    I thought it lasted into the 90s - I remember a trip being advertised after privatisation with 31s which then got cancelled.
     
    Martin Perry se sviđa ovo.
  2. ilvaporista

    ilvaporista Part of the furniture

    Pridružen(a):
    16. Siječanj 2006.
    Poruka:
    4,356
    Lajkova:
    5,455
    Spol:
    Muškarac
    Interesi:
    C.Eng
    Grad:
    On the 45th!
    The last movement over the crossings I know of was a visit by a weed killing train in April(?) 1993. There was talk of further movements but so far as I know no other loco used the crossing
     
    Martin Perry se sviđa ovo.
  3. Vulcan Works

    Vulcan Works Member

    Pridružen(a):
    12. Travanj 2018.
    Poruka:
    266
    Lajkova:
    745
    Spol:
    Muškarac
    Grad:
    England
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I’ve always thought Britannia Bridge is a pragmatic and perfectly workable solution and it shows what can be achieved when a Highway Authority is (eventually) on board.

    There’s no such thing as starting discussions too early in my experience, but the initial pitch is crucial as is understanding the legislation they operate under and pre-empting their questions and concerns.

    It sounds like the Oswestry team is already making good strides with stakeholders. As we know from examples on other railways, there are some impressive solutions being progressed that in the past would have been deemed too complex or expensive to undertake. A couple of A roads are a big barrier but not an impossible barrier!
     
    jnc and echap like this.
  4. ilvaporista

    ilvaporista Part of the furniture

    Pridružen(a):
    16. Siječanj 2006.
    Poruka:
    4,356
    Lajkova:
    5,455
    Spol:
    Muškarac
    Interesi:
    C.Eng
    Grad:
    On the 45th!
    Thanks to CHR Facebook here is the new arrival waiting to be unloaded.
    200901040_4013402868713223_6377488022281360562_n.jpg
     
    Martin Perry, brmp201, jnc i 1 drugoj osobi se sviđa ovo.
  5. MellishR

    MellishR Resident of Nat Pres Friend

    Pridružen(a):
    16. Travanj 2009.
    Poruka:
    8,912
    Lajkova:
    5,849
    Thanks for asking. I was wondering myself, when watching a video of a train crossing there soon after reading the latest about the WSR's level crossing business.
    Edit: minor corrections
     
  6. ilvaporista

    ilvaporista Part of the furniture

    Pridružen(a):
    16. Siječanj 2006.
    Poruka:
    4,356
    Lajkova:
    5,455
    Spol:
    Muškarac
    Interesi:
    C.Eng
    Grad:
    On the 45th!
    The A5 has long been identified as a route that needs to be upgraded. There are long term plans to dual the section where the level crossing is and at that point a bridge should be installed.
    The A483 as a feeder road would also be upgraded and again a bridge over the railway should be possible as part of the improvements. As mentioned to have everyone onside and involved early is key. CHR is working very hard behind the scenes with all stakeholders to make sure that when the time comes the railway is an integral part of the plan and not something that comes out of the woodwork at the last minute.
     
    jnc, Paul42, 30854 i 2 ostalih se sviđa ovo.
  7. Martin Perry

    Martin Perry Nat Pres stalwart Staff Member Moderator Friend

    Pridružen(a):
    15. Travanj 2006.
    Poruka:
    16,551
    Lajkova:
    7,897
    Grad:
    1012 / 60158
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    It would be good if that happens but I would anticipate a lot of resistance from the road building side; the terrain is pretty flat at both crossings and it would need big embankments to cross the railways ...
     
    jnc se sviđa ovo.
  8. Thompson1706

    Thompson1706 Part of the furniture

    Pridružen(a):
    19. Studeni 2007.
    Poruka:
    2,524
    Lajkova:
    1,886
    Spol:
    Muškarac
    Interesi:
    Retired
    Grad:
    Rhiwabon
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    From a safety point of view a bridge over the railway one hundred yards or so before a roundabout could lead to problems with northbound traffic, given the density and speed of the traffic.

    Bob.
     
    jnc and Martin Perry like this.
  9. 61624

    61624 Part of the furniture

    Pridružen(a):
    27. Rujan 2006.
    Poruka:
    5,294
    Lajkova:
    3,599
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Could a "half and half" solution of low bridge/shallow cutting be an answer? Material from the cutting could be used for embankments.
     
