    MT276 is a minimum standard. Tolerances based on slack LMS practices.
     
    Romsey apreciază asta.
  2. Robin Moira White

    Robin Moira White Resident of Nat Pres

    Înscris:
    27 Apr 2014
    Mesaje:
    11.404
    Aprecieri primite:
    18.231
    Sex:
    Feminin
    Ocupație:
    Barrister
    Locație:
    Stogumber
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Happy New Year to all.

    Wherever the road may take you in 2021.

    New Year 2021.jpg
     
    Last edited: 1 Ian 2021
    Roger Thompson, Crawley Ben, big.stu și alți 11 apreciază asta.
  3. Matt37401

    Matt37401 Nat Pres stalwart

    Înscris:
    8 Iun 2014
    Mesaje:
    15.551
    Aprecieri primite:
    11.955
    Locație:
    Wnxx
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Does that exist anymore?
     
  4. Steve

    Steve Resident of Nat Pres Friend

    Înscris:
    7 Oct 2006
    Mesaje:
    12.732
    Aprecieri primite:
    11.848
    Ocupație:
    Gentleman of leisure, nowadays
    Locație:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Formally withdrawn in 1984. However it is still referred to in current standards.
     
  5. Matt37401

    Matt37401 Nat Pres stalwart

    Înscris:
    8 Iun 2014
    Mesaje:
    15.551
    Aprecieri primite:
    11.955
    Locație:
    Wnxx
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Ahh, ok
     
  6. Bayard

    Bayard Well-Known Member

    Înscris:
    26 Apr 2015
    Mesaje:
    1.841
    Aprecieri primite:
    3.904
    Sex:
    Masculin
    Heritage Railway Volunteer:
    No I do not currently volunteer
    As in so many things, here it was a case of "it's not what you do but the way that you do it". Saying that the Plc weren't going to be overhauling 53808, the way that they said it, together with the eviction of its owners from the railway and the writing down of the provision in the accounts for the overhaul, sounded much more like "Get off the railway, take your loco with you and no, we won't be overhauling it for you either".
    Surely it is a simple calculation: Is (cost of new tyres) x (remaining life expectancy) / (total life expectancy) > (additional cost of replacing tyres in five years' time)?
     
    nanstallon, jnc, free2grice și alți 2 apreciază asta.
  7. Jamessquared

    Jamessquared Nat Pres stalwart

    Înscris:
    8 Mar 2008
    Mesaje:
    27.800
    Aprecieri primite:
    64.483
    Locație:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The difficulty with that calculation is working out the cost in five years time, because that is dependent on other compromises you might be making. For example, to replace the tyres mid ticket means taking the loco into the works, dropping the motion, lifting off the wheels (lots of labour cost); sending the wheelsets away for new tyres (transport); the tyres themselves (cost) plus all of that in reverse to put it back together, plus the issue of storing the loco immobile while the wheels are away (potentially "bed blocking" one bay in your workshop).

    Done on its own, that is quite expensive and has several costs that you wouldn't have if you did it at initial overhaul (primarily the disassembly / reassembly) - but suppose at first overhaul you also knew that on predicted mileage, the loco would need a p&v overhaul in five years: well at that point, you need the loco in the works partly disassembled anyway, so now all the fixed costs of disassembly and reassembly get split over two jobs. Maybe at the point the balance shifts towards changing tyres mid way through the ticket that wouldn't otherwise be the case. Intermediate overhauls mid way through a ticket are increasingly becoming common for locos doing high annual mileage.

    Then you get the operational pressures: "We need the loco ready for March". That might result in a loco going into traffic with some "nice to haves" not done, put on the list of jobs to be done the following winter. ('Twas ever thus: it was not unknown on the LBSCR for locos to return to traffic unpainted because they were desperately needed for the summer season).

    Tom
     
    Steve, jnc, Bluenosejohn și încă o persoană apreciază asta.
  8. torgormaig

    torgormaig Part of the furniture Friend

    Înscris:
    17 Iul 2007
    Mesaje:
    4.906
    Aprecieri primite:
    7.651
    Surely it is a simple calculation: Is (cost of new tyres) x (remaining life expectancy) / (total life expectancy) > (additional cost of replacing tyres in five years' time)?[/QUOTE]

    Oh so simple! You may think so, but I doubt that those at the sharp end see it like that. For example, it may be the cost effective answer but what if you cannot afford new tyres at that point in time what do you suggest? Nothing is simple where the maintenance and operation of steam locos is concerned.

    Peter
     
    Steve, jnc, Hampshire Unit și încă o persoană apreciază asta.
  9. twr12

    twr12 Well-Known Member

    Înscris:
    2 Sep 2007
    Mesaje:
    1.659
    Aprecieri primite:
    821
    RIS-4472-RST “Engineering Requirements for Steam Locomotives and other Heritage Rail Vehicles”

    RIS-2003-RST “Certification and Registration of Heritage Rail Vehicles Operating on the GB Mainline Railway”

    Both reference MT/276 “Examination Schedule for Preserved Steam Locomotives running on B.R. Lines”

    The two RSSB RIS documents are current. RSSB members can download them from RSSB website.
     
