    That's definitely not subjective, then. Were the castings MPI'd when first cast, though I would have thought that would have been routine? Definitely not good.
     
  2. W.Williams

    W.Williams Well-Known Member

    Дата регистрации:
    20 дек 2015
    Сообщения:
    1.650
    Симпатии:
    1.559
    Род занятий:
    Mechanical Engineer
    Адрес:
    Aberdeenshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    A passed NDT cert is often a requirement for payment in the terms of business within industry.

    What is very positive is that all parties are collaborating to understand and move forwards.
     
    Steve, ghost, jnc и 2 другим нравится это.
  3. Phill S

    Phill S New Member

    Дата регистрации:
    23 фев 2015
    Сообщения:
    144
    Симпатии:
    114
    Пол:
    Мужской
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Is it possible that the cracking was caused by incorrect assembly/disassembly methods, possibly in conjunction with incorrect interference fits?
     
  4. Bikermike

    Bikermike Well-Known Member

    Дата регистрации:
    11 мар 2020
    Сообщения:
    1.814
    Симпатии:
    2.045
    Пол:
    Мужской
    Адрес:
    Thameslink territory
    Heritage Railway Volunteer:
    No I do not currently volunteer
    That will depend on the nature and location of the cracking presumably...
    On the assumption that all 6 failed in the same way, it has to be a process common to them all - ie you can ignore any crank axle-specific procedures
    (that is a big assumption, we had one building that leaked - arguments raged whose fault and why, but all parties assumed it was a consistent fault. We took 6 panels off and all had failed in different ways...)
     
    jnc нравится это.
  5. marshall5

    marshall5 Part of the furniture

    Дата регистрации:
    26 окт 2010
    Сообщения:
    2.521
    Симпатии:
    4.359
    Адрес:
    i.o.m
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    As Mike says we don't know the nature or location of the cracks and we don't know the severity of them. If they are relatively minor would they be acceptable for running at 25mph on a heritage railway even if not acceptable for the main line?
    Ray.
     
  6. Davo

    Davo Well-Known Member

    Дата регистрации:
    12 окт 2018
    Сообщения:
    1.539
    Симпатии:
    649
    Пол:
    Мужской
    Адрес:
    W yorkshire 56f
    Heritage Railway Volunteer:
    No I do not currently volunteer
    But I thought the whole aim of building the 5XP 5551 Unknown warrior is that the LMS Patriot project founder members and designers and admin intended for it to be built for mainline and heritage railway usage that's why the engineers and volunteers are going through every component or bit of metal constructed like a fine tooth comb so Ricardo rail can sign the parts off in question after design and fitting deemed safe so the 5551 loco is a fit to run both mainline and heritage lines, but unfortunately this mechanical flaw from the driver wheels has cost the LMS Pat team dearly this time besides the bogie frames valve rods, and repositioned key ways all been refitted on the wheels, To discover the wheels are cracked, on the up side of things on the pat loco the wheel pans previously took a year to cast all 6 but the only prob this time is the funds could have to be raised for the boro foundry to recast them, so are members this time round going to be not put off by the chain of discoveries and dig deep again for the wheelpans to be recast under expert foundrymen and engineers so the wheelpans don't have air bubbles or airline cracking after the molten steel has been poured in the sand boxes and left to cool down very steadily, point is this time round how many more years are we to wait to see the finished 5551 5XP U.W. 2024 maybe? So yet again good luck at their next A.G.M. 31 July
    Davo 56F
     
  7. Davo

    Davo Well-Known Member

    Дата регистрации:
    12 окт 2018
    Сообщения:
    1.539
    Симпатии:
    649
    Пол:
    Мужской
    Адрес:
    W yorkshire 56f
    Heritage Railway Volunteer:
    No I do not currently volunteer
    How much does 1 6.9 driver wheel cost anyway in a foundry to cast what I'm trying to work out is how much did all 6 driver wheels cost to be cast at boro foundry and before machining anyone?
     
  8. Richard Roper

    Richard Roper Well-Known Member

    Дата регистрации:
    22 май 2006
    Сообщения:
    1.310
    Симпатии:
    1.359
    Пол:
    Мужской
    Род занятий:
    Librarian
    Адрес:
    Just up the road from 56E Sowerby Bridge
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Just seen this on the G5 Locomotive Company website. I hope they don't mind me quoting... My bold highlight.

    "The two trailing wheels and tyres have been collected from the unit and shipped to SDR for final assembly. However, when they were received a problem came to light with the manufacturing of one of the wheels. Thankfully, Boro' Foundry offered to manufacture another one free of charge; many thanks to them. We dug out the original pattern, gave it a fresh coat of paint and shipped that to them."

