If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

East Lancs Railway

Rasprava u 'Heritage Railways & Centres in the UK' pokrenuta od forty, 23. Listopad 2016..

  1. class8mikado

    class8mikado Part of the furniture

    Pridružen(a):
    1. Lipanj 2009.
    Poruka:
    3,840
    Lajkova:
    1,644
    Interesi:
    Print Estimator/ Repository of Useless Informatio.
    Grad:
    Bingley W.Yorks.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Fairly sure the trackbed and infrastructure could accommodate a double track if necessary
     
  2. 46223

    46223 Resident of Nat Pres Friend

    Pridružen(a):
    10. Travanj 2011.
    Poruka:
    6,693
    Lajkova:
    6,342
    Spol:
    Muškarac
    Grad:
    Lancs
    Heritage Railway Volunteer:
    No I do not currently volunteer
  3. mdewell

    mdewell Well-Known Member Friend

    Pridružen(a):
    23. Ožujak 2005.
    Poruka:
    1,925
    Lajkova:
    2,999
    Interesi:
    UK & Ireland Heritage Railways Webmaster
    Grad:
    Ruabon, Wrexham
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    46223 se sviđa ovo.
  4. jnc

    jnc Well-Known Member

    Pridružen(a):
    3. Travanj 2012.
    Poruka:
    1,511
    Lajkova:
    2,709
    Spol:
    Muškarac
    Grad:
    Western Atlantic
    Heritage Railway Volunteer:
    No I do not currently volunteer
    It could also be a typo that the spell-checker didn't flag; these days, if people don't see a squiggly red line, they think it's OK. ('I'm going to take a different tact' passes OK.) Yes, being fully literate and checking carefully, instead of being lazy and relying on the spell-checker, will catch those 'two' (sic).

    Noel
     
  5. 5944

    5944 Resident of Nat Pres

    Pridružen(a):
    14. Siječanj 2006.
    Poruka:
    8,863
    Lajkova:
    9,273
    Spol:
    Muškarac
    Interesi:
    Train Maintainer for GTR at Hornsey
    Grad:
    Letchworth
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I don't see how that would work, especially with regards the signal boxes. Are they planning on only running trains when volunteers are available, or will they need to be manned by paid staff? If they envisage a useful service for commuters, then the services will need to start early and finish late, requiring two shifts of signallers. You can't be relying on volunteers if you're running a proper service. So you'd probably need about 16 signallers to cover for hours, leave and sickness. Is that really an option?
     
    MellishR se sviđa ovo.
  6. MellishR

    MellishR Resident of Nat Pres Friend

    Pridružen(a):
    16. Travanj 2009.
    Poruka:
    8,913
    Lajkova:
    5,851
    This has been often cited as one of several reasons why a commuter service on the WSR is impractical. How would the East Lancs be any different in that respect?
     
    5944 se sviđa ovo.
  7. Springs Branch

    Springs Branch New Member

    Pridružen(a):
    6. Ožujak 2016.
    Poruka:
    198
    Lajkova:
    260
    Spol:
    Muškarac
    Interesi:
    Retired
    Grad:
    8F
    Heritage Railway Volunteer:
    No I do not currently volunteer
    No , it isn't a realistic option, but the whole thing is an amazing aspiration from certain people within one of the three councils who own the trackbed, but which is on a 99 year lease to the ELLR. The other two councils and the ELLR have no intention of any commuter service being allowed to interfere with the heritage operation. It's a classic politics 'pie in the sky' project, and the application form for the Restoring your Railway fund that got Rossendale Council the £50,000 is so full of political 'half-truths' that even Boris Johnson would have trouble keeping a straight face.
     
    Last edited: 7. Studeni 2021.
    mgl, MellishR, YorkyLad i 1 drugoj osobi se sviđa ovo.
  8. jamesd

    jamesd Member

    Pridružen(a):
    24. Kolovoz 2009.
    Poruka:
    641
    Lajkova:
    354
    Grad:
    S Wales
    Heritage Railway Volunteer:
    No I do not currently volunteer
    All the money will deliver is the next stage of feasibility studies. These will probably flag up the issues raised above as insurmountable and the scheme won't go any further.
     
    jnc se sviđa ovo.
  9. mdewell

    mdewell Well-Known Member Friend

    Pridružen(a):
    23. Ožujak 2005.
    Poruka:
    1,925
    Lajkova:
    2,999
    Interesi:
    UK & Ireland Heritage Railways Webmaster
    Grad:
    Ruabon, Wrexham
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    But isn't it nice to know that our tax money is being wisely spent. . . :D
     
    Bluenosejohn and jnc like this.
  10. gwralatea

    gwralatea Member

    Pridružen(a):
    31. Prosinac 2014.
    Poruka:
    511
    Lajkova:
    1,006
    Spol:
    Muškarac
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Actually I'd argue that this is spending taxpayers money wisely - for a start £50k in the great scheme of things is nothing.

    Secondly, sometimes good ideas get buried because 'everybody knows' they won't work. You me and the gatepost probably know this one won't work, but without the body of evidence to say that (the scoping piece) then really it would be a dereliction to say 'we all know it won't work so that's an end of it' - it works the same the other way round too. No project should be started just because you and me think it's a good idea either. There needs to be a paper trail to show it has been thought about.

    We can all probably say what the feasibility study will say right now, but there still needs to be a feasibility study - it shows the proponents the reason why their idea is a non-starter, and it doesn't preclude the wisdom of crowds being found wrong.
     
