If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Peak Rail General Discussion

Тема в разделе 'Heritage Railways & Centres in the UK', создана пользователем kestreleyes, 22 ноя 2009.

  1. 5944

    5944 Resident of Nat Pres

    Дата регистрации:
    14 янв 2006
    Сообщения:
    8.863
    Симпатии:
    9.266
    Пол:
    Мужской
    Род занятий:
    Train Maintainer for GTR at Hornsey
    Адрес:
    Letchworth
    Heritage Railway Volunteer:
    No I do not currently volunteer
    It was meant to do some work in South Wales on the Valley lines, but that never materialised sadly.
     
  2. Pete Thornhill

    Pete Thornhill Resident of Nat Pres Staff Member Administrator Moderator Friend

    Дата регистрации:
    24 июл 2008
    Сообщения:
    7.762
    Симпатии:
    5.890
    It wasn’t Pete Waterman, it was John Wilkinson who owned it at the time, it initially went to the WSR when restored for running in and was supposed to join the Tyseley fleet, primarily for working a local version of the Shakespeare expresses. John then sold it and it ended up staying on the WSR until the end of its ticket. I did a quick google and note that the listing on Preserved British Steam Locomotives is incorrect, showing it as purchased by Waterman in 1990 - it was later than that around 2003/4 that the ownership changed and it was already a working engine at that point.
     
  3. Pete Thornhill

    Pete Thornhill Resident of Nat Pres Staff Member Administrator Moderator Friend

    Дата регистрации:
    24 июл 2008
    Сообщения:
    7.762
    Симпатии:
    5.890
    I’d forgotten about that - also correct along with becoming Tyseley based, shame it never happened.
     
  4. ghost

    ghost Part of the furniture

    Дата регистрации:
    29 май 2006
    Сообщения:
    4.303
    Симпатии:
    5.727
    Пол:
    Мужской
    Адрес:
    N.Ireland
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    How do you know this? I really hope you're not going to say because it's got a new paint job...
     
    Last edited: 9 дек 2021
  5. City of truro fan

    City of truro fan Member

    Дата регистрации:
    29 ноя 2015
    Сообщения:
    795
    Симпатии:
    90
    Пол:
    Женский
    Адрес:
    Honiton
    Heritage Railway Volunteer:
    No I do not currently volunteer
    They have all done a good job to get it working again and I was saying well done to them. You must know that they haven’t done the work proply then.
     
  6. ghost

    ghost Part of the furniture

    Дата регистрации:
    29 май 2006
    Сообщения:
    4.303
    Симпатии:
    5.727
    Пол:
    Мужской
    Адрес:
    N.Ireland
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Nope, but I didn't make any claims that they had or hadn't done 'a proper job on it'
     
  7. ruddingtonrsh56

    ruddingtonrsh56 Well-Known Member

    Дата регистрации:
    14 сен 2009
    Сообщения:
    1.184
    Симпатии:
    1.814
    Пол:
    Мужской
    Адрес:
    Nottinghamshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    A 'Proper Job' could also just be a way of saying "It looks very smart". I think may be reading into CoTF's original comment a smidge more than is necessary :)
     
    hyboy, goldfish и The Dainton Banker нравится это.
  8. kestreleyes

    kestreleyes Well-Known Member

    Дата регистрации:
    4 окт 2007
    Сообщения:
    1.313
    Симпатии:
    936
    Род занятий:
    signal engineer
    The final Midland lamp tops have been fitted to the Rowsley station car park lamps, thanks to Ben,Richard,Dave And Dave that’s them all working now,

    Elsewhere John,Andrew and myself spent the day looking at the darley gate rollers for repairs or renewal as they’ve been rolling for thirty years now ,we also took off the old gate lamps to get them cleaned down and the tin work repaired and repainted so put the temp lamps on we created years back when we last took them off for restoration, we also erected the exchange location cupboard and John has stripped it out ready, itl get repainted on a dry day

    and it didn’t rain,


    The pway were sorting out stores and also got a chance to call in on Mr Briddon to say hello, the blue circle box van has recently been restored ,woodwork wise on one end and a new wooden floor fitted too.
     
    Last edited: 3 янв 2022
    Johnme101, burnham-t, bobw754 и ещё 1-му нравится это.
  9. kestreleyes

    kestreleyes Well-Known Member

    Дата регистрации:
    4 окт 2007
    Сообщения:
    1.313
    Симпатии:
    936
    Род занятий:
    signal engineer
    A video created by Stuart showing some of the last years goings on has been put on the association website, link follows

    https://peakrailwayassociation.co.uk/rc_images/peakrail.mp4

    The access road between the island at the entrance and the gates to ourselves at Rowsley should be well under way with its digging out and retarmaccing by now, a benefit to all those who remember the old access and the holes, can’t wait to see it finished.

    Rowsley viaduct has had the brambles and foliage removed I’m told, keeping the structure safe from root encroachment , now if the national network could only do the same

    on my own department we’ve started to fit out the telecoms loc that will take all the exchange cabling at Darley when we decommission the old grounded van exchange that’s served well for a good number of years, we also started replacing the Church Lane Signalbox walkboards for new boards with anti slip surfaces, that work continues .
     
