulator dome, And the reversing gear screw completed by roach engineering. so things are moving forward a bit now
     
  2. fergusmacg

    fergusmacg Resident of Nat Pres

    إنضم إلينا في:
    ‏17 أوت 2008
    المشاركات:
    6,778
    عدد المعجبين:
    4,148
    الوظيفة:
    Design Engineer
    مكان الإقامة:
    Cumbria
    Not a terribly good record but it's hardly new news that there had been some really bad missteps along the way. I hate to ask what many may already be thinking but let's hope this is the last skeleton in quite a large cupboard and they are now on the road to recovery.
     
    أعجب بهذه المشاركة jnc
  3. jnc

    jnc Well-Known Member

    إنضم إلينا في:
    ‏3 إبريل 2012
    المشاركات:
    1,511
    عدد المعجبين:
    2,709
    الجنس:
    ذكر
    مكان الإقامة:
    Western Atlantic
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I think the astonishment was not at the events (which have the meaning you give here), but at the need to have them happen.

    Well, hopefully that sad (for several entities, unfortunately) period is now past...

    Noel
     
    أعجب بهذه المشاركة Richard Roper
  4. Platform 3

    Platform 3 Member

    إنضم إلينا في:
    ‏20 إبريل 2015
    المشاركات:
    880
    عدد المعجبين:
    1,197
    الجنس:
    ذكر
    Heritage Railway Volunteer:
    No I do not currently volunteer
    My concern is that such sentiments have been expressed before. I agree that hopefully this will be the last major obstacle but they do seem to have been a very unlucky project.

    Sent from my SM-G770F using Tapatalk
     
    أعجب بهذه المشاركة jnc
  5. osprey

    osprey Resident of Nat Pres

    إنضم إلينا في:
    ‏3 اكتوبر 2007
    المشاركات:
    10,493
    عدد المعجبين:
    2,850
    الوظيفة:
    semi-retired, currently doing R&D for my patents
    مكان الإقامة:
    Halifax
    Agree, absolutely horrendous. One thing I have hated all my career as an engineer is picking up after some previous poor workmanship/design .I always question "what else is there?" You have to try and think how the originator was thinking ....Anyhow things are now progressing in the right direction.
     
  6. martin1656

    martin1656 Nat Pres stalwart Friend

    إنضم إلينا في:
    ‏8 ديسمبر 2014
    المشاركات:
    19,263
    عدد المعجبين:
    12,514
    الجنس:
    ذكر
    مكان الإقامة:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    The problem is once you start to doubt the quality of the work done previously you have to in effect start from scratch again, because you then take everything apart again and check and re check whats been done and having to create a snag list of things you would have expected not to do.
     
    MarkinDurham و osprey معجبون بهذا.
  7. Davo

    Davo Well-Known Member

    إنضم إلينا في:
    ‏12 اكتوبر 2018
    المشاركات:
    1,539
    عدد المعجبين:
    649
    الجنس:
    ذكر
    مكان الإقامة:
    W yorkshire 56f
    Heritage Railway Volunteer:
    No I do not currently volunteer
    The only way now for L.M.S. Patriot group is forward once these driving wheels get welded rait and mainline certified and bogie frames to original stanier pat
    design and valve rod bearings get remetalled correctly (then i would say there on a winning role to get this new pat nearer to steaming)
    Davo 56F
     
  8. fergusmacg

    fergusmacg Resident of Nat Pres

    إنضم إلينا في:
    ‏17 أوت 2008
    المشاركات:
    6,778
    عدد المعجبين:
    4,148
    الوظيفة:
    Design Engineer
    مكان الإقامة:
    Cumbria
    Sadly as an engineer these things rarely are to do with "luck" or indeed the lack of it and involves competence and not forgetting that dirty word 'management'. That's not to say that things will always go perfectly (they won't - been there got the T-shirt) we should all now hope they can move forward in a much more smoothly and less haphazard way.
     
    Last edited: ‏6 ديسمبر 2020
    Sheff, ghost, 35B و 1 شخص آخر معجبون بهذا.
  9. jnc

    jnc Well-Known Member

    إنضم إلينا في:
    ‏3 إبريل 2012
    المشاركات:
    1,511
    عدد المعجبين:
    2,709
    الجنس:
    ذكر
    مكان الإقامة:
    Western Atlantic
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I think there's a good chance of that; the new management of the Unknown Warrior group seem to have gone through all the existing chassis/running gear/etc pretty thoroughly, as have the very competent PRCLT group, so hopefully they've combed out all the issues. Since HBSS have been doing the boiler all along (and a good job they seem to have been doing, too), that should be OK too. Fingers crossed!

    Noel
     
    Bluenosejohn, HBSS Ltd, Davo و 2 آخرون معجبون بهذا.
  10. Jordan Leeds

    Jordan Leeds New Member

    إنضم إلينا في:
    ‏10 فبراير 2018
    المشاركات:
    83
    عدد المعجبين:
    66
    الجنس:
    ذكر
    مكان الإقامة:
    lancashire/cheshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Just a point of correction the boiler was started at crewe, inner firebox was completed there as was the barrel assembly and other components.
     
