If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

P2 Locomotive Company and related matters

Discussie in 'Steam Traction' gestart door class8mikado, 13 sep 2013.

  1. MrDibbs

    MrDibbs New Member

    Lid geworden:
    24 jan 2019
    Berichten:
    181
    Leuk Bevonden:
    149
    Locatie:
    York
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    As indeed they will be, the first coach Mk1 TSO 4290 has been so fitted. If I remember rightly there are another 12 to go.
     
  2. Richard Roper

    Richard Roper Well-Known Member

    Lid geworden:
    22 mei 2006
    Berichten:
    1.310
    Leuk Bevonden:
    1.359
    Geslacht:
    Man
    Beroep:
    Librarian
    Locatie:
    Just up the road from 56E Sowerby Bridge
    Heritage Railway Volunteer:
    No I do not currently volunteer
    CH 19, 242A1, Johnme101 en 4 anderen vinden dit leuk.
  3. 240P15

    240P15 Well-Known Member

    Lid geworden:
    1 dec 2017
    Berichten:
    1.603
    Leuk Bevonden:
    1.593
    Geslacht:
    Man
    Locatie:
    Norway
    Heritage Railway Volunteer:
    No I do not currently volunteer

    Thanks for posting this Richard! Much appreciated

    (BTW I really dig your signature: (Yorkshire. Where Men are Men and sheep are worried...):Joyful::)

    Knut
     
    Richard Roper vindt dit leuk.
  4. jnc

    jnc Well-Known Member

    Lid geworden:
    3 apr 2012
    Berichten:
    1.511
    Leuk Bevonden:
    2.709
    Geslacht:
    Man
    Locatie:
    Western Atlantic
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Pretty amazing to read that they plan on using CFD to model the steam flow "from the regulator to the blast pipe", to optimize it.

    I was also amused to see "If a smoke lifting problem is identified ... some relatively unobtrusive aerodynamic fences or strakes could be applied to solve the problem" - it sounds like a modern F1 car! :)

    Noel
     
    Richard Roper vindt dit leuk.
  5. class8mikado

    class8mikado Part of the furniture

    Lid geworden:
    1 jun 2009
    Berichten:
    3.841
    Leuk Bevonden:
    1.644
    Beroep:
    Print Estimator/ Repository of Useless Informatio.
    Locatie:
    Bingley W.Yorks.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Aeronautical Engineer at the Helm so not a surprise really...
     
    andrewshimmin en jnc vinden dit leuk.
  6. Bikermike

    Bikermike Well-Known Member

    Lid geworden:
    11 mrt 2020
    Berichten:
    1.814
    Leuk Bevonden:
    2.045
    Geslacht:
    Man
    Locatie:
    Thameslink territory
    Heritage Railway Volunteer:
    No I do not currently volunteer
    When you think about it, gasflow is everything in terms of power generation. It's also usually poorly-understood until very recently, so is a fruitful place to find some cheeky extra performance. All thermal engines move energy around in gasses.

    IMO, it's no coincidence that Ross Brawn managed that season with Jenson Button and no factory support on the back of a better diffuser than everyone else.
     
    jnc vindt dit leuk.
  7. Matt37401

    Matt37401 Nat Pres stalwart

    Lid geworden:
    8 jun 2014
    Berichten:
    15.551
    Leuk Bevonden:
    11.955
    Locatie:
    Wnxx
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Please don’t bring Formula One into this! :Gagmewithaspoon:
     
    Spamcan81 en goldfish vinden dit leuk.
  8. Bikermike

    Bikermike Well-Known Member

    Lid geworden:
    11 mrt 2020
    Berichten:
    1.814
    Leuk Bevonden:
    2.045
    Geslacht:
    Man
    Locatie:
    Thameslink territory
    Heritage Railway Volunteer:
    No I do not currently volunteer
    As a sport I find it dull as, as competitive engineering/full-contact governance-wrangling, it's quite interesting...
     
    andrewshimmin en Matt37401 vinden dit leuk.
  9. Matt37401

    Matt37401 Nat Pres stalwart

    Lid geworden:
    8 jun 2014
    Berichten:
    15.551
    Leuk Bevonden:
    11.955
    Locatie:
    Wnxx
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Fair point, but until 2007’s on the grid at Monaco can we just leave it in the other thread that’s supposed to cheer us up? Thanks :)
     
    The Green Howards, 35B en Bluenosejohn vinden dit leuk.
  10. Jamessquared

    Jamessquared Nat Pres stalwart

    Lid geworden:
    8 mrt 2008
    Berichten:
    27.806
    Leuk Bevonden:
    64.518
    Locatie:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Would be interesting seeing it go round Loews hairpin ...

    Tom
     
    andrewshimmin, 35B, ghost en 1 andere persoon vinden dit leuk.
  11. staffordian

    staffordian Well-Known Member

    Lid geworden:
    27 mrt 2012
    Berichten:
    1.524
    Leuk Bevonden:
    2.172
    Geslacht:
    Man
    Beroep:
    Retired
    Locatie:
    The Potteries
    Heritage Railway Volunteer:
    No I do not currently volunteer
    That might have been why they were looking for a turntable :D
     
  12. Dan Hamblin

    Dan Hamblin Part of the furniture

    Lid geworden:
    27 mrt 2006
    Berichten:
    2.549
    Leuk Bevonden:
    190
    Beroep:
    Rolling Stock Engineer
    Locatie:
    Kent
    With that wheelbase it would struggle with the chicane at pit lane exit!

