If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

BR Standard class 6 No. 72010 'Hengist' and Clan Discussion Thread

Discuție în 'Steam Traction' creată de Bulleid Pacific, 23 Noi 2009.

  1. Steve

    Steve Resident of Nat Pres Friend

    Înscris:
    7 Oct 2006
    Mesaje:
    12.729
    Aprecieri primite:
    11.847
    Ocupație:
    Gentleman of leisure, nowadays
    Locație:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I've seen several examples of new replacement boiler plate corroding faster than the old plate that they have been welded to. The only plausible explanation I have heard is that the older plates had more impurities in them (such as nitrogen) and these acted as a corrosion inhibiter. Modern steels have much better quality control.
     
    W.Williams apreciază asta.
  2. Bikermike

    Bikermike Well-Known Member

    Înscris:
    11 Mar 2020
    Mesaje:
    1.814
    Aprecieri primite:
    2.045
    Sex:
    Masculin
    Locație:
    Thameslink territory
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Is it corroding faster than the bit it replaced though?

    There will have been a reason that previous bit of boiler was replaced, and not the bit that wasn't replaced
     
  3. marshall5

    marshall5 Part of the furniture

    Înscris:
    26 Oct 2010
    Mesaje:
    2.521
    Aprecieri primite:
    4.359
    Locație:
    i.o.m
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I heard the same but in this case one of the main impurities in older steels mentioned was copper. It would be interesting to see some research into this.
    FWIW the Marshall engine I used to own is still running around with its original box and barrel and will be 100 next year - no patches or building up either. I can't see any engine with a modern steel box doing this.
    Ray.
     
    Last edited: 27 Mai 2021
  4. Sheff

    Sheff Resident of Nat Pres

    Înscris:
    21 Apr 2006
    Mesaje:
    8.057
    Aprecieri primite:
    3.137
    Sex:
    Masculin
    Ocupație:
    Retired Engineer & Heritage Volunteer
    Locație:
    N Warks
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I agree. Turning the question around, what might be the downside be from having a protective film between the faces? If none, slap it on.
     
    Steve, jnc și ghost apreciază asta.
  5. Flying Phil

    Flying Phil Part of the furniture

    Înscris:
    10 Dec 2018
    Mesaje:
    3.018
    Aprecieri primite:
    6.319
    Sex:
    Masculin
    Locație:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Although the surfaces may not have been coated with oil or grease when assembled I'm sure, in most engineering works, the parts would have had sufficient oil on them to prevent overnight rusting during manufacture. Unless the parts were degreased prior to assembly, by riveting or bolting, this layer would have provided good protection within tight, accurate, jointed faces.
     
  6. 242A1

    242A1 Well-Known Member

    Înscris:
    3 Dec 2006
    Mesaje:
    1.561
    Aprecieri primite:
    1.304
    When Tornado was having its middle cylinder rebored it was necessary to remove the front buffer beam assembly and rust was found between the components. "Wet Assembly" is common in the aviation industry and so this has been used for the assembly of frame plates and stretchers of 2007. It is all there in the construction section.
     
    Sunnieboy și Steve apreciază asta.
  7. Dag Bonnedal

    Dag Bonnedal New Member

    Înscris:
    28 Mar 2012
    Mesaje:
    184
    Aprecieri primite:
    317
    Sex:
    Masculin
    Locație:
    Stockholm, Sweden
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Having two "dry" surfaces joined together makes good environment for crevice corrosion.
    Of all the riveted joints I have seen (narrow gauge locos, carriages and wagons, 100-140years old) I have never seen dry surfaces. On carriages and wagons most often linseed oil was used, it dries and work well. On locomotives primer seems to have been the standard.
     
    Dave Williams și Sunnieboy apreciază asta.
  8. Sunnieboy

    Sunnieboy New Member

    Înscris:
    25 Feb 2012
    Mesaje:
    105
    Aprecieri primite:
    159
    Sex:
    Masculin
    Ocupație:
    Retired
    Locație:
    Swanage
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Different industry but exposed to the elements on structural steel we mated with wet paint to prevent corrosion. We also ground sharp edges as you can guarantee paint thickness on sharp corners.

