If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Llangollen Railway

Тема в разделе 'Heritage Railways & Centres in the UK', создана пользователем 14xx Lover, 4 янв 2010.

  1. Alan Kebby

    Alan Kebby Well-Known Member

    Дата регистрации:
    18 сен 2019
    Сообщения:
    1.192
    Симпатии:
    1.249
    Пол:
    Мужской
    Адрес:
    Brighton
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Which locos are likely to be running the services on the reopened Llangollen Railway? Presumably the Trust owned locos will be involved - 7754, Jennifer and Austin 1. Are any more locos likely to leave such as 80072 and 3802, if there is reduced engineering capacity to overhaul them, or reduced funds available to pay their high fees? Or if the Trust makes a real go of it, maybe we’ll see other locos owners wanting to move to Llangollen.
     
  2. Jordan Leeds

    Jordan Leeds New Member

    Дата регистрации:
    10 фев 2018
    Сообщения:
    83
    Симпатии:
    66
    Пол:
    Мужской
    Адрес:
    lancashire/cheshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    80072 is out of service requiring overhaul,
     
  3. 61624

    61624 Part of the furniture

    Дата регистрации:
    27 сен 2006
    Сообщения:
    5.294
    Симпатии:
    3.599
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    80072 is out of traffic, so I think its future at the LR will depend on the financial situation of its owners and whether or not they get any good offers from elsewhere. 3802 will probably stay as it should get some decent mileage as the only working non-industrial. I would expect that Jennifer and Austin No. 1 will either be out on hire or sold (as rumoured for Jennifer) being of limited use on the LR and the pannier tank will be brought back to service as quickly as possible. Is 5532 still owned by an affiliated group, and is it likely to stay at the LR? If it does there should be plenty of work for it once it it is in running order.
     
  4. Pete Thornhill

    Pete Thornhill Resident of Nat Pres Staff Member Administrator Moderator Friend

    Дата регистрации:
    24 июл 2008
    Сообщения:
    7.762
    Симпатии:
    5.890
    3802 will be featuring for sure. It was having a washout yesterday and due to have its cold exam alongside Jennifer next week.

    Austin no1 due a steam test imminently prior to going out on hire.
     
    jnc нравится это.
  5. Sidmouth

    Sidmouth Resident of Nat Pres Staff Member Moderator

    Дата регистрации:
    12 сен 2005
    Сообщения:
    10.146
    Симпатии:
    9.775
    Пол:
    Мужской
    Адрес:
    Alderan !
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    7754 is not complete yet and needs £££ to finish it .
     
  6. Jamessquared

    Jamessquared Nat Pres stalwart

    Дата регистрации:
    8 мар 2008
    Сообщения:
    27.788
    Симпатии:
    64.441
    Адрес:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Out of curiosity, not being precisely familiar with how administration works: who would authorise that work? A boiler exam has a direct cost - would the administrator have to authorise that expenditure, or does the remaining management have a degree of autonomy in continuing with certain activities that cost money?

    Tom
     
  7. Pete Thornhill

    Pete Thornhill Resident of Nat Pres Staff Member Administrator Moderator Friend

    Дата регистрации:
    24 июл 2008
    Сообщения:
    7.762
    Симпатии:
    5.890
    I’m not sure, but, if they are trust owned locos such as the industrials and the trust are paying for it then I’d guess the fact the PLC has the administrators in is irrelevant.

    I would think possibly the same applies to 3802, although if that is the trust again or the owning group funding it - I don’t know.

    I suppose the reality is the PLC ceased to exist other than in name once the assets were sold off - Certainly there are no plans for a resurrection of LR PLC to trade again, the administration having no effect outside the PLC as also seen at Corwen with the work progressing there.
     
    jnc нравится это.
  8. Jamessquared

    Jamessquared Nat Pres stalwart

    Дата регистрации:
    8 мар 2008
    Сообщения:
    27.788
    Симпатии:
    64.441
    Адрес:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Doesn't that raise another question though, about the SMS? A boiler inspection is a function of the inspection regime set out in the railway's SMS - so if the plc is defunct, isn't the SMS also defunct? Seems an odd thing to do until the structural shape of whatever is the ongoing entity is clearer - or maybe I am missing something?

    Tom
     
    35B нравится это.
  9. flying scotsman123

    flying scotsman123 Resident of Nat Pres

    Дата регистрации:
    9 сен 2013
    Сообщения:
    10.673
    Симпатии:
    18.696
    Пол:
    Мужской
    Адрес:
    Cheltenham
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I'm no expert, but I'd have thought that while a SMS requires a boiler inspection, a boiler inspection doesn't necessarily require a SMS to be in place for it to be valid as part of a SMS at a later date, when one is formulated, as long as everything matches up?
     
    Wenlock, Aberdare, jnc и ещё 1-му нравится это.
  10. Jamessquared

    Jamessquared Nat Pres stalwart

    Дата регистрации:
    8 мар 2008
    Сообщения:
    27.788
    Симпатии:
    64.441
    Адрес:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Well, that is sort of at the heart of my question. The boiler inspector, and the boiler inspection itself, are on behalf of the insurer. So I just wonder what would happen if the new entity has a different insurer that didn't recognise the previous inspection?

