If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Current and Proposed New-Builds

Тема в разделе 'Steam Traction', создана пользователем aron33, 15 авг 2017.

  1. aron33

    aron33 Member

    Дата регистрации:
    22 май 2016
    Сообщения:
    517
    Симпатии:
    630
    Пол:
    Мужской
    Род занятий:
    Food packaging worker
    Адрес:
    Mayfield, KY (USA)
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Also to report, the team building “George the Fifth” received their rear frame plates today at their site in North Nottinghamshire.
     
  2. MellishR

    MellishR Resident of Nat Pres Friend

    Дата регистрации:
    16 апр 2009
    Сообщения:
    8.912
    Симпатии:
    5.849
    I have considered supporting the George the Fifth project but have not yet done so. I am intrigued by this statement on the website: "An engine of this size and power is ideal for the permanent way and the requirements of most heritage lines yet powerful enough for mainline excursions". In BR terms, would a George the Fifth be even a Class 4?
     
  3. flying scotsman123

    flying scotsman123 Resident of Nat Pres

    Дата регистрации:
    9 сен 2013
    Сообщения:
    10.674
    Симпатии:
    18.700
    Пол:
    Мужской
    Адрес:
    Cheltenham
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    They were 3P under the LMS, so I guess the same under BR too.
     
  4. LMS2968

    LMS2968 Part of the furniture

    Дата регистрации:
    1 сен 2006
    Сообщения:
    3.072
    Симпатии:
    5.361
    Пол:
    Мужской
    Род занятий:
    Lecturer retired: Archivist of Stanier Mogul Fund
    Адрес:
    Wigan
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    It didn't stop the LNWR and LMS using them on fourteen coach trains out of Euston, though!
     
  5. Cartman

    Cartman Part of the furniture

    Дата регистрации:
    14 дек 2015
    Сообщения:
    2.755
    Симпатии:
    2.109
    Пол:
    Мужской
    Род занятий:
    Van driver
    Адрес:
    Cheshire
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Didn't one have to take over from a Scot which had failed, and to save time, the Scot was left coupled to the train so the George had to take 14 plus a dead Scot?
     
  6. Allegheny

    Allegheny Member

    Дата регистрации:
    8 май 2015
    Сообщения:
    637
    Симпатии:
    311
    Пол:
    Мужской
    Heritage Railway Volunteer:
    No I do not currently volunteer
    What speed did they achieve though?

    I understand the group building the George the Fifth have said that they are planning to rectify known deficiencies with the original design, which can mean practically anything!
     
    Jamessquared нравится это.
  7. Hermod

    Hermod Well-Known Member

    Дата регистрации:
    6 май 2017
    Сообщения:
    1.109
    Симпатии:
    317
    Пол:
    Мужской
    Адрес:
    Klitmoeller,Denmark
    Heritage Railway Volunteer:
    No I do not currently volunteer
    According to Nock they were very good.
    According to Cox they were marvelous frame breakers.
    If proposals for improvements are welcome here is my first:
    The frames were made from two pieces spliced between cylinder aft ends and the slide bar,Joy valve gear stay.
    I would propose to put this splicing around driving axle hornblocks.
     
  8. class8mikado

    class8mikado Part of the furniture

    Дата регистрации:
    1 июн 2009
    Сообщения:
    3.840
    Симпатии:
    1.644
    Род занятий:
    Print Estimator/ Repository of Useless Informatio.
    Адрес:
    Bingley W.Yorks.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Understand they had Trick valves which made them ' noisy starters' ... no idea what a trick valve is..
     
  9. D6332found

    D6332found Member

    Дата регистрации:
    3 дек 2016
    Сообщения:
    399
    Симпатии:
    233
    Пол:
    Мужской
    Адрес:
    Dinting
    Heritage Railway Volunteer:
    No I do not currently volunteer
    If we just had 2 writers today, all CLass 47s could be remembered for unreliable exploding engines(not mentioning it was in late 1960s then rebuilt and 55 years in!) and wonderful warships were the most reliable on BR(not mentioning it was for 1 week only!) and withdrawn because of hydraulic prejudice.
    It's more interesting on their performance/engineering and railwayman's opinion. It could be this era of Pregrouping history needs more accurately reinvestingating more fairly.
     