    Johnme101, brmp201 и Bluenosejohn нравится это.
  10. D1039

    D1039 Guest

  11. MellishR

    MellishR Resident of Nat Pres Friend

    Дата регистрации:
    16 апр 2009
    Сообщения:
    8.912
    Симпатии:
    5.848
    That includes "hopefully you will get the chance to ride behind her again soon". Not in her? Are they going to motorise this unit and use it to pull something else? Or was that keyboard finger trouble?
     
  12. daveannjon

    daveannjon Well-Known Member

    Дата регистрации:
    31 мар 2006
    Сообщения:
    1.114
    Симпатии:
    425
    Адрес:
    Waiting for the Right Away
    So I'm gathering that the ride behind or in her will be at Scunthorpe, not Peak Rail?

    Dave
     
  13. Sidmouth

    Sidmouth Resident of Nat Pres Staff Member Moderator

    Дата регистрации:
    12 сен 2005
    Сообщения:
    10.146
    Симпатии:
    9.777
    Пол:
    Мужской
    Адрес:
    Alderan !
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Reported that sadly Jackie Statham has passed away
     
    Sheff и Gav106 нравится это.
  14. Luke McMahon

    Luke McMahon Member

    Дата регистрации:
    12 мар 2016
    Сообщения:
    278
    Симпатии:
    59
    Пол:
    Мужской
    Адрес:
    Macclesfield
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Must say when I visited last september things seemed to be improving at peak rail.

    The staff were very friendly & helpful, locos & stock were well turned out. Also the line itself looked to be getting some attention.

    Hoping to be spending a fair bit more time up there starting this year once I've bought another motor I'm getting involved with andy rowlands & the team working on 50029 & 50030.
     
    Bluenosejohn нравится это.
  15. kestreleyes

    kestreleyes Well-Known Member

    Дата регистрации:
    4 окт 2007
    Сообщения:
    1.313
    Симпатии:
    936
    Род занятий:
    signal engineer
    Sadly , yes we heard the same news today.

    s and t


    Andrew and myself spent today repainting church lane crossing gates, the box handrails and the wicker gate

    We also nipped up riverside and started to replace the walkway over the wires and rods, just the ramp boards and some more top planks to complete next time

    pway

    the pway have finished relaying sleepers in darley loop, also a large foliage clearance work has recently been undertaken too around darley to
    Matlock.
     
    bobw754, Johnme101, Bluenosejohn и ещё 1-му нравится это.
  16. Great Western

    Great Western Member

    Дата регистрации:
    22 ноя 2009
    Сообщения:
    327
    Симпатии:
    174
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Nice to see Peak Rail getting in on some national TV coverage with Ed Stafford’s program “69 days with the travellers” or similar…..
    Nice little site they have set up in the Matlock station car park, with the rubbish dump located just over the fence on peak rail !
     
  17. Vulcan Works

    Vulcan Works Member

    Дата регистрации:
    12 апр 2018
    Сообщения:
    266
    Симпатии:
    745
    Пол:
    Мужской
    Адрес:
    England
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Hopefully the improvements will continue. PR has the opportunity to take a fresh look at the things it does well and the things that have held back progress. A quick win would be to embrace social media and use it as a positive tool for communicating with customers and supporters. I sincerely hope that efforts are made to inspire and welcome back absent volunteers and supporters.
     
    Gav106, 48624, dggar и 3 другим нравится это.
  18. kestreleyes

    kestreleyes Well-Known Member

    Дата регистрации:
    4 окт 2007
    Сообщения:
    1.313
    Симпатии:
    936
    Род занятий:
    signal engineer
    Called in briefly this morning to make sure all was well signalling side after the recent storms, luckily it was and only a small gutter repair to one box to attend to, work will continue this week

    in other news the roadway into Rowsley site is now tarmacced fully , a local group has also planted a thousand sapling trees in the field between the railway and the river derwent which is nice to see

    Eustace is up on beams having its wheels overhauled and the 040 Deisel shunter being worked one in the shed is due to have its engine put back in soon, pway and lineside work continues.

    with the cold weather it was good to see Rowsley box self tensioning weight system doing its thing , the NRM recently had a look at some things the railway and the LMSCA have been undertaking with some of the NRM stock etcetera, the lever frame and equipment having also been given by themselves to the railway so it’s good to show how it’s going
     

    Вложения:

    crantock, bobw754, ilvaporista и 2 другим нравится это.
  19. kestreleyes

    kestreleyes Well-Known Member

    Дата регистрации:
    4 окт 2007
    Сообщения:
    1.313
    Симпатии:
    936
    Род занятий:
    signal engineer
    We stuck to darley work this morning as Matlock was flooded out, after rescuing a motorist (turned out one of the builders on the new estate) we replaced the lever one microswitch and also levelled up the blockshelf again and added some ducting before heading to Rowsley to do some
    More electrical work and also put down some paving around Rowsley box

    The pway were busy dismantling the old loading dock, in the shed the 040 shunter has had its engine now fitted and the 280 work continues, wheels
    Having been needle gunned and primed up.

    Eustace is awaiting its wheels going back in

    Apart from that and the flooding and the high winds
     

    Вложения:

    Johnme101, bobw754, ilvaporista и 4 другим нравится это.
  20. crantock

    crantock Member

    Дата регистрации:
    22 ноя 2008
    Сообщения:
    528
    Симпатии:
    276
    Пол:
    Мужской
    Род занятий:
    Beancounter
    Адрес:
    Birmingham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Was “the old loading dock” where the HST started their brake van trips from?


    Sent from my iPhone using Tapatalk
     

Поделиться этой страницей