    3ABescot, DismalChips i jnc se sviđa ovo.
  11. MellishR

    MellishR Resident of Nat Pres Friend

    Pridružen(a):
    16. Travanj 2009.
    Poruka:
    8,913
    Lajkova:
    5,851
    That is all perfectly reasonable, but why does it cost £50k? Even with a good salary and overheads that would pay for a few months of someone working full time on it.
     
    jnc and Bluenosejohn like this.
  12. Paul Grant

    Paul Grant Well-Known Member

    Pridružen(a):
    6. Listopad 2010.
    Poruka:
    1,525
    Lajkova:
    1,120
    Grad:
    Fife
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I've said before, its all consultant fees and that theres no real appetite for for any of these plans given that they're mostly being proposed for preserved railways. Its all bungs to friends, nothing more nothing less.
     
    mgl and Bluenosejohn like this.
  13. gwralatea

    gwralatea Member

    Pridružen(a):
    31. Prosinac 2014.
    Poruka:
    511
    Lajkova:
    1,006
    Spol:
    Muškarac
    Heritage Railway Volunteer:
    No I do not currently volunteer
    No, at small consultancy rates (i.e. not Accenture), that's about 5 weeks work for an Associate Director, with some Director time for checking the work, and a Research Manager and say two researchers to do the spadework.
     
    35B se sviđa ovo.
  14. JEB-245584

    JEB-245584 Member

    Pridružen(a):
    21. Svibanj 2008.
    Poruka:
    465
    Lajkova:
    532
    Interesi:
    ADI
    Is it me, but do I read it that a local councillor is pushing for a rail link to make it easier for people to travel out of that councils area for work and leisure purposes etc. Or even the reverse which will provide easier links into the borough for Manchester dwelling people who will then probably be able to purchase property in the area, thus driving up prices, and forcing the locals out of the housing market.
     
    YorkyLad se sviđa ovo.
  15. Springs Branch

    Springs Branch New Member

    Pridružen(a):
    6. Ožujak 2016.
    Poruka:
    198
    Lajkova:
    260
    Spol:
    Muškarac
    Interesi:
    Retired
    Grad:
    8F
    Heritage Railway Volunteer:
    No I do not currently volunteer
    There have been two such full feasibility studies in the last 11 years commissioned by the various 'bigger picture' authorities in the area (one by Greater Manchester, one by Lancashire). Suffice it to say that the costs were eye-watering, many millions higher than the extremely simplistic figures quoted in this latest submission. There is also the little matter of a requirement for an ongoing annual subsidy that was (at best estimates) nudging towards seven figures (5 years ago). This is the third attempt by Rossendale Borough Council to seek funds from the Restoring your Railways fund, the previous two attempts having been unsuccessful for some reason.........
     
    lil Bear, jnc i Bluenosejohn se sviđa ovo.
  16. 80104

    80104 Member

    Pridružen(a):
    19. Studeni 2020.
    Poruka:
    725
    Lajkova:
    481
    Grad:
    a small town in germany
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Or for that matter Swanage Railway where the railway will have to dispell the belief that some locals have that SR will offer a 7 day a week year round service between Swanage and Wareham including times that would enable commuting or even going to London for the day.
     
  17. 35B

    35B Nat Pres stalwart

    Pridružen(a):
    18. Lipanj 2011.
    Poruka:
    28,738
    Lajkova:
    28,673
    Spol:
    Muškarac
    Grad:
    Grantham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    @gwralatea has answered on the rates themselves, but I’d also add that projects like that tend not to be full time, but intermittent because of the need to gather input, wait for responses, etc.

    There’s a legitimate discussion about whether this work is best done by a consultant or on payroll, but that question has to include discussion of “who’s payroll?”. That analysis work does require some specialist knowledge and skills, not to do the spreadsheets but actually to understand what is - and isn’t - plausible as part of the business case.


    Sent from my iPhone using Tapatalk
     
  18. MellishR

    MellishR Resident of Nat Pres Friend

    Pridružen(a):
    16. Travanj 2009.
    Poruka:
    8,913
    Lajkova:
    5,851
    Does it really need even five weeks of someone's time?
     
  19. gwralatea

    gwralatea Member

    Pridružen(a):
    31. Prosinac 2014.
    Poruka:
    511
    Lajkova:
    1,006
    Spol:
    Muškarac
    Heritage Railway Volunteer:
    No I do not currently volunteer
    as per post above, that's not 5 weeks of 9-5, Monday-Friday, it's 5 weeks of elapsed time. To be honest, for a data review/collation, it's about standard. Bear in mind the thing will be basically written in three weeks (week one is reading everything, week 2 is synthesising it and additional lines of enquiry off the back off what you've read week three is writing it), week 4 is polishing/formatting/obsessively proofing, and week 5 is the work to be done when the client has read it - before final submission.

    Data review and reporting, even at £50k, is not a way to make money (to the extent that many consultancies that can offer it choose not to). On a strict 'hours' basis they often end up undercosted - when you get 200 documents out of the blue, for example, so at least you could console yourself that £50k to review the East Lancs situation is doing nothing more than contributing to someone's bottom line, there's basically no profit margin.
     
    jnc se sviđa ovo.
  20. Ploughman

    Ploughman Part of the furniture

    Pridružen(a):
    1. Travanj 2008.
    Poruka:
    5,969
    Lajkova:
    2,761
    Interesi:
    Ex a lot of things.
    Grad:
    Near where the 3 Ridings meet
    Heritage Railway Volunteer:
    Yes I am an active volunteer

Podijelite ovu stranicu