If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Llangollen Railway

Rasprava u 'Heritage Railways & Centres in the UK' pokrenuta od 14xx Lover, 4. Siječanj 2010..

  1. ghost

    ghost Part of the furniture

    Pridružen(a):
    29. Svibanj 2006.
    Poruka:
    4,303
    Lajkova:
    5,727
    Spol:
    Muškarac
    Grad:
    N.Ireland
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    It's already been stated that the travel benefits are provided by the trust to its members, the plc aren't involved at that level.
     
  2. DcB

    DcB Well-Known Member

    Pridružen(a):
    5. Lipanj 2018.
    Poruka:
    1,487
    Lajkova:
    455
    Grad:
    Surrey
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Does seem sad, could some of the money also be bank loans to setup the workshop?
     
  3. ChuffChuff

    ChuffChuff Member

    Pridružen(a):
    11. Rujan 2005.
    Poruka:
    378
    Lajkova:
    160
    Interesi:
    CEO
    Grad:
    South West
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I've resisted posting in this thread until emotions have settled. (Mine and others.)

    Llangollen seems to be caught in the middle. Not large enough to weather the storm (eg SVR, NYMR), but not small enough to be able to sit it out with minimal overheads (eg volunteer-based). They have the overheads of eg paid staff, but are not yet truly big-league. The contract business would - ideally - have been a cash producer in this difficult Covid time. In reality, the well discussed issues with the contract business put them on the back foot, and Covid has just knocked them over before they could recover.

    I'm not an expert, but there is a lot of mis-information (although well meaning) on this thread.

    To those saying the PLC has no assets: I suspect something had to be put up as collateral for any bank loan.
    Similarly, it's receivership, not administration, so the bank has assessed that the railway is not a viable concern that can keep going and pay off the debts. Any recovery will look different to the current railway.
    If you really want to give money, check carefully where it's going. If its the PLC, then you are giving it to the bank to give to a primary creditor.

    Difficult times. My heart goes out to all involved - but the employees and supplies who are financially impacted have more to lose than volunteers.

    Realistically, as enthusiast-based funding sources dry up, railways are only going to survive as businesses which attract income from primarily non-enthusiast audiences. I don't like it, but I think it's inevitable.
     
    ross, Gladiator 5076, osprey i 15 ostalih se sviđa ovo.
  4. Monkey Magic

    Monkey Magic Part of the furniture

    Pridružen(a):
    6. Siječanj 2018.
    Poruka:
    3,498
    Lajkova:
    6,845
    Grad:
    Here, there, everywhere
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I would suggest that there are two issues. To what extent are the problems of Llangollen structural and to what extent are they the result of poor management? Fundamentally, if it is the former then the outlook is bad, if it is the latter, and the things that underpin the line are sound, then there is no reason for the line not to survive and flourish under new management.

    Sometimes, good businesses suffer from bad management.
     
    The Dainton Banker, jnc i goldfish se sviđa ovo.
  5. 61624

    61624 Part of the furniture

    Pridružen(a):
    27. Rujan 2006.
    Poruka:
    5,294
    Lajkova:
    3,599
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I would imagine that, like most heritage railway workshops, they are equipped with machine tools retired and donated by local business, with relatively little resale value. If they have some more specialised railway-engineering equipment such as a wheel or journal lathe that might have more value, but as far as I know they don't.
     
    jnc se sviđa ovo.
  6. Sheff

    Sheff Resident of Nat Pres

    Pridružen(a):
    21. Travanj 2006.
    Poruka:
    8,057
    Lajkova:
    3,137
    Spol:
    Muškarac
    Interesi:
    Retired Engineer & Heritage Volunteer
    Grad:
    N Warks
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I’m no expert, but I imagine a learning point here might be the need to set up any operations servicing outside customers with concomitant liabilities as separate businesses. That way if it all goes wrong it can’t take the railway operation down with it?