  10. 30854

    30854 Resident of Nat Pres

    Pridružen(a):
    8. Ožujak 2017.
    Poruka:
    12,172
    Lajkova:
    11,496
    Spol:
    Muškarac
    Interesi:
    Retired
    Grad:
    Brighton&Hove
    Heritage Railway Volunteer:
    No I do not currently volunteer
    A sensible soumding suggestion, but one that would depend on the height of the water table and any likihood of flooding in the immediate area. I've no feeling for how the costs of a cutting / embankment might compare with those of a road embankment only.
     
    jnc se sviđa ovo.
  11. Martin Perry

    Martin Perry Nat Pres stalwart Staff Member Moderator Friend

    Pridružen(a):
    15. Travanj 2006.
    Poruka:
    16,551
    Lajkova:
    7,897
    Grad:
    1012 / 60158
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The A5 crossing would possibly be better achieved by a ‘Rail over’ bridge but the A 483 is made more complex by the proximity to Weston Wharf.


    Sent from my iPhone using Tapatalk
     
    black5 se sviđa ovo.
  12. 30854

    30854 Resident of Nat Pres

    Pridružen(a):
    8. Ožujak 2017.
    Poruka:
    12,172
    Lajkova:
    11,496
    Spol:
    Muškarac
    Interesi:
    Retired
    Grad:
    Brighton&Hove
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Which begs the question, what is the ruling gradient on the entirity of the route CHR have their sights set on? Any significant increase would obviously affect decisions surrounding future operations.
     
  13. daveb

    daveb Member

    Pridružen(a):
    5. Rujan 2005.
    Poruka:
    945
    Lajkova:
    484
    Spol:
    Muškarac
    Grad:
    Wimborne, Dorset
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I suppose it depends on what any A5 upgrade would involve. If the plan is to duel the road (as has happened elsewhere, e.g. the Nesscliffe bypass section), it would make sense to build proper junctions, with the A5 on a flyover and the roundabout beneath. If this were to happen here, the A5 could be raised to a height to clear the railway and stay at that height to clear the roundabout too. There should be room to build the slip roads between the railway bridge and the roundabout.
     
    jnc, echap i black5 se sviđa ovo.
  14. hoffman

    hoffman New Member

    Pridružen(a):
    7. Kolovoz 2016.
    Poruka:
    52
    Lajkova:
    53
    Spol:
    Muškarac
    Grad:
    Suffolk
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Traffic getting that close to a roundabout should already be preparing to slow down. A small reduction in the speed limit might help too.
     
  15. Martin Perry

    Martin Perry Nat Pres stalwart Staff Member Moderator Friend

    Pridružen(a):
    15. Travanj 2006.
    Poruka:
    16,551
    Lajkova:
    7,897
    Grad:
    1012 / 60158
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The Nesscliff bypass roundabouts do not have any flyover sections.
     
    35B se sviđa ovo.
  16. Martin Perry

    Martin Perry Nat Pres stalwart Staff Member Moderator Friend

    Pridružen(a):
    15. Travanj 2006.
    Poruka:
    16,551
    Lajkova:
    7,897
    Grad:
    1012 / 60158
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Not sure - perhaps @ilvaporista can advise? I don't think there is much significant until after Llynclys?
     
  17. Jamessquared

    Jamessquared Nat Pres stalwart

    Pridružen(a):
    8. Ožujak 2008.
    Poruka:
    27,798
    Lajkova:
    64,476
    Grad:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    30854 and Martin Perry like this.
  18. Ploughman

    Ploughman Part of the furniture

    Pridružen(a):
    1. Travanj 2008.
    Poruka:
    5,969
    Lajkova:
    2,761
    Interesi:
    Ex a lot of things.
    Grad:
    Near where the 3 Ridings meet
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    What would be the expected clearance lf Rail was under the Road?
    Network rail policy is to go for maximum clearance no matter what the prospect of needing it is.
     
  19. 35B

    35B Nat Pres stalwart

    Pridružen(a):
    18. Lipanj 2011.
    Poruka:
    28,733
    Lajkova:
    28,661
    Spol:
    Muškarac
    Grad:
    Grantham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    As is being used at Leighton Buzzard?
     
  20. 30854

    30854 Resident of Nat Pres

    Pridružen(a):
    8. Ožujak 2017.
    Poruka:
    12,172
    Lajkova:
    11,496
    Spol:
    Muškarac
    Interesi:
    Retired
    Grad:
    Brighton&Hove
    Heritage Railway Volunteer:
    No I do not currently volunteer
    And as was also done constructing the early stages of the Dduallt spiral.
     