LMS Patriot Project Updates

الموضوع في 'Steam Traction' بواسطة Gav106, بتاريخ ‏10 إبريل 2011.

  1. martin1656

    martin1656 Nat Pres stalwart Friend

    إنضم إلينا في:
    ‏8 ديسمبر 2014
    المشاركات:
    19,260
    عدد المعجبين:
    12,514
    الجنس:
    ذكر
    مكان الإقامة:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Do they need to totally disassemble the frames though? can't they drill through the rivets on say one stretcher, remove the stretcher, needle gun the frames in that segment clean back both faces, re fit the stretcher, primer, the bare metal, and cleaning back as they go along, doing it a segment at a time, needle gunning the frames as they go, the insides first, removing each part as they work along, rectifying any issues , possibly setting up the horn guides etc properly at the same time.
     
  2. Argus

    Argus New Member

    إنضم إلينا في:
    ‏14 جويلية 2010
    المشاركات:
    75
    عدد المعجبين:
    30
    الجنس:
    ذكر
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Thats not what I was told and I'm fairly sure what I was told was fact....
     
  3. Jimc

    Jimc Part of the furniture

    إنضم إلينا في:
    ‏8 سبتمبر 2005
    المشاركات:
    4,117
    عدد المعجبين:
    4,821
    الوظيفة:
    Once computers, now part time writer I suppose.
    مكان الإقامة:
    SE England
    Heritage Railway Volunteer:
    No I do not currently volunteer
    There's an argument, though, that if you are not comfortable one aspect of the work has been properly carried out, that it could make more sense to check everything else in detail at this stage rather than be bitten later.
     
    Richard Roper, Gav106, osprey و 4 آخرون معجبون بهذا.
  4. MellishR

    MellishR Resident of Nat Pres Friend

    إنضم إلينا في:
    ‏16 إبريل 2009
    المشاركات:
    8,911
    عدد المعجبين:
    5,847
    I did realise that. I wondered whether parts had been tacked together with ordinary bolts just to hold them in place temporarily.
     
  5. ghost

    ghost Part of the furniture

    إنضم إلينا في:
    ‏29 ماي 2006
    المشاركات:
    4,303
    عدد المعجبين:
    5,727
    الجنس:
    ذكر
    مكان الإقامة:
    N.Ireland
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Probably quicker to dismantle, shot blast, paint and then reassemble rather than trying to keep everything aligned while dismantling/painting individual parts.
     
    أعجب بهذه المشاركة jnc
  6. toplight

    toplight Well-Known Member

    إنضم إلينا في:
    ‏18 ماي 2009
    المشاركات:
    1,351
    عدد المعجبين:
    1,288
    مكان الإقامة:
    Swindon, England
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I was one of the covenantors at the time. This guy, I think his name was Vince Dunnington, or something similar who was involved with the project and had worked on building the original A1s at either Darlington or Doncaster, he wrote this report saying that the new frames for Tornado had lots of defects and weren't to the required standard. A further letter was then circulated to all the contributors by some other guy who had been involved in a voluntary capacity basically saying the project was in jeopardy and needed to be rescued by its supporters (because of this report).

    In hindsight it is clear that both were over dramatized. The A1 trust looked at all the issues highlighted and put them right and clearly they weren't anywhere near as major as was first implied, just a few things that needed correcting, but by then the doubts caused had already made me cancel my small monthly contribution. I am happy to see it went on to be a huge success.
     
    Last edited: ‏14 سبتمبر 2021
    Paul42 و Martin Perry معجبون بهذا.
  7. Argus

    Argus New Member

    إنضم إلينا في:
    ‏14 جويلية 2010
    المشاركات:
    75
    عدد المعجبين:
    30
    الجنس:
    ذكر
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Agreed, as I remember he had highlighted several supposed issues that when Blue Peter was looked over as an example of how it was done originally it was found that things on the frame construction of Blue Peter were not as he suggested they should be!
     
