If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Brand new bullhead rail

Тема в разделе 'Heritage Railways & Centres in the UK', создана пользователем Paulthehitch, 13 янв 2022.

  1. osprey

    osprey Resident of Nat Pres

    Дата регистрации:
    3 окт 2007
    Сообщения:
    10.497
    Симпатии:
    2.855
    Род занятий:
    semi-retired, currently doing R&D for my patents
    Адрес:
    Halifax
    Out of curiosity where is the rail rolled?
     
  2. Paulthehitch

    Paulthehitch Well-Known Member

    Дата регистрации:
    13 фев 2020
    Сообщения:
    1.090
    Симпатии:
    1.093
    Пол:
    Мужской
    Адрес:
    Hayling Island
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Scunthorpe
     
  3. osprey

    osprey Resident of Nat Pres

    Дата регистрации:
    3 окт 2007
    Сообщения:
    10.497
    Симпатии:
    2.855
    Род занятий:
    semi-retired, currently doing R&D for my patents
    Адрес:
    Halifax
    Smashing..thanks for that..
     
  4. cav1975

    cav1975 Member

    Дата регистрации:
    24 сен 2009
    Сообщения:
    526
    Симпатии:
    649
    The new bullhead is going in to replace some of the second hand material from the Brading to Sandown singling that was laid for the extension in 1989-1991. The recent kind donation by SWR is flat bottom but it has all been cut into short lengths and will only be suitable for sidings.

    Incidentally the bull head rail is a catalogue item from British Steel Scunthorpe - see page 2 of this pdf https://britishsteel.co.uk/media/40811/special-rail-dimensions-and-properties.pdf .
     
    30854 и Paulthehitch нравится это.
  5. Hirn

    Hirn Member

    Дата регистрации:
    11 авг 2015
    Сообщения:
    512
    Симпатии:
    320
    Пол:
    Мужской
     
    Bluenosejohn и Paulthehitch нравится это.
  6. johnofwessex

    johnofwessex Resident of Nat Pres

    Дата регистрации:
    6 апр 2015
    Сообщения:
    9.748
    Симпатии:
    7.859
    Пол:
    Мужской
    Род занятий:
    Thorn in my managers side
    Адрес:
    72
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Presumably the Narrow Gauge lines must have their rail rolled to special order?
     
  7. Hirn

    Hirn Member

    Дата регистрации:
    11 авг 2015
    Сообщения:
    512
    Симпатии:
    320
    Пол:
    Мужской
    Yes indeed, there was a substantial cooperative order to recreate the Welsh Highland Railway and relay the Welshpool and Llanfair.
     
    Paulthehitch, Bluenosejohn и 30854 нравится это.
  8. osprey

    osprey Resident of Nat Pres

    Дата регистрации:
    3 окт 2007
    Сообщения:
    10.497
    Симпатии:
    2.855
    Род занятий:
    semi-retired, currently doing R&D for my patents
    Адрес:
    Halifax
    Thanks too, most interesting
     
  9. M59137

    M59137 Well-Known Member

    Дата регистрации:
    23 сен 2009
    Сообщения:
    1.389
    Симпатии:
    2.356
    Пол:
    Мужской
    Род занятий:
    Carriage & Wagon
    Адрес:
    Sheringham
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    New bullhead rail is being laid at the North Norfolk next week, in open countryside, as part of a rolling rail renewal program which has been in place for over a decade now.

    The "little and often" policy is to replace short sections each winter. This was a strategy thought of in the 2000's when it was realised that if action were not taken, by 2030/2040 we'd have approximately 3 miles of 1940's era track become life expired. Given the price of rail, that could be catastrophic for a 5 mile line if a grant or major rail donation was not achieved. It will take at least a further 10-20 years to replace the whole section.

    Luckily, with local conditions and curves etc, the 3 mile section has not worn evenly which fits in nicely with the policy to replace the worst sections each winter. Every few years (covid excepted) a relatively small amount of bullhead rail can be bought (but still five figures) which can come from normal earnings rather than storing up the problems and having to have an £X million track appeal.

    Sent from my moto g(8) power using Tapatalk
     
    ilvaporista, Mark Thompson, Paulthehitch и 8 другим нравится это.
  10. cav1975

    cav1975 Member

    Дата регистрации:
    24 сен 2009
    Сообщения:
    526
    Симпатии:
    649
    The policy on the Isle of Wight is very similar with a limited quantity of bullhead rail being replaced with new every winter. An appropriate number of sleepers are also replaced every year but not necessarily in the same places as the rail. Chairs seem to be lasting very well since the last of the LSWR chairs on the original section were replaced by S1s more than 30 years ago. Ballast, fishplates, etc ate also renewed as required meaning that there is little disruption and a steadily improving permanent way. All this is paid for out of general revenue and we try to reserve appeals, legacies and grants for developments rather than renewals.

    Nick
     
    Hirn, Mark Thompson, gwalkeriow и 6 другим нравится это.
  11. MellishR

    MellishR Resident of Nat Pres Friend

    Дата регистрации:
    16 апр 2009
    Сообщения:
    8.912
    Симпатии:
    5.849
    If only other railways could do the same.
     
    30854, Paulthehitch, cav1975 и ещё 1-му нравится это.
  12. Mark Thompson

    Mark Thompson Well-Known Member

    Дата регистрации:
    10 сен 2017
    Сообщения:
    1.591
    Симпатии:
    3.934
    Пол:
    Мужской
    Адрес:
    E sussex
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I wish that Bluebell had had a similar foresight. Unfortunately it was emphasis 9n the Northern Extension which meant that the original 5 miles from SP- HK became an urgent need for replacement, with similar 1940s vintage p/way. It's unfortunate that the position the railway found itself in, precluded the replacement of its worn out rail with newly- rolled bullhead. But what's done is done. At least the track is now something less to worry about
     
    Paulthehitch нравится это.

Поделиться этой страницей