    Sent from my SM-T820 using Tapatalk
     
  9. 242A1

    242A1 Well-Known Member

    Înscris:
    3 Dec 2006
    Mesaje:
    1.561
    Aprecieri primite:
    1.304
    Different industry; this is what matters.
    The two original locomotives of the Talyllyn Railway were rebuilt and restored in the 1950s and 60s. Talyllyn was rebuilt in 1957/58 by Gibbons Brothers. Dolgoch left the railway in the Summer of 1954 and did not return to Wharf Station until 1963. The engine went to Hunt Bros of Oldbury and it was stripped for inspection. The frames were found to be in a reasonable condition but the boiler was another matter; it was life expired. It was also observed that there were no intermediate frame stretchers. The original boiler was, in due course, sent to the Hunslet Engine Co. which in 1958 delivered a new boiler which was essentially a replica of the old one.
    When Talyllyn was rebuilt a new boiler was also supplied which incorporated the use of the original firebox. This boiler was not a faithful replica of the original. It was of welded construction and made no use of flanged plates. It was also 1" larger in diameter than the original.
    Both of the original locomotives have upward extensions of the motion brackets and these reach to the boiler. When Talyllyn was rebuilt the new boiler ended up resting on the upper corners of the motion brackets but was not secured to it. Dolgoch was moved to Gibbons Bros early in 1962. Gibbons found some brackets attached to the boiler and these were removed as being superfluous. They repeated the same mistake that had been made on No. 1.
    The two Fletcher, Jennings locomotives were built with the boilers as structural members of these engines. Those extended motion brackets fastened to brackets on the boilers. Both rebuilds suffered the consequences of inadequate frame stiffness.
    Gibbons Bros. had an engineering works but they were not a railway engineering works. Small details, in the event not so small, in truth very significant were outside the range of their experience. It took many years to get the two originals to a dependable and satisfactory state. This is not to be read as a criticism of Gibbons, these were very early preservation days but there are lessons here. Lack of attention to what an outsider sees as an insignificant detail can prove to be very costly.
     
    2392, Hirn, marshall5 și alți 4 apreciază asta.
  10. 30854

    30854 Resident of Nat Pres

    Înscris:
    8 Mar 2017
    Mesaje:
    12.172
    Aprecieri primite:
    11.496
    Sex:
    Masculin
    Ocupație:
    Retired
    Locație:
    Brighton&Hove
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Fascinating reading, which explains a fair amount of the 'issues' reported when both Fletcher Jennings locos returned from rebuilding, but ...

    Query: re:No.1. The actual firebox, or it's design? I've seen comments concerning the 'forlorn and rusty object which was Talyllyn' (i.e. between 1945-57) from several sources stating that the dangerous condition of the the loco's firebox was one of the more visible reasons it expired when it did.
     
  11. clinker

    clinker Member

    Înscris:
    8 Oct 2016
    Mesaje:
    612
    Aprecieri primite:
    372
    Sex:
    Masculin
    Locație:
    romford
    Heritage Railway Volunteer:
    No I do not currently volunteer


    Flipping the coin over,the last Marshall that I worked on was new in 1882 and within 8 years was just being used as a countershaft for a gas engine because the side of the firebox had rotted through.
     
  12. Hirn

    Hirn Member

    Înscris:
    11 Aug 2015
    Mesaje:
    512
    Aprecieri primite:
    320
    Sex:
    Masculin
    No. 1 hadt a bulge on the outside of the firebox finally which points to the stays, presumably if they broke rather than tore out of the copper the inner firebox may well have been reusable - and copper was particularly expensive after the war until the mid 1970s. L T C Rolt comments on its state as the Preservation Society found it in “Railway Adventure”.
     
    paullad1984 apreciază asta.
  13. ianh1

    ianh1 Member

    Înscris:
    10 Mai 2018
    Mesaje:
    230
    Aprecieri primite:
    719
    Sex:
    Masculin
    Locație:
    Cumbria
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    https://www.theclanproject.org/Clan_News.php

    This week you can get an idea of the full length of the engine as the frame extensions have been fitted. The dragbox will have to come out again as we're not happy with the fit against the rear face of the frame extensions. A light skim in the machine shop should do the job.