  8. unslet

    unslet New Member

    إنضم إلينا في:
    ‏6 جويلية 2008
    المشاركات:
    61
    عدد المعجبين:
    106
    الجنس:
    ذكر
    الوظيفة:
    Retired
    مكان الإقامة:
    Normanton
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I remember attending meetings surrounding Tornado's alleged non conformances. It seemed to be a devastating setback at the time but,to their credit,the A1 Trust tackled the problems and rectified them. Since then,with one unfortunate exception,the locomotive has been an outstanding success.
    This article gives more detail.
    https://www.thenorthernecho.co.uk/news/7091815.inquiry-delays-tornado-project/
     
    Richard Roper و jnc معجبون بهذا.
  9. S.A.C. Martin

    S.A.C. Martin Part of the furniture

    إنضم إلينا في:
    ‏31 أوت 2010
    المشاركات:
    5,615
    عدد المعجبين:
    9,418
    الجنس:
    ذكر
    الوظيفة:
    Asset Engineer (Signalling), MNLPS Treasurer
    مكان الإقامة:
    London
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I remember this well. My late grandfather thought that it could have been handled much better by those criticising the components that were found to be "out of kilter" as he put it. This did lead, in my view, to improving the A1 Trust's internal procedures and compliance/inspection, but it could have been handled differently and not created more heat than light.

    I think the accusation that Tornado would be "unsafe" was unfair at the time, and in hindsight looks unfair now too. It made for a better locomotive, of course, and a better organisation, and maybe we should be grateful for that: but the manner in which the complaints were carried out didn't sit right with me.

    Maybe that's part of railway preservation we need to work on: perhaps an independent panel where such things can be done with two aggrieved parties or purely to improve our standards of work where questions need to be asked. Something akin to a preservation Ombudsman, perhaps.

    I've always felt "jaw jaw" was better than "war war" when it comes to us all coming together to make railway preservation better. In terms of new builds, they sit outside of "preservation" and are more "recreation" - but shouldn't be excluded on those grounds.

    In short, there must be a better way of asking engineering questions and pushing standards up in our industry?
     
    misspentyouth62, 2392 و jnc معجبون بهذا.
  10. ghost

    ghost Part of the furniture

    إنضم إلينا في:
    ‏29 ماي 2006
    المشاركات:
    4,303
    عدد المعجبين:
    5,727
    الجنس:
    ذكر
    مكان الإقامة:
    N.Ireland
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Is this the same Mr Bottomley that owns 92207?
     
  11. Bikermike

    Bikermike Well-Known Member

    إنضم إلينا في:
    ‏11 مارس 2020
    المشاركات:
    1,814
    عدد المعجبين:
    2,045
    الجنس:
    ذكر
    مكان الإقامة:
    Thameslink territory
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I wonder how much of the problems in the Patriot were caused by the rush for the 2018 WW1 centenary.

    Sorting the frames will be a horrible job. Although it will provide information as to how driven bolts behave.
     
    jnc, 2392 و Matt37401 معجبون بهذا.
  12. class8mikado

    class8mikado Part of the furniture

    إنضم إلينا في:
    ‏1 جوان 2009
    المشاركات:
    3,840
    عدد المعجبين:
    1,644
    الوظيفة:
    Print Estimator/ Repository of Useless Informatio.
    مكان الإقامة:
    Bingley W.Yorks.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Before they were scrapped the 1st Clan frames had a healthy coating of Mill scale. The replacement set didnt seem to have this so perhaps this had already been removed before delivery.
    The assembly policy there seems to be bare metal to bare metal with the use, where necessary, of an abrasive disc...
     
  13. W.Williams

    W.Williams Well-Known Member

    إنضم إلينا في:
    ‏20 ديسمبر 2015
    المشاركات:
    1,650
    عدد المعجبين:
    1,559
    الوظيفة:
    Mechanical Engineer
    مكان الإقامة:
    Aberdeenshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    My own view on this, in the last couple of instances, has been to be supportive given that there is a clear demonstration of transparency by the engineering team.

    That hasn't changed. These are all engineering issues, and they are all resolved as a matter of routine in the railway preservation industry. In truth, all of this has all be done before.

    I'm more optimistic than ever. Now we are down to bare frames there really is not much left to be discovered.

    At some point, the only way is up.
     