    pete2hogs, andrewshimmin, jnc и 3 другим нравится это.
  10. Bluenosejohn

    Bluenosejohn New Member

    Дата регистрации:
    15 мар 2017
    Сообщения:
    173
    Симпатии:
    343
    Пол:
    Мужской
    Адрес:
    Birmingham
    Heritage Railway Volunteer:
    No I do not currently volunteer


    There was in the January Backtrack in 2013 an interesting article by Ted Talbot on cracked frames in LNWR locomotives in LMS days and then follow up correspondence in February and March. The problem with the frames was said to have started in LMS days when it was decided to remove the centre bearings and supporting frames. The origin of the article is from a conversation the author had with Kenneth Cantlie in the 1970's and quotes William Stanier in support of the fact that the removals were the problem.

    One of O.S. Nock's output is 'LNWR Locomotives of C.J. Bowen-Cooke' published by Bradford Barton in 1977. Unusually for the publishers concerned it is a hard back produced to the same standard as their picture books but is actually text with illustrations as opposed to pictures with brief captions. Although Nock's very prolific and wide output does have quite a few potboilers this is not one of them. It is a subject that he obviously had a great interest in and one of his main sources is the aforementioned Kenneth Cantlie who was a pupil of Bowen-Cooke. Nock quotes a letter from Cantlie which supports Ted Talbot's article:

    ''When I was in England in 1934 I went to see Stanier at Euston and during our long talks he chanced to say that the 'Princes' were cracking their frames badly. Had it been the same in my day? I said certainly not- I could not remember a single case . I supposed it was metal fatigue, but when I went to Camden at Stanier's request and looked them over, I found neither the Princes' or Georges' had centre bearings. The District Locomotive Superintendent, Wicken, said he couldn't understand why they had been removed, and that there had been hot boxes and cracked frames ever since. Fulminating, I returned to Stanier and asked who had taken them out, and why? He said he didn't know!''

    It is also worth bearing in mind that it is apparent from his writings that Cox had no love of the LNWR and from comments I have seen over the years of those who came across him quite a few felt the same way about Mr Cox!
     
    pete2hogs, Richard Roper, andrewshimmin и 2 другим нравится это.
  11. Bluenosejohn

    Bluenosejohn New Member

    Дата регистрации:
    15 мар 2017
    Сообщения:
    173
    Симпатии:
    343
    Пол:
    Мужской
    Адрес:
    Birmingham
    Heritage Railway Volunteer:
    No I do not currently volunteer

    They successfully operated the express services of the LNWR and had to cope with considerably increased loadings as did all the railways during of the Great War.

    The timings for the express services were no sinecure either. For instance from London to Birmingham was looked upon to be two hours for which they had to compete with the Great Western. It was not until electrification that those timings were to be drastically improved.

    O.S. Nock in the book quoted in my post above devotes time to analysing performances. Overall he was impressed with the design and one of the statements is:

    'Comparisons may be odious, but I think it is very safe to assert that during those years from 1911 to the wartime deceleration of train services, from January 1917 onwards, the performance of the 'George the Fifth' class engines were incomparable among British 4-4-0 engines, and that there were equally no 'Atlantics' and very few 4-6-0's that could equal it.'
     
    BrightonBaltic, andrewshimmin, Jamessquared и ещё 1-му нравится это.
  12. Cartman

    Cartman Part of the furniture

    Дата регистрации:
    14 дек 2015
    Сообщения:
    2.755
    Симпатии:
    2.109
    Пол:
    Мужской
    Род занятий:
    Van driver
    Адрес:
    Cheshire
    Heritage Railway Volunteer:
    No I do not currently volunteer
    They are aiming to go mainline with the George. Will it be worth the extra expense for the amount of main line work a 4-4-0 in class 3 would get, even though they did class 7 work on the LNWR and LMS?
     
