If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Lynton and Barnstaple - Operations and Development

الموضوع في 'Narrow Gauge Railways' بواسطة 50044 Exeter, بتاريخ ‏25 ديسمبر 2009.

  1. Mark Thompson

    Mark Thompson Well-Known Member

    إنضم إلينا في:
    ‏10 سبتمبر 2017
    المشاركات:
    1,591
    عدد المعجبين:
    3,934
    الجنس:
    ذكر
    مكان الإقامة:
    E sussex
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Is this a wind-up?
     
    ross, Small Prairie, H Cloutt و 1 شخص آخر معجبون بهذا.
  2. flying scotsman123

    flying scotsman123 Resident of Nat Pres

    إنضم إلينا في:
    ‏9 سبتمبر 2013
    المشاركات:
    10,674
    عدد المعجبين:
    18,698
    الجنس:
    ذكر
    مكان الإقامة:
    Cheltenham
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    That's the $64,000 question of our time! But there is certainly no need to respond or engage whatever it is.
     
    SpudUk و H Cloutt معجبون بهذا.
  3. The Dainton Banker

    The Dainton Banker Well-Known Member

    إنضم إلينا في:
    ‏20 جويلية 2014
    المشاركات:
    1,858
    عدد المعجبين:
    3,372
    الجنس:
    ذكر
    مكان الإقامة:
    Over the hills and far away
    Heritage Railway Volunteer:
    No I do not currently volunteer
    No - just lack of knowledge.
    I have PM'd you.
    Mike
     
    أعجب بهذه المشاركة H Cloutt
  4. City of truro fan

    City of truro fan Member

    إنضم إلينا في:
    ‏29 نوفمبر 2015
    المشاركات:
    795
    عدد المعجبين:
    90
    الجنس:
    أنثي
    مكان الإقامة:
    Honiton
    Heritage Railway Volunteer:
    No I do not currently volunteer
    As in the other direction for an extension. If the track is blocked going one way and no one will sell it to them. Is it able to go the other way wher the shed is now
     
  5. City of truro fan

    City of truro fan Member

    إنضم إلينا في:
    ‏29 نوفمبر 2015
    المشاركات:
    795
    عدد المعجبين:
    90
    الجنس:
    أنثي
    مكان الإقامة:
    Honiton
    Heritage Railway Volunteer:
    No I do not currently volunteer
    In another question how many coaches are there now and how many are being made right now extra being worked on?
     
  6. Mark Thompson

    Mark Thompson Well-Known Member

    إنضم إلينا في:
    ‏10 سبتمبر 2017
    المشاركات:
    1,591
    عدد المعجبين:
    3,934
    الجنس:
    ذكر
    مكان الإقامة:
    E sussex
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Hi. They've got 5 coaches now, and getting ready to build the next one. The large grey van is being worked on as well, but the lockdown has slowed up the work quite a bit.
    As for going the other way, they haven't got permission to yet. It will happen, but not for a long time, as there's so much to do already.
     
  7. City of truro fan

    City of truro fan Member

    إنضم إلينا في:
    ‏29 نوفمبر 2015
    المشاركات:
    795
    عدد المعجبين:
    90
    الجنس:
    أنثي
    مكان الإقامة:
    Honiton
    Heritage Railway Volunteer:
    No I do not currently volunteer
    This is good progress they are doing well. I hope the person will move athat stops them going further as the line at the moment needs to be longer
     
  8. Meatman

    Meatman Member

    إنضم إلينا في:
    ‏10 إبريل 2018
    المشاركات:
    696
    عدد المعجبين:
    1,645
    الجنس:
    ذكر
    مكان الإقامة:
    Burrington,devon
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    ive actually always thought this might have been the better option,move the 'works' to Killington lane end and push back to Lynton,theres probably much less resistance going that way but the main reason is looking at how people think,as i understand it,the main reason is to create a park and ride for Lynton because Lynton has limited parking facilities.If you start at Blackmoor gate you park and ride to Woody bay then you will probably have to get onto a shuttle bus to Lynton ,a four mile ride away,that may suit train enthusiasts,singles and couples but the majority of holiday makers are younger families so would you really bother to unload the family at Blackmoor,ride to Woody bay then take a bus to Lynton when it would be easier to just drive to Lynton.On the other hand if you start at Woody bay, the car park is already there and it would be a nice scenic run down to Lynton.once there, getting as close to the old station as possible the shuttle to the town centre would be a five minute journey and a lot less hassle if you've got a couple or three kids in tow.Of course,getting the railway to Lynton would require considerable works but the same can be said for going to Blackmoor
     