  11. Richard Roper

    Richard Roper Well-Known Member

    إنضم إلينا في:
    ‏22 ماي 2006
    المشاركات:
    1,310
    عدد المعجبين:
    1,359
    الجنس:
    ذكر
    الوظيفة:
    Librarian
    مكان الإقامة:
    Just up the road from 56E Sowerby Bridge
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I'm so glad the boiler wasn't started at Llangollen...

    Richard.
     
    أعجب بهذه المشاركة Gav106
  12. Jordan Leeds

    Jordan Leeds New Member

    إنضم إلينا في:
    ‏10 فبراير 2018
    المشاركات:
    83
    عدد المعجبين:
    66
    الجنس:
    ذكر
    مكان الإقامة:
    lancashire/cheshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Nothing wrong with Llangollen boiler work I think you will. Find... Lot of misinformation available out there and rubbish being spoken
     
    7P6F و RA & FC معجبون بهذا.
  13. martin1656

    martin1656 Nat Pres stalwart Friend

    إنضم إلينا في:
    ‏8 ديسمبر 2014
    المشاركات:
    19,263
    عدد المعجبين:
    12,514
    الجنس:
    ذكر
    مكان الإقامة:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    By the same people i believe who went on to form HBSS
     
    HBSS Ltd, jnc و Richard Roper معجبون بهذا.
  14. Richard Roper

    Richard Roper Well-Known Member

    إنضم إلينا في:
    ‏22 ماي 2006
    المشاركات:
    1,310
    عدد المعجبين:
    1,359
    الجنس:
    ذكر
    الوظيفة:
    Librarian
    مكان الإقامة:
    Just up the road from 56E Sowerby Bridge
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Not particularly a comment on their boilerwork, but on some of the other things on 5551 which they managed to lose / manufacture badly / damage. Such as cutting pieces out of the Fowler Tender frames to make a temporary bogie pivot washer. Not good practice at all. With those issues in mind, I am glad they didn't start the boiler... There were odd things going on at that point in time, and a mistake with the boiler, whether deliberate or by accident, would have been exceedingly costly.

    Richard.
     
    Last edited: ‏6 ديسمبر 2020
    أعجب بهذه المشاركة Gav106
  15. std tank

    std tank Part of the furniture

    إنضم إلينا في:
    ‏20 سبتمبر 2005
    المشاركات:
    3,927
    عدد المعجبين:
    1,070
    الجنس:
    ذكر
    الوظيفة:
    Retired
    مكان الإقامة:
    Liverpool
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I think that the photo of Morayshire's new flues at the firebox tube plate, prior to their recent removal, would argue your statement.
     
    61994, Gav106, fergusmacg و 5 آخرون معجبون بهذا.
  16. Dan Hamblin

    Dan Hamblin Part of the furniture

    إنضم إلينا في:
    ‏27 مارس 2006
    المشاركات:
    2,549
    عدد المعجبين:
    190
    الوظيفة:
    Rolling Stock Engineer
    مكان الإقامة:
    Kent
    I ended up as lead engineer for a new measurement train, after the previous team fell by the wayside, and with hindsight it had serious issues that should have killed it there and then. Trouble is there is pressure from on high to deliver it and do it safely. Looking back now I can't believe we actually got it to a point where it could be tested on the line, including adding two more motor cars for tractive effort, but we did. Those legacy issues couldn't be overcome unfortunately and it will probably be scrapped in the New Year having languished in a depot since summer 2015.

    At least the Patriot has momentum behind it to overcome these issues, albeit with additional cost and delay implications. Fingers crossed that there are no more nasties lurking in the loco chassis. The current team have certainly learnt a lot of valuable lessons and seem to be picking up momentum again.

    Regards,

    Dan
     
    Gav106, osprey, 35B و 3 آخرون معجبون بهذا.
  17. jnc

    jnc Well-Known Member

    إنضم إلينا في:
    ‏3 إبريل 2012
    المشاركات:
    1,511
    عدد المعجبين:
    2,709
    الجنس:
    ذكر
    مكان الإقامة:
    Western Atlantic
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Oh, right, now that you mention it, that comes back. Crewe's announcement on that was one of the first sign of the change at Crewe, IIRC.

    The Warrior certainly had 'bad luck' with its contractors...

    Noel
     
  18. 43729

    43729 New Member

    إنضم إلينا في:
    ‏6 ديسمبر 2012
    المشاركات:
    126
    عدد المعجبين:
    207
    You have to feel sorry for those who have contributed to the patriot project financially, many of whom are no longer with us. No signs of apology from those in charge for any mismanagement, but a lot of blame for contractors.
     
    أعجب بهذه المشاركة Jordan Leeds
  19. Jordan Leeds

    Jordan Leeds New Member

    إنضم إلينا في:
    ‏10 فبراير 2018
    المشاركات:
    83
    عدد المعجبين:
    66
    الجنس:
    ذكر
    مكان الإقامة:
    lancashire/cheshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    And your view is qualified by?
     
  20. Bikermike

    Bikermike Well-Known Member

    إنضم إلينا في:
    ‏11 مارس 2020
    المشاركات:
    1,814
    عدد المعجبين:
    2,045
    الجنس:
    ذكر
    مكان الإقامة:
    Thameslink territory
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Well, the boiler inspector's view would be a good start. What's your's
     
    Richard Roper, Davo, marshall5 و 3 آخرون معجبون بهذا.

مشاركة هذه الصفحة