If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Isle of Wight Steam Railway

الموضوع في 'Heritage Railways & Centres in the UK' بواسطة Freshwater, بتاريخ ‏12 نوفمبر 2013.

  1. Jamessquared

    Jamessquared Nat Pres stalwart

    إنضم إلينا في:
    ‏8 مارس 2008
    المشاركات:
    27,793
    عدد المعجبين:
    64,456
    مكان الإقامة:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The gorgeous one is a C class - not only that, but the currently preserved one. Nice N1 on the left as well.

    Is this the picture puzzle thread? Tonbridge?

    Tom
     
    torgormaig و JMJR1000 معجبون بهذا.
  2. MellishR

    MellishR Resident of Nat Pres Friend

    إنضم إلينا في:
    ‏16 إبريل 2009
    المشاركات:
    8,912
    عدد المعجبين:
    5,847
    That implies that you would need two 08 shunters to move the unit. Can't one 08 shunter move considerably more than two tube coaches?
     
  3. JMJR1000

    JMJR1000 Member

    إنضم إلينا في:
    ‏27 جويلية 2009
    المشاركات:
    843
    عدد المعجبين:
    698
    الجنس:
    ذكر
    مكان الإقامة:
    Cleethorpes
    Ah thought as much, and of it's THE C Class sole survivor, hard to think it in such a state seeing how it's treated nowadays.

    A pity none of the N1s or U1s survived, quite unique to have the three cylinder arrangement for a design down south, even if maintenance wise perhaps more awkward to deal with then their two cylinder counterparts. Were said to be good performers though, especially the U1s.
     
  4. Matt37401

    Matt37401 Nat Pres stalwart

    إنضم إلينا في:
    ‏8 جوان 2014
    المشاركات:
    15,551
    عدد المعجبين:
    11,955
    مكان الإقامة:
    Wnxx
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Correct Tonbridge 1961
     
  5. Jamessquared

    Jamessquared Nat Pres stalwart

    إنضم إلينا في:
    ‏8 مارس 2008
    المشاركات:
    27,793
    عدد المعجبين:
    64,456
    مكان الإقامة:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Well, power and TE aren't quite the same - an 08 could move lots of them -- slowly.

    I guess the point I was trying, unsuccessfully, to make was that, in a fag packet sort of way, you are going to needs of the order of hundreds of horsepower, which in turn is a reasonably big motor-generator combination.

    Tom
     
    Last edited: ‏4 يناير 2021
    أعجب بهذه المشاركة Wenlock
  6. torgormaig

    torgormaig Part of the furniture Friend

    إنضم إلينا في:
    ‏17 جويلية 2007
    المشاركات:
    4,906
    عدد المعجبين:
    7,651
    Strange that, because it is the one on left that has survived not the one on the right.:)

    Peter
     
    أعجب بهذه المشاركة Jamessquared
  7. andrewtoplis

    andrewtoplis Well-Known Member

    إنضم إلينا في:
    ‏28 مارس 2006
    المشاركات:
    1,419
    عدد المعجبين:
    878
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    There is not a lot of spare space on a tube unit, so it would have to be many, many distributed cells in all sorts of books and crannies! Also, adding in a third car etc, isn't that getting a long way from what a 483 actually is?
     
  8. Christopher125

    Christopher125 Part of the furniture

    إنضم إلينا في:
    ‏30 نوفمبر 2005
    المشاركات:
    2,846
    عدد المعجبين:
    581
    مكان الإقامة:
    Isle of Wight
    2392 و cav1975 معجبون بهذا.
  9. RLinkinS

    RLinkinS Member

    إنضم إلينا في:
    ‏8 نوفمبر 2008
    المشاركات:
    982
    عدد المعجبين:
    972
    الجنس:
    ذكر
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The U1s were tried on the Withered Arm but were not liked there, the Ns were preffered. I suspect that the cylinders used steam faster than the boiler could provide it if the engines were worked hard

    Sent from my SM-A105FN using Tapatalk
     
  10. cav1975

    cav1975 Member

    إنضم إلينا في:
    ‏24 سبتمبر 2009
    المشاركات:
    526
    عدد المعجبين:
    649
    Matt37401 و Jamessquared معجبون بهذا.
  11. Matt37401

    Matt37401 Nat Pres stalwart

    إنضم إلينا في:
    ‏8 جوان 2014
    المشاركات:
    15,551
    عدد المعجبين:
    11,955
    مكان الإقامة:
    Wnxx
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Impressed with the guy from South Westerns back yard, 50035 nameplate and crest :)
     
  12. 3855

    3855 Member

    إنضم إلينا في:
    ‏27 سبتمبر 2008
    المشاركات:
    632
    عدد المعجبين:
    481
    الجنس:
    ذكر
    مكان الإقامة:
    inside a boiler
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    You can't beat a saturated six coupled tender engine....
     
