    I too am surprised at the possible price quoted.....the 567 project was fairly realistically priced at £500,000 - but may now be slightly over that with covid etc.
     
  2. flying scotsman123

    flying scotsman123 Resident of Nat Pres

    إنضم إلينا في:
    ‏9 سبتمبر 2013
    المشاركات:
    10,674
    عدد المعجبين:
    18,699
    الجنس:
    ذكر
    مكان الإقامة:
    Cheltenham
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    £7 million is roughly 2 P2s is it not? Seems a bit excessive. Is it a fairly complicated construction then, in the way that @Jamessquared has described LBSCR designs before?
     
  3. Paulthehitch

    Paulthehitch Well-Known Member

    إنضم إلينا في:
    ‏13 فبراير 2020
    المشاركات:
    1,090
    عدد المعجبين:
    1,093
    الجنس:
    ذكر
    مكان الإقامة:
    Hayling Island
    Heritage Railway Volunteer:
    Yes I am an active volunteer
     
  4. 2392

    2392 Well-Known Member

    إنضم إلينا في:
    ‏7 جوان 2010
    المشاركات:
    1,902
    عدد المعجبين:
    1,148
    الجنس:
    ذكر
    مكان الإقامة:
    Felling on Tyne
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Ok provided this project takes off. Which version of Ben Alder would the group go for. The as built original or rebuilt withdrawn version? Or perhaps a hybrid version that could be fitted with both types of boiler she ran with.
     
  5. ross

    ross Well-Known Member

    إنضم إلينا في:
    ‏18 ماي 2017
    المشاركات:
    1,002
    عدد المعجبين:
    2,477
    الجنس:
    ذكر
    مكان الإقامة:
    Titfield
    Heritage Railway Volunteer:
    No I do not currently volunteer
    If the group have no premises, machinery, etc, it could be that they are allowing for the significant start up costs. It could also be that they hope to pay professional wages for qualified professional team members, hope to employ apprenticeships etc, education facilities etc, all of which could help to justify that mad Scottish woman to pour out government largesse on a Scottish engine for Scotland banner.
    If the government coughs up 25% of the 7mil....
     
    northernsteam, Dunfanaghy Road و flying scotsman123 معجبون بهذا.
  6. 30854

    30854 Resident of Nat Pres

    إنضم إلينا في:
    ‏8 مارس 2017
    المشاركات:
    12,172
    عدد المعجبين:
    11,496
    الجنس:
    ذكر
    الوظيفة:
    Retired
    مكان الإقامة:
    Brighton&Hove
    Heritage Railway Volunteer:
    No I do not currently volunteer
    The only info I've currently got comes from that newspaper article.
    IIRC, it was the presence of components which BR decided rendered the original a "hybrid" which led to it's demise.

    I can't help but agree about the £7 million price tag. For that much, I'd have thought you could produce a 'Small Ben' and have enough change left over to make d3cent inroads into (say) a 'Barney Goods'.
     
  7. Jamessquared

    Jamessquared Nat Pres stalwart

    إنضم إلينا في:
    ‏8 مارس 2008
    المشاركات:
    27,793
    عدد المعجبين:
    64,460
    مكان الإقامة:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I'm somewhat surprised at the figure, not least because I can't find any indicative cost given on their website. I do wonder if it is the result of a garbled conversation with a journalist? ("How much do you think it will cost?" "Well, the A1 Trust will have spent £7m to build Tornado and Prince of Wales, so these things don't come cheap". [Journalist hears: £7m for one modest-sized Scottish loco].

    That may of course be complete whimsy ...

    FWIW, the projected cost for the Wainwright E is ~ £1.5m, and that is a more comparable beastie (modest sized, unsuperheated late Victorian / Edwardian 4-4-0 tender engine).

    That said, the method of assembly does have an impact on cost. For the major items - wheel centres, axles, tyres, cylinder castings, frame plates etc - you have a relatively small number of potential suppliers, and I doubt there is much difference to be had in those costs, like for like. But what does vary is what you do with them. Groups (such as the Patriot Group) that contract someone else's workshop to do all the erection and fitting of the component parts are paying considerably more for their loco than groups like Beachy Head or 82045 that are doing that assembly themselves. Which still doesn't quite answer the question of the price of Ben Alder, since at least according to the Scotsman article, their initial aim is to collect individual components, and the decision about how and where to carry out the actual build is still pending.

    Still, good luck to them. It would make an interesting comparison with the Drummond T9.