    Hopefully a work-round can be achieved with our own wheelsets. Fingers crossed.

    Richard.
     
    Last edited: 8 июл 2021
    LMS2968 нравится это.
  9. Jamessquared

    Jamessquared Nat Pres stalwart

    Дата регистрации:
    8 мар 2008
    Сообщения:
    27.798
    Симпатии:
    64.475
    Адрес:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I think what is surprising me in this saga is less that there are problems - such things occur from time to time, and if making a large casting were easy, everyone would be doing it - but that the issues weren't identified at the time of casting. One wonders what the acceptance criteria were at the time?

    Tom
     
    andrewshimmin, Davo, MellishR и 6 другим нравится это.
  10. 2392

    2392 Well-Known Member

    Дата регистрации:
    7 июн 2010
    Сообщения:
    1.902
    Симпатии:
    1.148
    Пол:
    Мужской
    Адрес:
    Felling on Tyne
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I can but echo and agree with Tom. As it highlights IMO a lack of Quality Control..... These issues are as old [and older] as the railways themselves. As an example there is a railway myth that the Stephenson's sabotaged Hackworth's San Pareil when they supplied the subcontracted and defective as it turned out cylinders [which were made at short notice]. When the replica was constructed it took Crewe works 8-10 goes at making a perfect pair 150 years later.......
     
    Davo, jnc, LMS2968 и ещё 1-му нравится это.
  11. LMS2968

    LMS2968 Part of the furniture

    Дата регистрации:
    1 сен 2006
    Сообщения:
    3.072
    Симпатии:
    5.361
    Пол:
    Мужской
    Род занятий:
    Lecturer retired: Archivist of Stanier Mogul Fund
    Адрес:
    Wigan
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I believe that Robert Stephenson's cast six cylinders and rejected four of them, but believed the final pair were good. In practice, they made little or no difference to the Trials. The problem was the boiler, not built by RS&Co, which leaked like a sieve. John Dixon wrote, "He (Timothy Hackworth) has to feed her more more meal and malt sprouts than would fatten a pig," this being the then current way to plug minor boiler leaks. Hackworth's over enthusiastic use of the blastpipe coupled with a large diameter flue also had the effect of distributing the fire all over the landscape.

    Sorry, major thread drift there!
     
    andrewshimmin, MellishR, Greenway и 3 другим нравится это.
  12. osprey

    osprey Resident of Nat Pres

    Дата регистрации:
    3 окт 2007
    Сообщения:
    10.494
    Симпатии:
    2.855
    Род занятий:
    semi-retired, currently doing R&D for my patents
    Адрес:
    Halifax
    Not to worry...interesting info....
     
    2392 нравится это.
  13. 2392

    2392 Well-Known Member

    Дата регистрации:
    7 июн 2010
    Сообщения:
    1.902
    Симпатии:
    1.148
    Пол:
    Мужской
    Адрес:
    Felling on Tyne
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Indeed I was using Hackworth's misfortune as an example of the pitfalls of the foundry process and it being as old as the business itself.......
     
  14. Richard Roper

    Richard Roper Well-Known Member

    Дата регистрации:
    22 май 2006
    Сообщения:
    1.310
    Симпатии:
    1.359
    Пол:
    Мужской
    Род занятий:
    Librarian
    Адрес:
    Just up the road from 56E Sowerby Bridge
    Heritage Railway Volunteer:
    No I do not currently volunteer
    This will definitely be a relic of the previous (first) project management team - so it fits in with the other items which have had to be re-made. The project has moved on now in terms of project management, so fingers crossed this will be the last spanner in the works, albeit a bloody big one.

    Richard.
     
    Great Western, MellishR, jnc и ещё 1-му нравится это.
  15. 30854

    30854 Resident of Nat Pres

    Дата регистрации:
    8 мар 2017
    Сообщения:
    12.172
    Симпатии:
    11.496
    Пол:
    Мужской
    Род занятий:
    Retired
    Адрес:
    Brighton&Hove
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I'd imagine several involved with the 'Clan Project' must breathe the occasional sigh of relief that 72010 benefitted from a new, infininitely more professional approach, rather earlier in the build process than the Patriot.

    Though certain the new team will recover from the many setbacks The Unknown Warrior has faced, were it a marine project, I might suggest, just to be on the safe side, they shoot an albatross to improve their luck.

    More seriously, though the point has been made concerning historic attitudes to the acceptability (or otherwise) of manufacturing flaws. Of interest, are there any remaining steel casting jobs in modern industry remotely comparable to large diameter, spoked wheel centres, for use in such harsh and rapidly variable operating conditions?
     
