LMS Patriot Project Updates

Discussie in 'Steam Traction' gestart door Gav106, 10 apr 2011.

  1. Davo

    Davo Well-Known Member

    Lid geworden:
    12 okt 2018
    Berichten:
    1.539
    Leuk Bevonden:
    649
    Geslacht:
    Man
    Locatie:
    W yorkshire 56f
    Heritage Railway Volunteer:
    No I do not currently volunteer
    A new axle is been provided by riley and son engineering for the rear drivers and as gav said 1 pair has already been welded on at rileys workshops and not forgetting a nearly complete boiler at H.B.S.S. to be trial fitted with superheater header and regulator dome, And the reversing gear screw completed by roach engineering. so things are moving forward a bit now
     
  2. fergusmacg

    fergusmacg Resident of Nat Pres

    Lid geworden:
    17 aug 2008
    Berichten:
    6.778
    Leuk Bevonden:
    4.148
    Beroep:
    Design Engineer
    Locatie:
    Cumbria
    Not a terribly good record but it's hardly new news that there had been some really bad missteps along the way. I hate to ask what many may already be thinking but let's hope this is the last skeleton in quite a large cupboard and they are now on the road to recovery.
     
    jnc vindt dit leuk.
  3. jnc

    jnc Well-Known Member

    Lid geworden:
    3 apr 2012
    Berichten:
    1.511
    Leuk Bevonden:
    2.709
    Geslacht:
    Man
    Locatie:
    Western Atlantic
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I think the astonishment was not at the events (which have the meaning you give here), but at the need to have them happen.

    Well, hopefully that sad (for several entities, unfortunately) period is now past...

    Noel
     
    Richard Roper vindt dit leuk.
  4. Platform 3

    Platform 3 Member

    Lid geworden:
    20 apr 2015
    Berichten:
    880
    Leuk Bevonden:
    1.197
    Geslacht:
    Man
    Heritage Railway Volunteer:
    No I do not currently volunteer
    My concern is that such sentiments have been expressed before. I agree that hopefully this will be the last major obstacle but they do seem to have been a very unlucky project.

    Sent from my SM-G770F using Tapatalk
     
    jnc vindt dit leuk.
  5. osprey

    osprey Resident of Nat Pres

    Lid geworden:
    3 okt 2007
    Berichten:
    10.492
    Leuk Bevonden:
    2.841
    Beroep:
    semi-retired, currently doing R&D for my patents
    Locatie:
    Halifax
    Agree, absolutely horrendous. One thing I have hated all my career as an engineer is picking up after some previous poor workmanship/design .I always question "what else is there?" You have to try and think how the originator was thinking ....Anyhow things are now progressing in the right direction.
     
  6. martin1656

    martin1656 Nat Pres stalwart Friend

    Lid geworden:
    8 dec 2014
    Berichten:
    19.260
    Leuk Bevonden:
    12.512
    Geslacht:
    Man
    Locatie:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    The problem is once you start to doubt the quality of the work done previously you have to in effect start from scratch again, because you then take everything apart again and check and re check whats been done and having to create a snag list of things you would have expected not to do.
     
    MarkinDurham en osprey vinden dit leuk.
  7. Davo

    Davo Well-Known Member

    Lid geworden:
    12 okt 2018
    Berichten:
    1.539
    Leuk Bevonden:
    649
    Geslacht:
    Man
    Locatie:
    W yorkshire 56f
    Heritage Railway Volunteer:
    No I do not currently volunteer
    The only way now for L.M.S. Patriot group is forward once these driving wheels get welded rait and mainline certified and bogie frames to original stanier pat
    design and valve rod bearings get remetalled correctly (then i would say there on a winning role to get this new pat nearer to steaming)
    Davo 56F
     
  8. fergusmacg

    fergusmacg Resident of Nat Pres

    Lid geworden:
    17 aug 2008
    Berichten:
    6.778
    Leuk Bevonden:
    4.148
    Beroep:
    Design Engineer
    Locatie:
    Cumbria
    Sadly as an engineer these things rarely are to do with "luck" or indeed the lack of it and involves competence and not forgetting that dirty word 'management'. That's not to say that things will always go perfectly (they won't - been there got the T-shirt) we should all now hope they can move forward in a much more smoothly and less haphazard way.
     
    Last edited: 6 dec 2020
    Sheff, ghost, 35B en 1 andere persoon vinden dit leuk.
  9. jnc

    jnc Well-Known Member

    Lid geworden:
    3 apr 2012
    Berichten:
    1.511
    Leuk Bevonden:
    2.709
    Geslacht:
    Man
    Locatie:
    Western Atlantic
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I think there's a good chance of that; the new management of the Unknown Warrior group seem to have gone through all the existing chassis/running gear/etc pretty thoroughly, as have the very competent PRCLT group, so hopefully they've combed out all the issues. Since HBSS have been doing the boiler all along (and a good job they seem to have been doing, too), that should be OK too. Fingers crossed!

    Noel
     
    Bluenosejohn, HBSS Ltd, Davo en 2 anderen vinden dit leuk.
  10. Jordan Leeds

    Jordan Leeds New Member

    Lid geworden:
    10 feb 2018
    Berichten:
    83
    Leuk Bevonden:
    66
    Geslacht:
    Man
    Locatie:
    lancashire/cheshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Just a point of correction the boiler was started at crewe, inner firebox was completed there as was the barrel assembly and other components.
     