    Tom
     
    S.A.C. Martin, 2392, 30854 و 3 آخرون معجبون بهذا.
  8. steam_mad

    steam_mad Member

    إنضم إلينا في:
    ‏18 إبريل 2011
    المشاركات:
    683
    عدد المعجبين:
    1,493
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    They’ve clarified on social media that was indeed the case and a projected build cost of £1-1.25m is anticipated.
     
    andrewshimmin, S.A.C. Martin, Kje7812 و 4 آخرون معجبون بهذا.
  9. Bluenosejohn

    Bluenosejohn New Member

    إنضم إلينا في:
    ‏15 مارس 2017
    المشاركات:
    173
    عدد المعجبين:
    343
    الجنس:
    ذكر
    مكان الإقامة:
    Birmingham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    54398 Ben Adler had been put aside for preservation in 1953 but was scrapped in 1967 because it was not sufficiently in Highland Railway condition. The main issue seems to have been it had a Caledonian Railway standard goods boiler: a suggestion was made for it to obtain an LSWR M7 boiler as being closer to the original one but this came to nothing.

    The ironic thing is the locomotive lasted as long as it did because it was fitted with a Caledonian boiler. 16 of the class were so equipped between 1927 and 1930 and although one was withdrawn in 1939 the others lasted until at least 1944 and ten went on to be owned by British Railways. In contrast the four class members who kept a Highland boiler had gone by 1936.

    It would make for a more interesting livery debate than usual as in addition to Highland green livery the Highland Railway works at Lochgorm adopted the early LMS red with lining and large numbers with considerably more enthusiasm than some parts of the system did....

    ( a link to a page showing models painted in the red livery below)

    https://highlandmiscellany.com/tag/small-ben/
     
    andrewshimmin, 30854, bluetrain و 1 شخص آخر معجبون بهذا.
  10. bluetrain

    bluetrain Well-Known Member

    إنضم إلينا في:
    ‏3 مارس 2019
    المشاركات:
    1,561
    عدد المعجبين:
    1,584
    الجنس:
    ذكر
    مكان الإقامة:
    Wiltshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    It was a very hard-line purist decision to scrap Ben Alder as "not sufficiently in Highland Railway condition". The replacement Caledonian boiler involved only minor changes - a wider dome, relocation of safety valves from dome to firebox and removal of smokebox wing-plates. The preserved LSWR T9 underwent more substantial changes when it was rebuilt with a superheater plus extended smokebox (with stove-pipe chimney).

    https://railway-photography.smugmug.com/LMS-Scotland/-Peter-Drummond/Drummond-designs/i-89LsSHg

    A preserved Ben Alder would have been representative of all the Drummond family small 4-4-0s in their original non-superheated condition, a lineage that started with the NBR Abbotsford class of 1877.
     
    Last edited: ‏6 جوان 2021
    andrewshimmin, Richard Roper, Cartman و 6 آخرون معجبون بهذا.
  11. ruddingtonrsh56

    ruddingtonrsh56 Well-Known Member

    إنضم إلينا في:
    ‏14 سبتمبر 2009
    المشاركات:
    1,180
    عدد المعجبين:
    1,812
    الجنس:
    ذكر
    مكان الإقامة:
    Nottinghamshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Wasn't there far more of an attitude in the 60s of prioritising what was original? Green Arrow was deliberately marked as not having the monobloc cylinder arrangement replaced so that it would enter preservation as built, famously now the biggest issue with a potential return to steam. Now in the 21st century I think more rail enthusiasts (and all members of the public) would be happy with a small compromise as long as it looked and sounded about right and was able to pull trains full of fare paying passengers!
     
    The Dainton Banker, jnc, Cartman و 4 آخرون معجبون بهذا.
  12. marshall5

    marshall5 Part of the furniture

    إنضم إلينا في:
    ‏26 اكتوبر 2010
    المشاركات:
    2,521
    عدد المعجبين:
    4,359
    مكان الإقامة:
    i.o.m
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    When John Scholes drew up the list of candidates for preservation none were expected to ever run again so originality and 'first of the class' were more important factors than condition. If you think about it there were far better Crabs than 42700 and 70000 was going to be saved for the nation despite its poor condition rather than 70013 which was a later substitution.
    Ray.
     
    andrewshimmin, jnc, Richard Roper و 1 شخص آخر معجبون بهذا.
  13. northernsteam

    northernsteam Member

    إنضم إلينا في:
    ‏25 ماي 2010
    المشاركات:
    609
    عدد المعجبين:
    297
    الجنس:
    ذكر
    الوظيفة:
    Used to be in civil engineering, highway bridges.
    مكان الإقامة:
    Tyne and Wear
    Heritage Railway Volunteer:
    No I do not currently volunteer
    ..which was the original thinking behind the Clan Project. A useful locomotive from new with modern engineering techniques and everything certified. Though originally it was not destined for the main-line. I wish the Patriot project well in the future.
     