    MellishR, jnc и Richard Roper нравится это.
  16. class8mikado

    class8mikado Part of the furniture

    Дата регистрации:
    1 июн 2009
    Сообщения:
    3.840
    Симпатии:
    1.644
    Род занятий:
    Print Estimator/ Repository of Useless Informatio.
    Адрес:
    Bingley W.Yorks.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    A casual observation Im sure but the advances in moulding production methods don't seem to have made this process ( castings) any more reliable... or is it that the experience in producing them, especially large one offs, just isn't there anymore. As a 'lay' member of the Clan project i have often queried the use of Large Castings - exactly as per the original spec. when full or part fabrications might have been used. Castings have always been decided upon but its almost expected that they will not be perfect and that problems even if minor ones will be discovered either by the inspection tests or sometimes during finishing and require some corrective action. Sometimes this has been possible at the machining stage, some have just had to be redone...
     
    Last edited: 8 июл 2021
    30854, MellishR, jnc и 2 другим нравится это.
  17. andalfi1

    andalfi1 Well-Known Member

    Дата регистрации:
    5 ноя 2008
    Сообщения:
    1.007
    Симпатии:
    466
    Пол:
    Мужской
    Род занятий:
    Semi Retired.
    Адрес:
    Haworth
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Described as "Serious Widespread cracking" strongly suggesting 'not localised' as it would be, if it was caused as you describe above.
     
    jnc и Richard Roper нравится это.
  18. Steve

    Steve Resident of Nat Pres Friend

    Дата регистрации:
    7 окт 2006
    Сообщения:
    12.732
    Симпатии:
    11.848
    Род занятий:
    Gentleman of leisure, nowadays
    Адрес:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I don't know the details of the problems with the wheels but it was quite common for cast spoked wheels to crack on cooling down. In Victorian times, for this reason, it was quite common to split the rims into halves or even quarters to reduce the build up of stresses. Metal blocks or keys about 1-2" wide were then fitted to fill the gaps. Once the tyre was shrunk on, this would hold everything in place. If the job was well done, these keys would not be noticeable. When the wheel tyres on the VCT's MW1210 Sir Berkeley were replaced some years ago the contractor was quite concerned when he phoned me to say the wheels had fallen to bits when the tyres were removed. Suffice to say that I told him to put all the bits back in position and fit the new tyres. All is still well with them after twelve years and I expect this to be the case in another fifty years.
     
    Davo, LMS2968, osprey и 3 другим нравится это.
  19. W.Williams

    W.Williams Well-Known Member

    Дата регистрации:
    20 дек 2015
    Сообщения:
    1.650
    Симпатии:
    1.559
    Род занятий:
    Mechanical Engineer
    Адрес:
    Aberdeenshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    It is probably worth noting, I stand happy to be corrected here, that MPI inspection was not routine during 20'2/30's etc. Its also worth noting castings all have a degree of porosity and can easily be cracked compared to say a forging.

    I bet there are plenty of wheels out there with cracking in them, but its not an issue because:

    1. They aren't going to be run on the mainline. Well, not in anger at least.
    2. The cracks are not propagating.
    3. The wheels are unlikely to come off the wheels any time soon.

    One thing I'm a little curious about. Some wheels were tough to get off the axles, which to me anyway, suggests the interference fit applied was incorrect.

    Not saying the DWG or design was incorrect, merely that the hole-shaft values as delivered were not conforming to drawing. Big shaft in to small hole would be a very probable candidate to promote cracking.

    We have to remember castings are by nature not very ductile. This makes them a bit binary. They are either good or not good. A good casting ex-foundry can become not good further down the line in the manufacturing/assembly stages. Sometimes its not even ambiguous and they go from usable to utterly un-salvageable after one operation.
    As manufacturing methods go, castings are not the most forgiving.

    As an aside, i am wondering if these truths are what have convinced the P2 group to opt for a more ductile, and more easily repairable, fabricated assembly.

    Ach, its all by the by. Iv every faith it will be resolved and progress will crack on.
     
    Last edited: 8 июл 2021
    30854 и Richard Roper нравится это.
  20. osprey

    osprey Resident of Nat Pres

    Дата регистрации:
    3 окт 2007
    Сообщения:
    10.494
    Симпатии:
    2.855
    Род занятий:
    semi-retired, currently doing R&D for my patents
    Адрес:
    Halifax
    Like
    crack on...I hope not again..
     
    Davo и 30854 нравится это.

Поделиться этой страницей