    أعجب بهذه المشاركة MellishR
  9. H Cloutt

    H Cloutt Well-Known Member

    إنضم إلينا في:
    ‏22 ديسمبر 2018
    المشاركات:
    1,024
    عدد المعجبين:
    1,498
    الجنس:
    ذكر
    مكان الإقامة:
    Battle
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I have read these recent comments with interest. I know that we are all keen to see the railway extended and are frustrated that this has not happened yet. However it would seem that there is a lot going on in the background at the moment. As I understand it the entire line is in the local plan which protects it from development other than the railway. Planning consent has been obtained for the line from Killington Lane to Blackmoor and on to Wislandpound and a TWAO application is in preperation. Looking at the map on the website there are a few portions of the route which are not yet in L&B ownership and I am sure that discussions are ongoing with the landowners. So a lot of time and expense has already been committed to this extension. There is no reason to suppose that the obstacles cannot be overcome. According to the L&B website this will be followed by the extension in the other direction.
    For those interested in the objections to the scheme - these are in the public domain on the planning portals of the appropriate local authorities - there is even a youtube video of a local news report which features comments from those objecting to the scheme.
    I think patience is needed a little longer.
     
    Miff, Jr1990, weltrol و 6 آخرون معجبون بهذا.
  10. Jr1990

    Jr1990 Guest

    Thanks Railwest for your reply
    Is it possible to see where the piece of trackbed is that the owner is refusing to sell? Is it easy to see on Google Earth perhaps or a map? Roughy how long is this stretch of trackbed?
    Also, is it possible that this can be compulsory purchased if it has to come to it?

    Thanks
     
  11. RailWest

    RailWest Part of the furniture

    إنضم إلينا في:
    ‏7 ديسمبر 2011
    المشاركات:
    3,984
    عدد المعجبين:
    7,800
    الجنس:
    ذكر
    مكان الإقامة:
    West Country
    Go to https://www.google.com/maps/d/viewe....102825&z=18&mid=1ait_38mDALZOXlxQGr3tIdXDUSQ and look at the two yellow sections at Parracombe. The northern one is the bungalow at the station, the southern one is the other land-owner.

    AIUI the ppossession of a TWAO - assuming that one is granted in due course - will allow the railway to apply for a CPO if it so wishes. That application then has to be determined by the relevant official body and may - or may not - be granted depending upon whether or not they think that it is justified.

    As you will appreciate this is a delicate situation and too much public discussion is best avoided please.
    :Morewaitingisrequired:
     
    andrewshimmin, Small Prairie, pmh_74 و 7 آخرون معجبون بهذا.
  12. H Cloutt

    H Cloutt Well-Known Member

    إنضم إلينا في:
    ‏22 ديسمبر 2018
    المشاركات:
    1,024
    عدد المعجبين:
    1,498
    الجنس:
    ذكر
    مكان الإقامة:
    Battle
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Exactly. Patience is needed a little longer
     
  13. robpalmer

    robpalmer New Member

    إنضم إلينا في:
    ‏8 جويلية 2008
    المشاركات:
    26
    عدد المعجبين:
    28
    I think that there is a big difference between a property acquired years ago when there was no reasonable expectation that a railway would be built at the bottom of the garden and one bought recently with the full knowledge that that would probably happen. In the former case the L&B might possibly be expected to make a mitigating provision, in the latter case (particularly when the estate agents details went out of their way to raise this issue) it is up to the buyer to accept the issue/problem and the price no doubt reflected that.
     
    أعجب بهذه المشاركة Jr1990
  14. Axe +1

    Axe +1 New Member

    إنضم إلينا في:
    ‏16 سبتمبر 2017
    المشاركات:
    192
    عدد المعجبين:
    761
    الوظيفة:
    Retired {Electronics Engineer}
    مكان الإقامة:
    Surrey
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Once again I have been requested by a member of the L&BR Board to ask you guys to kindly NOT mention compulsory purchases on this public forum on land needed by the Lynton & Barnstaple Railway. At this time it is not the railway's intention to pursue any procurements for the remaining land purchases using the forceful method you mention. Such comments may well be winding up those landowners who own the relevant properties.
     