    Gareth, Monkey Magic, brmp201 و 15 آخرون معجبون بهذا.
  14. martin1656

    martin1656 Nat Pres stalwart Friend

    إنضم إلينا في:
    ‏8 ديسمبر 2014
    المشاركات:
    19,260
    عدد المعجبين:
    12,514
    الجنس:
    ذكر
    مكان الإقامة:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Very True, once you reach the bottom, there is only one way you can go, that's up, If It means starting the reassembly from scratch so be it, at least, nothing more can go wrong, at each stage, if every stage is checked, double checked and done correctly, So many have been the errors that have come to light, that it might turn out to be a blessing in disguise, because then, if you know for sure its done right, you shouldn't need to re do it later, i dread to think what would have happened had these defects not been found out and the engine failed on the big railway, and an inspection found a catalogue of mistakes, might it have made NR consider banning steam completely, or at least insisting engines had an provable overhaul record? meaning overhauls becoming even more stricter, with full documentation at every stage .
     
    Gareth و jnc معجبون بهذا.
  15. 30854

    30854 Resident of Nat Pres

    إنضم إلينا في:
    ‏8 مارس 2017
    المشاركات:
    12,172
    عدد المعجبين:
    11,496
    الجنس:
    ذكر
    الوظيفة:
    Retired
    مكان الإقامة:
    Brighton&Hove
    Heritage Railway Volunteer:
    No I do not currently volunteer
    True. Certainly the current Clan team have wrought wonders ..... and a Patriot has one less axle to worry about!

    It seems to me that the new team's commendably open approach is thoroughly deserving of confidence. OK, so we've seen a litany of horrors, which the build could of course have done without, but perhaps it would lift spirits somewhat to list the very many fully serviceable components which the newly 're-engineered' Unknown Warrior project has to hand?
     
    andrewshimmin, Gav106, ghost و 4 آخرون معجبون بهذا.
  16. Diamond Gaz

    Diamond Gaz Well-Known Member

    إنضم إلينا في:
    ‏15 إبريل 2005
    المشاركات:
    1,658
    عدد المعجبين:
    84
    ghost, marshall5, jnc و 5 آخرون معجبون بهذا.
  17. 60017

    60017 Resident of Nat Pres Friend

    إنضم إلينا في:
    ‏6 جويلية 2008
    المشاركات:
    9,102
    عدد المعجبين:
    8,071
    الجنس:
    ذكر
    الوظيفة:
    Retired from corporate slavery :o)
    مكان الإقامة:
    Fylde Coast
    Heritage Railway Volunteer:
    No I do not currently volunteer
    An informative but painful read. I sincerely hope that these difficulties and setbacks can be overcome and that the income stream will continue, allowing project completion.
     
    Richard Roper, johnnew, ghost و 1 شخص آخر معجبون بهذا.
  18. Bikermike

    Bikermike Well-Known Member

    إنضم إلينا في:
    ‏11 مارس 2020
    المشاركات:
    1,814
    عدد المعجبين:
    2,045
    الجنس:
    ذكر
    مكان الإقامة:
    Thameslink territory
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Glad to see that they are putting some detail of what's going right as well as all the (important as it is) things going wrong.
     
    Gareth و jnc معجبون بهذا.
  19. martin1656

    martin1656 Nat Pres stalwart Friend

    إنضم إلينا في:
    ‏8 ديسمبر 2014
    المشاركات:
    19,260
    عدد المعجبين:
    12,514
    الجنس:
    ذكر
    مكان الإقامة:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Because the original x-ray examination of the driving wheel castings is said to have not been of sufficient clarity, could the foundry be said to be at fault ? if so lets hope they accept responsibility and offer to recast a complete set of driving wheels for the company ,at their own expense does that pattern still exist that was used?
     
  20. osprey

    osprey Resident of Nat Pres

    إنضم إلينا في:
    ‏3 اكتوبر 2007
    المشاركات:
    10,492
    عدد المعجبين:
    2,850
    الوظيفة:
    semi-retired, currently doing R&D for my patents
    مكان الإقامة:
    Halifax
    It all depends on the terms of the contract between the parties concerned, surely?
     
    jnc, Paul42, Jamessquared و 1 شخص آخر معجبون بهذا.

مشاركة هذه الصفحة