    Sent from my iPad using Tapatalk
     
    andrewshimmin, 49010, ross i 10 ostalih se sviđa ovo.
  7. 35B

    35B Nat Pres stalwart

    Pridružen(a):
    18. Lipanj 2011.
    Poruka:
    28,732
    Lajkova:
    28,659
    Spol:
    Muškarac
    Grad:
    Grantham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    The catch there may be that such separation may undermine the ability of that business to secure capital to get going, or provide the necessary assurances that it can stand up to liabilities. It also presupposes that such an external business is started as a standalone, rather than developing organically.
     
  8. simon

    simon Resident of Nat Pres

    Pridružen(a):
    26. Lipanj 2006.
    Poruka:
    11,871
    Lajkova:
    5,553
    It would have been better as a subsidiary, yes. However the bank may have required a guarantee from the parent company which they would now presumably now be calling on.
     
  9. Mike S

    Mike S New Member

    Pridružen(a):
    9. Kolovoz 2016.
    Poruka:
    187
    Lajkova:
    825
    Spol:
    Muškarac
    Grad:
    .
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Probably not a popular observation but one I believe in... With any contract work someone is paying the bills, it is always wise with these sorts of jobs to properly check work being carried out before coughing up. That way any items not carried out to the standard required can be rectified before things get out of hand and before cold hard cash is handed over after which things get somewhat more tricky. It's rather easy to rattle the begging bowl and claim you've been hard done by but things are never quite that clear cut. Thorough project management is just as important as it is for a contractor to be working to the required standards, it is too easy to just 'trust'.

    If you were having a house built you'd be having a surveyor in at stages throughout the build, steam engines should be no different.
     
    burnettsj, Sheff, 30854 i 19 ostalih se sviđa ovo.
  10. Bikermike

    Bikermike Well-Known Member

    Pridružen(a):
    11. Ožujak 2020.
    Poruka:
    1,814
    Lajkova:
    2,045
    Spol:
    Muškarac
    Grad:
    Thameslink territory
    Heritage Railway Volunteer:
    No I do not currently volunteer
    This is the issue - you can do everything through SPVs (Special Purpose Vehicles - ie companies set up to do the thing) if you can get the funding. If you need the funding from a lender, then the lender will want security for their risk. If there's not enough security in the SPV, then to get the loan you end up having to give parent company guarantees. Unless you have assets to burn, any security is a risk.
     
    35B se sviđa ovo.
  11. class8mikado

    class8mikado Part of the furniture

    Pridružen(a):
    1. Lipanj 2009.
    Poruka:
    3,840
    Lajkova:
    1,644
    Interesi:
    Print Estimator/ Repository of Useless Informatio.
    Grad:
    Bingley W.Yorks.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Very Sad, all the effort going into the extension and then the Bridge repair potentially for naught

    Puts into perspective the trolls jumping up and down on the management for putting the 'wrong kind' of canopy at Corwen, are they happy now there is potentially no railway ?
     
  12. flying scotsman123

    flying scotsman123 Resident of Nat Pres

    Pridružen(a):
    9. Rujan 2013.
    Poruka:
    10,674
    Lajkova:
    18,699
    Spol:
    Muškarac
    Grad:
    Cheltenham
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I think that's a bit of an unnecessary dig - that issue is in no way related to the collapse as far as I can see. It seems to be largely accepted that it was that same management being jumped up and down on that got the railway in this mess to begin with.
     
    ross and DavidH like this.
  13. Bikermike

    Bikermike Well-Known Member

    Pridružen(a):
    11. Ožujak 2020.
    Poruka:
    1,814
    Lajkova:
    2,045
    Spol:
    Muškarac
    Grad:
    Thameslink territory
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Very much agreed.

    It worries me that a lot of preserved railways do well in a little sheltered niche, and put their heads into the world of non-volunteer/non-charity businesses and will expose themselves to forces that are much stronger than they appreciate. The Banks will enforce their covenants if payments are not kept up. The assets we cherish are of much lower value to the wider world, and costs go up very fast if you are outside the "cottage industry". I hope anyone complaining about things being done "on the cheap" or not "heritage" will allow for the need of the railways to cover this risk.

    An "ugly" canopy is not an existential threat to the railway. A receiver's appointment is.
     