    Paul42, John Petley, Bluenosejohn و 1 شخص آخر معجبون بهذا.
  13. Alan Kebby

    Alan Kebby Well-Known Member

    إنضم إلينا في:
    ‏18 سبتمبر 2019
    المشاركات:
    1,192
    عدد المعجبين:
    1,249
    الجنس:
    ذكر
    مكان الإقامة:
    Brighton
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Matt37401 و cav1975 معجبون بهذا.
  14. Steve

    Steve Resident of Nat Pres Friend

    إنضم إلينا في:
    ‏7 اكتوبر 2006
    المشاركات:
    12,729
    عدد المعجبين:
    11,847
    الوظيفة:
    Gentleman of leisure, nowadays
    مكان الإقامة:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    According to the gradient plan published on Nat Pres the maximum grade is 1 in 70. Wiki suggests an all up weight for the two car set of 54 tons. Lets say an additional 10 tons for a full load and a gen set. My basic mental arithmetic suggests that to climb this at 25 mph will require an installed horsepower of 64/70 x 5 x 36 = 165 hp. That's not a very big genset although I doubt you would pick op a 630v DC set off the shelf.
    For those technically minded, 64 is the gross load in tons; 70 is the gradient, 36 is the speed in ft/s (25 mph) and 5 is handy figure for doing mental calculations which tends to err on the high side. I used to regularly get asked in meetings what size haulage engine would be required to haul so many tons at such a speed (nearly always in ft/s) and I could do this calc in my head and give an answer there and then which I knew wouldn't be too small. If you want to do a more detailed calculation including rolling resistance, curve resistance and other minor variables, it won't come out to be too much different.
     
    RLinkinS, jnc و Wenlock معجبون بهذا.
  15. 35B

    35B Nat Pres stalwart

    إنضم إلينا في:
    ‏18 جوان 2011
    المشاركات:
    28,731
    عدد المعجبين:
    28,659
    الجنس:
    ذكر
    مكان الإقامة:
    Grantham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    That feels more real than the hp calculation from Tom - 670hp is the sort of level you’d find in a 2 car class 15x Sprinter unit. I’m not sure that 1938 stock on a preserved line compares (say) to what’s required to run a 158 up the Highland Main Line!


    Sent from my iPad using Tapatalk
     
  16. Jamessquared

    Jamessquared Nat Pres stalwart

    إنضم إلينا في:
    ‏8 مارس 2008
    المشاركات:
    27,793
    عدد المعجبين:
    64,456
    مكان الإقامة:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Fair comment, though what is your generator efficiency? ie how much diesel power do you need to produce 165hp at the electric motors? (Genuine question; I don't know the answer).

    I was just after an order of magnitude calculation, and I did note that that was the power for a higher speed that 25mph! So basically we are somewhere in the range 165 < power < 670; somewhere in that range it is still a relatively big lump.

    Tom
     
  17. Paulthehitch

    Paulthehitch Well-Known Member

    إنضم إلينا في:
    ‏13 فبراير 2020
    المشاركات:
    1,090
    عدد المعجبين:
    1,093
    الجنس:
    ذكر
    مكان الإقامة:
    Hayling Island
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Only a WIBNite would think of this as "looking forward"! WIBN tends to be a money pit
     
  18. pmh_74

    pmh_74 Part of the furniture

    إنضم إلينا في:
    ‏28 يناير 2009
    المشاركات:
    2,423
    عدد المعجبين:
    1,707
    All this talk of batteries and generators... surely the IOW is the one place where there is actually a realistic chance of one of these ex-Tube trains going for a spin on the 'main line'? Wouldn't it be better to just do that a couple of times a year?
     
    أعجب بهذه المشاركة Paulthehitch
  19. Alan Kebby

    Alan Kebby Well-Known Member

    إنضم إلينا في:
    ‏18 سبتمبر 2019
    المشاركات:
    1,192
    عدد المعجبين:
    1,249
    الجنس:
    ذكر
    مكان الإقامة:
    Brighton
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Depends if they remain compatible with the signalling and systems used on the new stock and upgraded line.

    Also a physical connection between the IOWSR and Island line would be needed. Is that likely to happen I wonder?

    Unfortunately I think a 483 returning to Island Line will remain in WIBN territory.
     
    Last edited: ‏5 يناير 2021
  20. MellishR

    MellishR Resident of Nat Pres Friend

    إنضم إلينا في:
    ‏16 إبريل 2009
    المشاركات:
    8,912
    عدد المعجبين:
    5,847
    How about batteries that can be swapped in a few minutes, as quickly as running round with a steam loco? Then one can be on (fast) charge while the other is powering the train. The size of battery that you have in an electric car should have enough capacity for once down the line, or possibly even there and back.
     

مشاركة هذه الصفحة