    But dragging us back into reality - that is an impressive piece of engineering design for fabricating the cylinder block assembly. It will be interesting to see the assembly sequence and number of stress relieving treatments required to ensure design tolerances are met.

    Regards,

    Dan
     
    osprey en jnc vinden dit leuk.
  13. W.Williams

    W.Williams Well-Known Member

    Lid geworden:
    20 dec 2015
    Berichten:
    1.650
    Leuk Bevonden:
    1.559
    Beroep:
    Mechanical Engineer
    Locatie:
    Aberdeenshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Fantastic to see the use of CFD! This will help no end with power generation and also optimising valve timing and profiles.

    Have we covered this already, but, surely the final machining of bores etc is going to happen post-post weld heat treat?

    this isn’t going to be a fabrication of finish machine components being heat treated?

    Are we still talking about one final PWHT or are there going to be interim fabrications and heat treatments?

    Given it’s all bordering on thin wall (engineering definition) fabrication, I presume it’s going to be a case of leave the bores 50thou(?) oversize and then machine those (as well as all holes) once the whole fabrication has been heat treated?

    There is a lot of heat going in to this with the volume of weld, so distortion is always a threat.

    Or have I misread the part about the assembly sequence? Is the intent to reduce or eliminate distortion entirely through the sequence of assembly? Is the use of a cradle as a jigging fixture in the mix? Tack within cradle-weld all joints-remove from cradle-bake?

    That to me anyway is ambitious. Not impossible, but if we are talking about reducing the risk of distortion creating non conformance to DWG to an absolute minimum, leaving material on until a final machine as a competed and fully baked assembly would be the way I would go given my current level of understanding.

    Sure, the final machine operations will be a task and a half as one lump, but that would be the most dimensionally conformant cylinder block.


    Perhaps I’m missing something, happy to be corrected.
     
    Last edited: 4 jan 2021
    Richard Roper, jnc, Steve en 1 andere persoon vinden dit leuk.
  14. Allegheny

    Allegheny Member

    Lid geworden:
    8 mei 2015
    Berichten:
    637
    Leuk Bevonden:
    311
    Geslacht:
    Man
    Heritage Railway Volunteer:
    No I do not currently volunteer
    As I understand it Honda spent a small fortune developing the car the preceding season and then pulled out, and Ross Brawn took it over.
     
  15. Steve

    Steve Resident of Nat Pres Friend

    Lid geworden:
    7 okt 2006
    Berichten:
    12.734
    Leuk Bevonden:
    11.853
    Beroep:
    Gentleman of leisure, nowadays
    Locatie:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    IMHO it's very brave of the A1 team to contemplate a fabricated cylinder of this size. The only one I know of in recent times was one produced by the NYMR as a replacement for the cracked one on 76079 and that was a single cylinder, not a monobloc replacement. This turned out to be an expensive failure as it warped so much that even the machining tolerance was insufficient. In the end a new casting was provided. I sincerely hope that the P2 one is more successful.

    It will indeed be interesting to see what CFD throws up.
     
  16. W.Williams

    W.Williams Well-Known Member

    Lid geworden:
    20 dec 2015
    Berichten:
    1.650
    Leuk Bevonden:
    1.559
    Beroep:
    Mechanical Engineer
    Locatie:
    Aberdeenshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Go on, the whole project is brave, but that’s why we love it!

    Was said fabrication for 76079 post weld heat treated?

    As we know castings also have residual stresses which is often, in combination with other factors, why they end up cracking.

    Say the P2 group were casting 3 part cylinder or a monoblock, I would still query if a heat treatment was included to remove residual stresses that arise from uneven cooling of the casting.

    I have every confidence that this fabrication can be successful, and as successful as a casting. The fine details of the fabrication are what are ultimately going to make it so.

    Am I right in thinking the cylinder block will also get a proof-hydro test pre assembly in to the frames?
     
    240P15 vindt dit leuk.
  17. class8mikado

    class8mikado Part of the furniture

    Lid geworden:
    1 jun 2009
    Berichten:
    3.841
    Leuk Bevonden:
    1.644
    Beroep:
    Print Estimator/ Repository of Useless Informatio.
    Locatie:
    Bingley W.Yorks.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Interested to know whether this new approach to cylinder construction will need/ use' liners' ...
     
  18. Steve

    Steve Resident of Nat Pres Friend

    Lid geworden:
    7 okt 2006
    Berichten:
    12.734
    Leuk Bevonden:
    11.853
    Beroep:
    Gentleman of leisure, nowadays
    Locatie:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I guessing but I think it will be a necessity. Steel isn't exactly the best material for a cylinder that will use steam as the operating fluid.
     
    Richard Roper vindt dit leuk.
  19. JJG Koopmans

    JJG Koopmans Member

    Lid geworden:
    12 nov 2014
    Berichten:
    382
    Leuk Bevonden:
    474
    Geslacht:
    Man
    Heritage Railway Volunteer:
    No I do not currently volunteer
    ....resulting in the exhaust appearing to “leak” from the chimney encouraging it to stick to the boiler top,......
    A NACA cowling at the smokebox front instead of elephant ears will prevent that.
    Kind regards
     
    mike norris vindt dit leuk.
  20. class8mikado

    class8mikado Part of the furniture

    Lid geworden:
    1 jun 2009
    Berichten:
    3.841
    Leuk Bevonden:
    1.644
    Beroep:
    Print Estimator/ Repository of Useless Informatio.
    Locatie:
    Bingley W.Yorks.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Whats the current liner material of choice... SG Iron ?
     

Deel Deze Pagina