    Steve apreciază asta.
  10. twr12

    twr12 Well-Known Member

    Înscris:
    2 Sep 2007
    Mesaje:
    1.659
    Aprecieri primite:
    821
    Oh so simple! You may think so, but I doubt that those at the sharp end see it like that. For example, it may be the cost effective answer but what if you cannot afford new tyres at that point in time what do you suggest? Nothing is simple where the maintenance and operation of steam locos is concerned.

    Peter[/QUOTE]

    Life expectancy of tyres is not directly related to mileage. On preserved railways there is a wide range of track geometry and quality. A relatively straight railway with good rail profile will have minimal wear to tyres.
    A curvy railway with correct cant for the curves, maintained rail greasers and good rail profile will get tyre flange wear, but not as much as on railways with poor rails with sharp edges, incorrect cant on curves and neglected greasers.
     
    Steve, Sunnieboy și jnc apreciază asta.
  11. smithersmark600

    smithersmark600 New Member

    Înscris:
    29 Iul 2020
    Mesaje:
    17
    Aprecieri primite:
    48
    Sex:
    Masculin
    Locație:
    Somerset
    Heritage Railway Volunteer:
    Yes I am an active volunteer

    I will just say one thing here. WSR do NOT thrash loco's, ever! Whatever your POV about the PLC dont take it out on the footplate crews who always treat locomotives with respect no mater who owns them!
     
    Dealornodeal, Steve, jnc și alți 7 apreciază asta.
  12. Downline

    Downline New Member

    Înscris:
    3 Apr 2020
    Mesaje:
    137
    Aprecieri primite:
    288
    Locație:
    Somerset
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Is that a fact or just your opinion?

    I don't think anyone on here (or not on here) can say the WSR do or do not thrash engines unless they are there supervising every loco movement ever made. And as that is an almost impossible task it would be fairer to make a comment on a general term like "the WSR treat there locos pretty well".
     
  13. martin1656

    martin1656 Nat Pres stalwart Friend

    Înscris:
    8 Dec 2014
    Mesaje:
    19.265
    Aprecieri primite:
    12.517
    Sex:
    Masculin
    Locație:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Perhaps thrash is the wrong word to use, 53808 Was heavily used in its last WSR year in operation So the operational department was rostering an locomotive, whilst at the same time the PLC was seeking to evict the owners, and at the same time telling the owners they might not fund the overhaul when it becomes due.
    The nearest comparison would be for someone to borrow your car, use your credit card to fill it up, Drive to John o grouts and back return it to you with the tank empty, no oil and water, and then say sorry i can't pay you .
     
  14. D1039

    D1039 Guest

    and can I borrow it again on Wednesday, to complete the analogy

    Patrick
     
  15. staffordian

    staffordian Well-Known Member

    Înscris:
    27 Mar 2012
    Mesaje:
    1.524
    Aprecieri primite:
    2.172
    Sex:
    Masculin
    Ocupație:
    Retired
    Locație:
    The Potteries
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I very much doubt any preserved line thrashes their locos. Ok some have to work harder than others (I'm thinking Foxfield up from the colliery), but I wonder if thrash was intended to suggest wringing the maximum use and mileage out of it rather than abusing it?
     
    johnofwessex și Wenlock apreciază asta.
  16. johnofwessex

    johnofwessex Resident of Nat Pres

    Înscris:
    6 Apr 2015
    Mesaje:
    9.748
    Aprecieri primite:
    7.859
    Sex:
    Masculin
    Ocupație:
    Thorn in my managers side
    Locație:
    72
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I hope the fireman isnt wearing a mask because of the exhaust from your car
     
  17. torgormaig

    torgormaig Part of the furniture Friend

    Înscris:
    17 Iul 2007
    Mesaje:
    4.906
    Aprecieri primite:
    7.651
    Where do you get these daft ideas from? There is no suggestion that the WSR ever used the 7F during 2019 without the owners consent despite them being made aware early in the year that there was some doubt about the Railways ability to fund the agreed overhaul when the time came. If it was used with the agreement of the S&DRT why should this be a problem?

    Peter
     
    6960 Raveningham Hall apreciază asta.
  18. RailWest

    RailWest Part of the furniture

    Înscris:
    7 Dec 2011
    Mesaje:
    3.984
    Aprecieri primite:
    7.802
    Sex:
    Masculin
    Locație:
    West Country
    Maybe the S&DRT was simply honouring their side of the agreement by allowing the WSR to continue using the loco in the (vain) hope that any apparent problem about future funding etc would soon by sorted out ?
     
    Great Western și Wenlock apreciază asta.
  19. nine elms fan

    nine elms fan Part of the furniture

    Înscris:
    18 Sep 2012
    Mesaje:
    2.439
    Aprecieri primite:
    855
    Sex:
    Masculin
    Ocupație:
    Retired
    Locație:
    Wessex
    Heritage Railway Volunteer:
    No I do not currently volunteer
    More likely is a state of shell shock after receiving the eviction notice.
     
    Great Western și Wenlock apreciază asta.
  20. Paulthehitch

    Paulthehitch Well-Known Member

    Înscris:
    13 Feb 2020
    Mesaje:
    1.090
    Aprecieri primite:
    1.093
    Sex:
    Masculin
    Locație:
    Hayling Island
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Do you really know or not whether this is so?
     

Distribuie pagina asta