  11. Richard Roper

    Richard Roper Well-Known Member

    Lid geworden:
    22 mei 2006
    Berichten:
    1.310
    Leuk Bevonden:
    1.359
    Geslacht:
    Man
    Beroep:
    Librarian
    Locatie:
    Just up the road from 56E Sowerby Bridge
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I'm so glad the boiler wasn't started at Llangollen...

    Richard.
     
    Gav106 vindt dit leuk.
  12. Jordan Leeds

    Jordan Leeds New Member

    Lid geworden:
    10 feb 2018
    Berichten:
    83
    Leuk Bevonden:
    66
    Geslacht:
    Man
    Locatie:
    lancashire/cheshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Nothing wrong with Llangollen boiler work I think you will. Find... Lot of misinformation available out there and rubbish being spoken
     
    7P6F en RA & FC vinden dit leuk.
  13. martin1656

    martin1656 Nat Pres stalwart Friend

    Lid geworden:
    8 dec 2014
    Berichten:
    19.260
    Leuk Bevonden:
    12.512
    Geslacht:
    Man
    Locatie:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    By the same people i believe who went on to form HBSS
     
    HBSS Ltd, jnc en Richard Roper vinden dit leuk.
  14. Richard Roper

    Richard Roper Well-Known Member

    Lid geworden:
    22 mei 2006
    Berichten:
    1.310
    Leuk Bevonden:
    1.359
    Geslacht:
    Man
    Beroep:
    Librarian
    Locatie:
    Just up the road from 56E Sowerby Bridge
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Not particularly a comment on their boilerwork, but on some of the other things on 5551 which they managed to lose / manufacture badly / damage. Such as cutting pieces out of the Fowler Tender frames to make a temporary bogie pivot washer. Not good practice at all. With those issues in mind, I am glad they didn't start the boiler... There were odd things going on at that point in time, and a mistake with the boiler, whether deliberate or by accident, would have been exceedingly costly.

    Richard.
     
    Last edited: 6 dec 2020
    Gav106 vindt dit leuk.
  15. std tank

    std tank Part of the furniture

    Lid geworden:
    20 sep 2005
    Berichten:
    3.927
    Leuk Bevonden:
    1.070
    Geslacht:
    Man
    Beroep:
    Retired
    Locatie:
    Liverpool
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I think that the photo of Morayshire's new flues at the firebox tube plate, prior to their recent removal, would argue your statement.
     
    61994, Gav106, fergusmacg en 5 anderen vinden dit leuk.
  16. Dan Hamblin

    Dan Hamblin Part of the furniture

    Lid geworden:
    27 mrt 2006
    Berichten:
    2.549
    Leuk Bevonden:
    190
    Beroep:
    Rolling Stock Engineer
    Locatie:
    Kent
    I ended up as lead engineer for a new measurement train, after the previous team fell by the wayside, and with hindsight it had serious issues that should have killed it there and then. Trouble is there is pressure from on high to deliver it and do it safely. Looking back now I can't believe we actually got it to a point where it could be tested on the line, including adding two more motor cars for tractive effort, but we did. Those legacy issues couldn't be overcome unfortunately and it will probably be scrapped in the New Year having languished in a depot since summer 2015.

    At least the Patriot has momentum behind it to overcome these issues, albeit with additional cost and delay implications. Fingers crossed that there are no more nasties lurking in the loco chassis. The current team have certainly learnt a lot of valuable lessons and seem to be picking up momentum again.

    Regards,

    Dan
     
    Gav106, osprey, 35B en 3 anderen vinden dit leuk.
  17. jnc

    jnc Well-Known Member

    Lid geworden:
    3 apr 2012
    Berichten:
    1.511
    Leuk Bevonden:
    2.709
    Geslacht:
    Man
    Locatie:
    Western Atlantic
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Oh, right, now that you mention it, that comes back. Crewe's announcement on that was one of the first sign of the change at Crewe, IIRC.

    The Warrior certainly had 'bad luck' with its contractors...

    Noel
     
  18. 43729

    43729 New Member

    Lid geworden:
    6 dec 2012
    Berichten:
    126
    Leuk Bevonden:
    207
    You have to feel sorry for those who have contributed to the patriot project financially, many of whom are no longer with us. No signs of apology from those in charge for any mismanagement, but a lot of blame for contractors.
     
    Jordan Leeds vindt dit leuk.
  19. Jordan Leeds

    Jordan Leeds New Member

    Lid geworden:
    10 feb 2018
    Berichten:
    83
    Leuk Bevonden:
    66
    Geslacht:
    Man
    Locatie:
    lancashire/cheshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    And your view is qualified by?
     
  20. Bikermike

    Bikermike Well-Known Member

    Lid geworden:
    11 mrt 2020
    Berichten:
    1.814
    Leuk Bevonden:
    2.045
    Geslacht:
    Man
    Locatie:
    Thameslink territory
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Well, the boiler inspector's view would be a good start. What's your's
     
    Richard Roper, Davo, marshall5 en 3 anderen vinden dit leuk.