    Hence my query - the loco can't run until there is a new operating entity with an SMS in place, so it feels to be putting the cart before the horse to carry out a boiler inspection until that new operating entity / structure is clear. Maybe it already is and I've missed it.

    Tom
     
    jnc нравится это.
  11. flying scotsman123

    flying scotsman123 Resident of Nat Pres

    Дата регистрации:
    9 сен 2013
    Сообщения:
    10.673
    Симпатии:
    18.696
    Пол:
    Мужской
    Адрес:
    Cheltenham
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I guess that was what I was driving at, is that a likely scenario, that the inspection is not accepted by a new insurer?
     
  12. Jamessquared

    Jamessquared Nat Pres stalwart

    Дата регистрации:
    8 мар 2008
    Сообщения:
    27.788
    Симпатии:
    64.441
    Адрес:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Possibly not. But since you can't run until the new structure is clear, it just feels premature to be doing things like boiler inspections, at least until teh outline is clear. Maybe I am just being cautious and seeing tasks sequentially that others might be happy to run in parallel.

    Tom
     
    jnc, 35B и flying scotsman123 нравится это.
  13. martin1656

    martin1656 Nat Pres stalwart Friend

    Дата регистрации:
    8 дек 2014
    Сообщения:
    19.260
    Симпатии:
    12.512
    Пол:
    Мужской
    Адрес:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    There is not that many boiler insurers that would insure a steam locomotive boiler, 2, or 3 at most I believe, and I would imagine that the standards of each would be very similar, i can't see another Ivor Situation, where by a loco is given a new bill of health, and later when examined by another inspector the very same boiler was condemned,
     
  14. Pete Thornhill

    Pete Thornhill Resident of Nat Pres Staff Member Administrator Moderator Friend

    Дата регистрации:
    24 июл 2008
    Сообщения:
    7.762
    Симпатии:
    5.890
    If there was a valid SMS previously and nothing has changed then would it be hard for the new operating company to adopt it? Especially when the people who will be involved were using the previous SMS, to do the same tasks. If the trust has access to the documentation etc then that could be possible.
     
    jnc нравится это.
  15. RA & FC

    RA & FC Well-Known Member

    Дата регистрации:
    4 окт 2007
    Сообщения:
    1.128
    Симпатии:
    415
    Пол:
    Мужской
    Адрес:
    Gogledd Cymru
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I imagine the insurance has always been in the name of the trust. They’ve still been paying a few grand a month for the cover. Same for utilities. Believe they’re in the trust name.
     
  16. JBTEvans

    JBTEvans Part of the furniture

    Дата регистрации:
    14 фев 2008
    Сообщения:
    2.597
    Симпатии:
    793
    Пол:
    Мужской
    Адрес:
    Casnewydd, De Cymru
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Why would it be premature to do boiler checks on an in ticket steam loco? Even if the Llangollen never ran again, 3802 will steam and haul passengers again. They need to know if she is fit for traffic or not. Even if they don't get the approved to operate, 3802 can go out on hire, earning cash. Isn't it an insurance requirement anyway?
     
    Alan Kebby и Wenlock нравится это.
  17. martin1656

    martin1656 Nat Pres stalwart Friend

    Дата регистрации:
    8 дек 2014
    Сообщения:
    19.260
    Симпатии:
    12.512
    Пол:
    Мужской
    Адрес:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Even if an loco is in ticket, it will still need an exam every 12 months, to pass the boiler as fit for use , for a further 12 months,
     
  18. Pete Thornhill

    Pete Thornhill Resident of Nat Pres Staff Member Administrator Moderator Friend

    Дата регистрации:
    24 июл 2008
    Сообщения:
    7.762
    Симпатии:
    5.890
    Only if you are going to use it, I remember 35027 finishing at the Bluebell and it then spent 4 years out of traffic before returning to traffic at Swanage, still on the original ticket. It may of changed now of course but that wasn’t subject to annual inspections between the stints, my thinking being that it should still be possible though as the inspector is only passing the boiler based on what he finds on the day of inspection.
     
    JBTEvans нравится это.
  19. Martin Perry

    Martin Perry Nat Pres stalwart Staff Member Moderator Friend

    Дата регистрации:
    15 апр 2006
    Сообщения:
    16.551
    Симпатии:
    7.897
    Адрес:
    1012 / 60158
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The 'owners' of 80072 are all Long term LR volunteers.
     
    JBTEvans нравится это.
  20. JBTEvans

    JBTEvans Part of the furniture

    Дата регистрации:
    14 фев 2008
    Сообщения:
    2.597
    Симпатии:
    793
    Пол:
    Мужской
    Адрес:
    Casnewydd, De Cymru
    Heritage Railway Volunteer:
    No I do not currently volunteer
    How come 35027 was out of traffic for 4 years?
     

Поделиться этой страницей