    Last edited: ‏20 فبراير 2021
    Nick C, Kempenfelt 82e, Small Prairie و 17 آخرون معجبون بهذا.
  15. Mark Thompson

    Mark Thompson Well-Known Member

    إنضم إلينا في:
    ‏10 سبتمبر 2017
    المشاركات:
    1,591
    عدد المعجبين:
    3,934
    الجنس:
    ذكر
    مكان الإقامة:
    E sussex
    Heritage Railway Volunteer:
    No I do not currently volunteer
    In order to lighten the tone of the thread, I have just finished watching Tuesdays edition of "Architecture the Railways Built", and I've got to say I've not seen a better advertisement for our railway on terrestrial TV. Tim Dunn's sheer enthusiasm for his subject carries one along on a current.
    His love for the Lynton and Barnstaple, its history, folklore and future is very apparent, and it was a pleasure to watch his evangelism in action, not just at Woody Bay, but at Blackmoor and Chelfham as well. How well he conveyed its mystically magic spell. I wonder if he's a Trust member?
    If not, he deserves an honorary membership just for that presentation alone.
    Incidentally, I loved Tony Nicholson's remark about railway, that "It died young, and remained beautiful"
     
    Last edited: ‏20 فبراير 2021
    SpudUk, Greenway, AD29935 و 1 شخص آخر معجبون بهذا.
  16. DcB

    DcB Well-Known Member

    إنضم إلينا في:
    ‏5 جوان 2018
    المشاركات:
    1,487
    عدد المعجبين:
    455
    مكان الإقامة:
    Surrey
    Heritage Railway Volunteer:
    No I do not currently volunteer
    There is also Rob Bell's Walking lost railways s3 ep1, still on ch5 catch up, and the BBC 2 part documentary from 1985 still on Youtube.
     
  17. Jr1990

    Jr1990 Guest

    Thanks for the link, that’s really helpful. And apologies, as a newbie on here I didn’t realise there were rather delicate issues that were best not mentioned. So away from these, are there possibly any other areas of concern along the already acquired trackbed in getting the TWAO?
     
  18. RailWest

    RailWest Part of the furniture

    إنضم إلينا في:
    ‏7 ديسمبر 2011
    المشاركات:
    3,984
    عدد المعجبين:
    7,800
    الجنس:
    ذكر
    مكان الإقامة:
    West Country
    AIUI the basic purpose of a TWAO is simply to authorise the railway company to operate a public railway service, including the ability to cross over/under public highways. That decision will take into consideration factors such as the proposed design of the railway, bridges etc, the method of operation (eg signalling, safety procedures etc), conformance to required standards etc etc. AFAIK the fact that the railway may not yet own some parts of the proposed trackbed is not relevant (much in the same way that you can obtain planning permission to do something on land which you do not own), so such things per se should not be an obstacle to grant of TWAO. For example, there is still a gaping hole in Parracombe Bank which will need to be repaired, but the railway could obtain a TWAO long before that work is done on the basis of how it is proposed that the rebuilding will be done.
     
    Chris B و Jr1990 معجبون بهذا.
  19. Meiriongwril

    Meiriongwril Member

    إنضم إلينا في:
    ‏3 جوان 2007
    المشاركات:
    837
    عدد المعجبين:
    704
    الجنس:
    ذكر
    مكان الإقامة:
    Cymru
    Individual railway societies do not, of course, control the content of National Preservation (for which we must be thankful!). I feel it must be faced, therefore, that if the L&B does not acquire these unmentionable powers there will be no extension through Parracombe. The people concerned show no sign of changing their minds or moving and the daughter of the house seems as adamant as the parents. Above it was noted there is no by-pass possible of this stretch of trackbed. There also appears to have been problems at the Blackmoor end of the proposed extension too though, hopefully, these can be resolved. The prospect of decades to wait at Parracombe is daunting (if what was said above is true about the 'powers' not going to be sought/used). Maybe the Trust and Exmoor Associates should be looking more urgently at Bratton to Snapper via Chelfham - at least most (all?) or this is outside the national park ....
     
    Great Western, Jr1990 و MartinBall معجبون بهذا.
  20. RailWest

    RailWest Part of the furniture

    إنضم إلينا في:
    ‏7 ديسمبر 2011
    المشاركات:
    3,984
    عدد المعجبين:
    7,800
    الجنس:
    ذكر
    مكان الإقامة:
    West Country
    With respect, I would refer you back to Post No 3156.

    P
    lease give this particular topic a rest. Simply not mentioning things and/or people by specific names does not hide the subject of your comments from those 'in the know' . Too much public speculation, however well meant, may serve only to make the restoration of this lovely railway even more difficult than it is at the moment.
     
    Davo, ross, Small Prairie و 10 آخرون معجبون بهذا.

مشاركة هذه الصفحة