  13. LMS2968

    LMS2968 Part of the furniture

    Дата регистрации:
    1 сен 2006
    Сообщения:
    3.072
    Симпатии:
    5.361
    Пол:
    Мужской
    Род занятий:
    Lecturer retired: Archivist of Stanier Mogul Fund
    Адрес:
    Wigan
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I have had this conversation, although not in that detail, for some time with Hermod, who believes that the centre bearing added noting to the stiffness of the frames nor to the reduction of stress away from the driving horn gaps. The engines were designed to have three bearings on the crank axle; that was a major point of using Joy's valve gear as there were no eccentrics in the way and plenty of space to allow the bearing. Once the centre bearing was eliminated, all the piston thrusts had to be absorbed by the horn gaps only, and the cracking began.

    This happened on all LNWR engines, and with the same result with all of them. It wasn't a fault with Crewe's design but whoever decided to remove the bearings, apparently to reduce maintenance!
     
    S.A.C. Martin, pete2hogs, 242A1 и 5 другим нравится это.
  14. Jamessquared

    Jamessquared Nat Pres stalwart

    Дата регистрации:
    8 мар 2008
    Сообщения:
    27.798
    Симпатии:
    64.476
    Адрес:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    What I found most eye opening in the quote provided by @Bluenosejohn is that apparently no-one seemed to know who had authorised the removal!

    Presumably there were sub-frames to support the centre bearing that were left behind when the bearings themselves were removed?

    Tom
     
    pete2hogs и andrewshimmin нравится это.
  15. Bluenosejohn

    Bluenosejohn New Member

    Дата регистрации:
    15 мар 2017
    Сообщения:
    173
    Симпатии:
    343
    Пол:
    Мужской
    Адрес:
    Birmingham
    Heritage Railway Volunteer:
    No I do not currently volunteer

    One of the follow up letters to the Backtrack article is from Joseph Cliffe who states that the LMS directive dated from 1923 and must have been sanctioned by George Hughes. He writes that it is unlikely the frame cracking would have resulted from the removal and the likely cause was that LNWR frames were only 1'' thick as opposed to elsewhere being more likely 1 1/8'' and Swindon and possibly tellingly in this instance Horwich using 1 1/4''.

    Having defended the issue of the frames Mr Cliffe does state that the measures also resulted in increased hot boxes which did nobody any favours.

    There are plenty of people on here who can debate the merits of such engineering matters but I am certainly not one of them!
     
  16. Hermod

    Hermod Well-Known Member

    Дата регистрации:
    6 май 2017
    Сообщения:
    1.109
    Симпатии:
    317
    Пол:
    Мужской
    Адрес:
    Klitmoeller,Denmark
    Heritage Railway Volunteer:
    No I do not currently volunteer
    It is easy to meassure frame stresses with strain gauges with and without the midbearing.
     
  17. Wozzy18

    Wozzy18 New Member

    Дата регистрации:
    22 авг 2019
    Сообщения:
    68
    Симпатии:
    396
    Пол:
    Мужской
    Адрес:
    Penticton, British Columbia, Canada
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    On other new build progress, the hornblocks for B17 61673 Spirit of Sandringham have just been completed at William Cook Cast Products in Sheffield.

    Hornblock_Castings (1).jpg Hornblock_Castings (4).jpg
     
    Last edited: 8 янв 2021
    BrightonBaltic, pete2hogs, aron33 и 5 другим нравится это.
  18. Steve

    Steve Resident of Nat Pres Friend

    Дата регистрации:
    7 окт 2006
    Сообщения:
    12.732
    Симпатии:
    11.848
    Род занятий:
    Gentleman of leisure, nowadays
    Адрес:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    2392 нравится это.
  19. 2392

    2392 Well-Known Member

    Дата регистрации:
    7 июн 2010
    Сообщения:
    1.902
    Симпатии:
    1.148
    Пол:
    Мужской
    Адрес:
    Felling on Tyne
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    That struck me too Steve 8 horn guides......
     
  20. Bikermike

    Bikermike Well-Known Member

    Дата регистрации:
    11 мар 2020
    Сообщения:
    1.814
    Симпатии:
    2.045
    Пол:
    Мужской
    Адрес:
    Thameslink territory
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Convertible to a 4-8-0. Gresley was going to name them after Rugby League teams...

    (Presumably a combo of spares and cover in case of porous castings?)
     
    BrightonBaltic, andrewshimmin и Wozzy18 нравится это.

Поделиться этой страницей