    Ian
     
    Sheff, 30854, jnc și alți 3 apreciază asta.
  14. Bikermike

    Bikermike Well-Known Member

    Înscris:
    11 Mar 2020
    Mesaje:
    1.814
    Aprecieri primite:
    2.045
    Sex:
    Masculin
    Locație:
    Thameslink territory
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Those extensions look a lot bigger when on.
    So when they are done is that the full extent of the frame?
     
    ross apreciază asta.
  15. ianh1

    ianh1 Member

    Înscris:
    10 Mai 2018
    Mesaje:
    230
    Aprecieri primite:
    719
    Sex:
    Masculin
    Locație:
    Cumbria
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    With regard to the debate around painting of jointing surfaces, this seems to be one of those engineering areas where there are conflicting views. If you think mechanical engineering has these debates, try working with software developers! A lot of developers view their code as their "art" and getting them to use standardised coding methods is an ongoing battle. I have the scars to prove it!

    We've taken a lot of advice and have talked to 3 ex Crewe works employees, one of which used to be an inspector. We also have access to the original Crewe works "Method of Frame and Cylinder Construction and Assembly - Crewe - Class 7 and 6 BR engines".

    Bikermike - almost! The hind beam still has to go on with the 2 rubbing plates so that will push it back another couple of inches. The central Intermediate Rubbing Block will probably add another 4"
     
    35B, northernsteam și jnc apreciază asta.
  16. 69530

    69530 New Member

    Înscris:
    20 Noi 2013
    Mesaje:
    60
    Aprecieri primite:
    75
    Sex:
    Masculin
    Many many thanks for these fascinating updates every one a learning curve for us "amateurs".
     
  17. 30854

    30854 Resident of Nat Pres

    Înscris:
    8 Mar 2017
    Mesaje:
    12.172
    Aprecieri primite:
    11.496
    Sex:
    Masculin
    Ocupație:
    Retired
    Locație:
    Brighton&Hove
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Concerning several aspects of this superb project, I'm getting the distinct impression the same applies to the "professionals" too. Quite how far our movement has come since those forlorn chalked messages on doomed (and not so doomed) locos, half a century ago, never ceases to amaze me.
     
    Sheff, 69530, jnc și încă o persoană apreciază asta.
  18. ianh1

    ianh1 Member

    Înscris:
    10 Mai 2018
    Mesaje:
    230
    Aprecieri primite:
    719
    Sex:
    Masculin
    Locație:
    Cumbria
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Yes, its definitely a leaning curve for us. Take for example today as I seem to learn something new every day. I've been puzzled by 70013 having a globe type oilbox for the pony truck (or trailing truck bolster)

    70013.jpg

    Whereas 71000 just has a cork plug in the plate

    71000.jpg

    I'm currently converting the 1951 instruction manual for BR Standard Locomotives into a Word document. We can then use this as the basis for 72010's instruction manual. The 71000 arrangement is the system described in the manual - so why was the oil box added to 70013?
     
    Bluenosejohn apreciază asta.
  19. Flying Phil

    Flying Phil Part of the furniture

    Înscris:
    10 Dec 2018
    Mesaje:
    3.018
    Aprecieri primite:
    6.319
    Sex:
    Masculin
    Locație:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Could the oil box have been added by a running shed to increase the amount of oil to the bearing - or reduce the number of times it had to be oiled?
    It is really interesting to see the steady growth of the engine with these regular updates.
     
    CH 19 apreciază asta.
  20. 30854

    30854 Resident of Nat Pres

    Înscris:
    8 Mar 2017
    Mesaje:
    12.172
    Aprecieri primite:
    11.496
    Sex:
    Masculin
    Ocupație:
    Retired
    Locație:
    Brighton&Hove
    Heritage Railway Volunteer:
    No I do not currently volunteer
    If so, from where did they obtain it? By the time of the 'standards', I couldn't imagine any new component being designed, manufactured and fitted without the OK from higher up.
     

Distribuie pagina asta