    ChuffChuff, 30854 i jnc se sviđa ovo.
  14. RichardBrum

    RichardBrum Member

    Pridružen(a):
    16. Travanj 2019.
    Poruka:
    262
    Lajkova:
    335
    Spol:
    Muškarac
    Grad:
    Birmingham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    One issue is the distances involved between the owning groups & where the work is being done. That then ties into the availability of someone to go & check the work.

    From one projects public address to Llangollen is a 3hour+ round-trip.


    Maybe there will be more use of photo/video reporting for project stages.
     
  15. W.Williams

    W.Williams Well-Known Member

    Pridružen(a):
    20. Prosinac 2015.
    Poruka:
    1,650
    Lajkova:
    1,559
    Interesi:
    Mechanical Engineer
    Grad:
    Aberdeenshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Difficult news to read on the BBC this morning.

    We have all read speculation on here about the Engineering side of the business over the last year or two.

    This latest news is surely confirmation, if it were ever needed, that while locomotive repair and overhaul services can be an income generator for a line/organisation, they are not devoid of significant risks.

    Perhaps others will be looking on this salient event and asking how much risk their engineering operations present to the wider organisation?

    As is always the case, adept management and deep engineering competency are fundamentally important. If either is wanting....well....

    I have every confidence the railway will get through this and come out of the other side stronger for it.
     
    M59137, MattA, 30854 i 4 ostalih se sviđa ovo.
  16. Jamessquared

    Jamessquared Nat Pres stalwart

    Pridružen(a):
    8. Ožujak 2008.
    Poruka:
    27,793
    Lajkova:
    64,458
    Grad:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Surely that is known about up front though? If you contract out a project, you have to consider how you will exercise suitable oversight, and distance from home is one of the factors that might make you prefer one contractor over another. Contracting a job to a third party doesn’t absolve you of responsibility for the successful outcome, you just swap one set of necessary skills and costs for another.

    Tom
     
  17. Alan Kebby

    Alan Kebby Well-Known Member

    Pridružen(a):
    18. Rujan 2019.
    Poruka:
    1,192
    Lajkova:
    1,249
    Spol:
    Muškarac
    Grad:
    Brighton
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Exactly, it’s surely a complete non issue. If you are spending thousands and thousands of pounds contracting a company to do something for you, then the odd half day of your time to check on progress is nothing.
     
    Mike S se sviđa ovo.
  18. RichardBrum

    RichardBrum Member

    Pridružen(a):
    16. Travanj 2019.
    Poruka:
    262
    Lajkova:
    335
    Spol:
    Muškarac
    Grad:
    Birmingham
    Heritage Railway Volunteer:
    No I do not currently volunteer

    I think it potentially goes further than that.

    There's a conflict between the external/contract work & any urgent internal work;
    You have an external contract which takes up 6hours per day for 20 days/a month. (with the usual completion clauses etc)
    A loco owned/hosted by the railway that owns you fails in the season, & needs 3hours to fix. You choose to do the work, because you can catch up the contract work.
    What do you do if another one fails & needs 6hours work, say in week 2 of the contract?


    Internal work needs to be properly charged for. If there's a discount, does the price charged still cover all costs.


    Is there an expectation/assumption that the business will always make a profit distribution to the owning railway?
    The business should be retaining some for reinvestment, & there could be years when it doesn't make a profit.
     
    The Dainton Banker and Sheff like this.
  19. 35B

    35B Nat Pres stalwart

    Pridružen(a):
    18. Lipanj 2011.
    Poruka:
    28,732
    Lajkova:
    28,659
    Spol:
    Muškarac
    Grad:
    Grantham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I work in a business that applies activity based costing to work. It is demanding to set up, and requires a lot of effort to operate; I would never recommend it seriously for a cottage industry sized firm. None of which is to deny that understanding and controlling the interaction of internal and external activities is essential.
     
    andrewshimmin, jnc, estwdjhn i 2 ostalih se sviđa ovo.
  20. std tank

    std tank Part of the furniture

    Pridružen(a):
    20. Rujan 2005.
    Poruka:
    3,927
    Lajkova:
    1,070
    Spol:
    Muškarac
    Interesi:
    Retired
    Grad:
    Liverpool
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Yes, indeed!
     
    Last edited: 2. Ožujak 2021.

Podijelite ovu stranicu