If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Ecclesbourne Valley Railway

Discuție în 'Heritage Railways & Centres in the UK' creată de martinr1, 12 Sep 2014.

  1. flying scotsman123

    flying scotsman123 Resident of Nat Pres

    Înscris:
    9 Sep 2013
    Mesaje:
    10.673
    Aprecieri primite:
    18.696
    Sex:
    Masculin
    Locație:
    Cheltenham
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Voted - looks superb, very well done!
     
    3ABescot și 30854 apreciază asta.
  2. daveannjon

    daveannjon Well-Known Member

    Înscris:
    31 Mar 2006
    Mesaje:
    1.114
    Aprecieri primite:
    425
    Locație:
    Waiting for the Right Away
    Thank you.
    Dave
     
  3. nferguso_wyvern

    nferguso_wyvern New Member

    Înscris:
    17 Feb 2008
    Mesaje:
    175
    Aprecieri primite:
    79
    Sex:
    Masculin
    Ocupație:
    Vice Chairman
    Locație:
    Wirksworth, Derbyshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I have voted too. The carriage is just lovely and my heart leaps whenever I see it.
     
  4. daveannjon

    daveannjon Well-Known Member

    Înscris:
    31 Mar 2006
    Mesaje:
    1.114
    Aprecieri primite:
    425
    Locație:
    Waiting for the Right Away
    Thank you - can't wait for a ride in it! Tell your friends to vote :)

    Dave
     
  5. sleepermonster

    sleepermonster Member

    Înscris:
    19 Iun 2007
    Mesaje:
    953
    Aprecieri primite:
    1.094
    Despite everything we continue to make progress. The maintenance facility is being extended by about 30ft, the main structure is now up and secure and the PW dept are extending the tracks under cover.

    In the hope that it will be possible to run trains at Easter we are taking bookings for "The Train through the Easter Countryside", a special event for families in compartment coaches involving socially distanced chocolate eggs. We also hope to offer seats for ordinary visitors to travel "Vintage Class" in the LMSCA porthole brake with distanced seating arrangements. All bookings will be refundable if it does not come off, please keep an eye on the website.

    Bagnall 2746 The Duke: tubing of the boiler now in progress, hoping for a hydraulic test soon.
     
    Davo, Johnme101, jnc și alți 2 apreciază asta.
  6. sleepermonster

    sleepermonster Member

    Înscris:
    19 Iun 2007
    Mesaje:
    953
    Aprecieri primite:
    1.094
    Here is the new extension to the maintenance facility; also the road rail machine purchased about a year ago has been in action, it is a very impressive beast!
     

    Fișiere atașate:

    56092, Johnme101 și Bluenosejohn apreciază asta.
  7. sleepermonster

    sleepermonster Member

    Înscris:
    19 Iun 2007
    Mesaje:
    953
    Aprecieri primite:
    1.094
    The Easter service will be re- examined by the Board this weekend, it may be that a tightly controlled service as operated at Christmas may be possible. If not, we will not have that much longer to wait. Watch this space. At least it would give more time for engineering works; the road railer has been busy down the line laying out a large batch of concrete sleepers, and will soon be in action again, with about 8 panels due for re-laying.
     
    Last edited: 24 Feb 2021
    jnc apreciază asta.
  8. sleepermonster

    sleepermonster Member

    Înscris:
    19 Iun 2007
    Mesaje:
    953
    Aprecieri primite:
    1.094
    The Easter service is cancelled, we are now looking at starting services around Thursday 15th April, to be confirmed.

    Meanwhile three of the eight panels have been relaid on concrete sleepers and the floor of the shed extension has been concreted - see photographs below. LS Enterprises are undertaking a particularly thorough contract overhaul of another Gresley coach. The frames of Cathryn have been shunted out of the shed ready to receive the boiler; the word from Loughborough is that the boilee for The Duke has had all the tubes fitted and expanded; there are still detailed jobs to do but a hydraulic test should take place before long.
    IMG_0777[1].JPG IMG_0778[1].JPG
     

    Fișiere atașate:

    ChurnetMan, Vulcan Works, 56092 și alți 3 apreciază asta.
  9. sleepermonster

    sleepermonster Member

    Înscris:
    19 Iun 2007
    Mesaje:
    953
    Aprecieri primite:
    1.094
    WyvernRail plc are delighted to announce that they have reached agreement with the Princess Royal Class Locomotive Trust (PRCLT) for BR Standard class 4 tank locomotive 80080 to operate on the Ecclesbourne Valley Railway. This popular powerful main line certified locomotive is set to arrive on the railway ready for its reopening following the Coronavirus lockdown and will operate for an initial two year stay at the EVR.
     