    أعجب بهذه المشاركة jnc
  14. Bikermike

    Bikermike Well-Known Member

    إنضم إلينا في:
    ‏11 مارس 2020
    المشاركات:
    1,814
    عدد المعجبين:
    2,045
    الجنس:
    ذكر
    مكان الإقامة:
    Thameslink territory
    Heritage Railway Volunteer:
    No I do not currently volunteer
    https://www.holdenf5.co.uk/news/

    "GER 789’s frames have been hot riveted together, the machined cylinders have been installed, the smokebox and footplate have been installed pending riveting plus four new buffers have been bolted to the frames"

    Interesting they are not following the P2/Clan driven bolts approach
     
    clinker و jnc معجبون بهذا.
  15. Dunfanaghy Road

    Dunfanaghy Road Well-Known Member

    إنضم إلينا في:
    ‏9 اكتوبر 2019
    المشاركات:
    1,401
    عدد المعجبين:
    1,772
    الجنس:
    ذكر
    الوظيفة:
    Retired
    مكان الإقامة:
    Alton, Hants
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I feel that nowadays there is a prejudice against hot rivetting.
    Obviously correct, with the number of ships, locomotives and bridges falling apart :rolleyes: (Perhaps they should have used fitted bolts to build the Forth Rail Bridge?)
    Pat
     
  16. std tank

    std tank Part of the furniture

    إنضم إلينا في:
    ‏20 سبتمبر 2005
    المشاركات:
    3,927
    عدد المعجبين:
    1,070
    الجنس:
    ذكر
    الوظيفة:
    Retired
    مكان الإقامة:
    Liverpool
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The Forth Bridge has to flex with the wind, whereas a motion bracket has to stay in its position on the frames as shown on the drawing.
     
    2392 و Sheff معجبون بهذا.
  17. Bikermike

    Bikermike Well-Known Member

    إنضم إلينا في:
    ‏11 مارس 2020
    المشاركات:
    1,814
    عدد المعجبين:
    2,045
    الجنس:
    ذكر
    مكان الإقامة:
    Thameslink territory
    Heritage Railway Volunteer:
    No I do not currently volunteer
    There are still some hot rivets on the clan, so I don't think it's a conspiracy, but a new technique that gives advantages and disadvantages.

    It seems that a lot of things in new-build are coalescing to "standard practice", so it's interesting when someone does something different.

    Not all Victorian engineering was a complete success, but we only ever see the ones that worked.
     
    أعجب بهذه المشاركة jnc
  18. northernsteam

    northernsteam Member

    إنضم إلينا في:
    ‏25 ماي 2010
    المشاركات:
    609
    عدد المعجبين:
    297
    الجنس:
    ذكر
    الوظيفة:
    Used to be in civil engineering, highway bridges.
    مكان الإقامة:
    Tyne and Wear
    Heritage Railway Volunteer:
    No I do not currently volunteer
    According to 'Design Section of their website, the main reason with the Clan was that they 'were advised the expertise for cold riveting would be hard to find nowadays.'
    The skills for riveting are much more than those for bolting, even with fitted bolts, so the decision was taken. It has been shown that some areas are not suitable for bolts and so these have been hot rivetted.
    Perhaps this group have a tame rivetter in their midst? Ah yes, I see it is at Tyseley, where they can anything perhaps.
     
    Last edited: ‏5 جويلية 2021
  19. Dunfanaghy Road

    Dunfanaghy Road Well-Known Member

    إنضم إلينا في:
    ‏9 اكتوبر 2019
    المشاركات:
    1,401
    عدد المعجبين:
    1,772
    الجنس:
    ذكر
    الوظيفة:
    Retired
    مكان الإقامة:
    Alton, Hants
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I understand that BR tenders were cold rivetted. I can't understand what advantage that confers over hot rivetting (and I'm not alone in that.) Was it one of those Regional things carried over to the Standards by farming out the design work all over the country?
    (As an aside, how do get enough ooomph on a cold rivet, it isn't exactly a doddle with a white-hot one?)
    Pat
     
  20. std tank

    std tank Part of the furniture

    إنضم إلينا في:
    ‏20 سبتمبر 2005
    المشاركات:
    3,927
    عدد المعجبين:
    1,070
    الجنس:
    ذكر
    الوظيفة:
    Retired
    مكان الإقامة:
    Liverpool
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Not just BR tenders. Stanier tenders were cold riveted, as well. Cold rivets are machined to a couple of thou bigger than the hole diameter, hammered in and then closed over using a rather large,unwieldy, hydraulic riveting tool. There are still one or two of these riveting tools about. The Avon Valley Railway certainly have one.
     