    Chris86, Davo, Andy2857 și alți 9 apreciază asta.
  10. ghost

    ghost Part of the furniture

    Înscris:
    29 Mai 2006
    Mesaje:
    4.303
    Aprecieri primite:
    5.727
    Sex:
    Masculin
    Locație:
    N.Ireland
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Does this deal for 80080 replace the previously announced deal for 9466, or is the intention to have both available for service in due course?
    Thanks in advance
     
  11. sleepermonster

    sleepermonster Member

    Înscris:
    19 Iun 2007
    Mesaje:
    953
    Aprecieri primite:
    1.094
    We expect to have both 9466 and 80080 in trafiic this summer.
     
    Johnme101, and60007 și ghost apreciază asta.
  12. Squiffy

    Squiffy New Member

    Înscris:
    31 Mar 2020
    Mesaje:
    26
    Aprecieri primite:
    32
    Sex:
    Masculin
    Ocupație:
    Architect
    Locație:
    Bathford
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Just going back to the shed extension, is the there anything special about the details of the track set into the concrete floor to allow for movement between materials? I can see that steel sleepers have been used but was curious about how the channel for the wheel flanges was formed and if any other materials were required as part of the final arrangement. Cheers
     
  13. sleepermonster

    sleepermonster Member

    Înscris:
    19 Iun 2007
    Mesaje:
    953
    Aprecieri primite:
    1.094
    Hi Squiffy,

    The flangeways do not show in the photographs. The concrete had only been laid the day before so the formers had not been pulled out; hollow section bars about 30mm square were laid in the concrete and will have been pulled out by now. Look carefully and you will see pale lines in the concrete where the paper thin layer on top of the rails and bars has dried.
     
    jnc și Squiffy apreciază asta.
  14. sleepermonster

    sleepermonster Member

    Înscris:
    19 Iun 2007
    Mesaje:
    953
    Aprecieri primite:
    1.094
    Here we are, another week on, the flangeways have been cleared and the rails are in use.

    Meanwhile down the line, the relay continues; five panels so far, three more to do next week.
     

    Fișiere atașate:

    ChurnetMan, jnc, Squiffy și încă o persoană apreciază asta.
  15. sleepermonster

    sleepermonster Member

    Înscris:
    19 Iun 2007
    Mesaje:
    953
    Aprecieri primite:
    1.094
    The relay is now up to seven panels and we have decided to pause there to be sure of completing the ballasting and other works elsewhere completed in time for the re-opening. Henry Ellison will be steamed tomorrow to operate the ballast trains.

    The boiler for Cathryn is due to return tomorrow, there are photographs of the completed boiler on our facebook sites.
     
    Vulcan Works, Johnme101 și jnc apreciază asta.
  16. Chris86

    Chris86 Well-Known Member

    Înscris:
    31 Oct 2011
    Mesaje:
    1.574
    Aprecieri primite:
    1.781
    Ocupație:
    Safety, technical and vehicle trainer
    Locație:
    South Yorkshire
    Heritage Railway Volunteer:
    No I do not currently volunteer
    This is fantastic news, the EVR are going to have a lovely line up.

    Chris
     
  17. ruddingtonrsh56

    ruddingtonrsh56 Well-Known Member

    Înscris:
    14 Sep 2009
    Mesaje:
    1.180
    Aprecieri primite:
    1.812
    Sex:
    Masculin
    Locație:
    Nottinghamshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Mainline Certified? I knew it had previously ran on the mainline but didn't realise it had a ticket for it at the moment
     
  18. sleepermonster

    sleepermonster Member

    Înscris:
    19 Iun 2007
    Mesaje:
    953
    Aprecieri primite:
    1.094
  19. sleepermonster

    sleepermonster Member

    Înscris:
    19 Iun 2007
    Mesaje:
    953
    Aprecieri primite:
    1.094
    Henry Ellison on ballast duties; and the boiler for Cathryn has returned from repair. Pictures by Richard Buckby
     
  20. Vulcan Works

    Vulcan Works Member

    Înscris:
    12 Apr 2018
    Mesaje:
    266
    Aprecieri primite:
    745
    Sex:
    Masculin
    Locație:
    England
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I love seeing pics of real work in progress on heritage railways, especially a steam loco on maintenance duties. A credit to the EVR.
     

Distribuie pagina asta