If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

West Somerset Railway General Discussion

الموضوع في 'Heritage Railways & Centres in the UK' بواسطة gwr4090, بتاريخ ‏15 نوفمبر 2007.

  1. Bayard

    Bayard Well-Known Member

    إنضم إلينا في:
    ‏26 إبريل 2015
    المشاركات:
    1,841
    عدد المعجبين:
    3,904
    الجنس:
    ذكر
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Yes, sorry, I was thinking in monetary terms, but a cheap bottle of wine or a bunch of petrol station flowers can be pretty insulting, too, so this form of thanks takes some care. Often, just being sincerely thanked and being let know that your efforts are genuinely appreciated and have given pleasure is enough.
     
    أعجب بهذه المشاركة ross
  2. 242A1

    242A1 Well-Known Member

    إنضم إلينا في:
    ‏3 ديسمبر 2006
    المشاركات:
    1,561
    عدد المعجبين:
    1,304
    Given the unresolvable and long running situation to be found on the WSR it might be that a glance back into the very early days of railway preservation might be useful.

    One of the early ideas considered for the Talyllyn Railway was to relay the line between Wharf and Abergynolwyn to a gauge of 10 3/4". The section between Wharf and Pendre would be gauntleted, retaining the original 2' 3"and the new miniature track and the original locomotives and stock would be displayed over this section. In practical and financial terms this proposal had much to recommend it. Practical and financial, there is a clue.

    The NG G16 class could easily work trains over a line like the WSR with a loading capacity more than sufficient to meet passenger requirements. You wouldn't need to worry about 20 ton axle loadings and the costs of maintaining 22.75 miles of standard gauge line to RA9 but you could and would run and display GW branch type trains over the gauntleted section. The stations would remain much the same, so would much else.

    The line length would not be lost but the GW branchline aspect would be reduced to a more manageable section.

    It is a bit late in the day to change now but someone should have been paying attention to the past and have been prepared to think outside the 20 odd mile GW branch cum commuter line box.
     
  3. D1039

    D1039 Guest

    In the two periods ending '21 and '20 the PLC reported profits, '19 was a big loss and the previous year ('17, restated) was a profit. So it's reported a loss one year in four, though the consolidated '17-'21 period does show a big loss, if that makes sense.
     
  4. ross

    ross Well-Known Member

    إنضم إلينا في:
    ‏18 ماي 2017
    المشاركات:
    1,002
    عدد المعجبين:
    2,477
    الجنس:
    ذكر
    مكان الإقامة:
    Titfield
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Does the income for '20 and '21 only come from the farebox and fundraising, or does it include big dollops of covid-relief money?
     
  5. 61624

    61624 Part of the furniture

    إنضم إلينا في:
    ‏27 سبتمبر 2006
    المشاركات:
    5,294
    عدد المعجبين:
    3,599
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    That's interesting, but of course it doesn't tell the whole story. If they were spending less than they should on infrastructure maintenance (as would appear to be the case) then of course the P & L position would appear to be better than it was in reality.
     
  6. Bayard

    Bayard Well-Known Member

    إنضم إلينا في:
    ‏26 إبريل 2015
    المشاركات:
    1,841
    عدد المعجبين:
    3,904
    الجنس:
    ذكر
    Heritage Railway Volunteer:
    No I do not currently volunteer
    This passage from Nevil Shute's novel, "Ruined City", about a banker trying to revive a bankrupt shipbuilding company, is apposite here I think:
    "You must make this first year's accounts as bad as ever they can be", he said. "You've got a marvellous opportunity to do so now, one that you'll never have again. You must examine every contract that you've got, with Jennings, and Grierson must tell the auditors that every contract will be carried out at a loss. He will probably be right, of course - but you must pile it on. .... You must show in this year all the losses that you're going to make next year, and the year after. If you can swing the figure of this year's loss up to a hundred thousand pounds - that's grand. If you can get the auditors to make it a hundred and fifty thousand - so much the better. ....Get it as high as you can. In your chairman's speech, just say that full reserves have been made in this year's accounts for contracts negotiated by the the late chairman. That's literally all you need to say in the way of explanation."
    To a large extent, figures can be made to say what you want them to say.
     
    أعجب بهذه المشاركة D1039
  7. Miff

    Miff Part of the furniture Friend

    إنضم إلينا في:
    ‏17 جوان 2008
    المشاركات:
    3,000
    عدد المعجبين:
    3,023
    Only until there is not enough cash.
     
    أعجب بهذه المشاركة 35B
  8. gwilialan

    gwilialan Well-Known Member

    إنضم إلينا في:
    ‏8 ديسمبر 2012
    المشاركات:
    1,706
    عدد المعجبين:
    3,987
    الجنس:
    ذكر
    مكان الإقامة:
    Out there somewhere
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Sorry to take the subject back to the paid/volunteer discussion but I have just discovered this in the "Become a Volunteer" section of the website:-

    "CIVIL & STRUCTURES ENGINEERING LEAD

    The CSEL will be responsible for checking that the WSR plc fixed infrastructure and related facilites are maintained in a serviceable and safe condition, available to support the passenger services operated by the WSR.

    The CSEL will play an important role in supporting the Infrastructure Manager in setting policy direction and delivering the strategic requirements. This includes its Ten-Year Plan, together with the business requirements of the three year business plan.

    The postholder will be an experienced civil engineer ideally educated to degree standard and with incorporated or chartered professional status..." (My highlighting)

    Now is this ancient history and the web page just not been updated, or is it new? I don't know.

    Either way, harking back to the paid/volunteer discussion it appears that the board is happy to expect "...an experienced civil engineer ideally educated to degree standard and with incorporated or chartered professional status..." to come and fill a role that could be considered fairly essential for free while a Planning and Compliance Officer (AKA Clerical Support) should be a paid role.

    Like I said before, I'm confused, I just don't understand the current workings of the WSR senior management. I suppose Spock (Mr. not DR.) might say "It's logic Jim - but not as we know it"...
     
    Last edited: ‏12 فبراير 2022
    MellishR, Dennis John Brooks و 242A1 معجبون بهذا.
  9. Steve

    Steve Resident of Nat Pres Friend

    إنضم إلينا في:
    ‏7 اكتوبر 2006
    المشاركات:
    12,729
    عدد المعجبين:
    11,847
    الوظيفة:
    Gentleman of leisure, nowadays
    مكان الإقامة:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    It's only recently that the NYMR's head of Civil Engineering, whose CV would fit that given above, has retired and he had done it on a voluntary basis ever since I can remember, perhaps from the NYMR's inception in 1967. Unfortunately, from this perspective, his replacement is paid staff. At the end of the day, you don't get these people unless you ask and there's no harm in doing that.
     
    35B, ross, malcolm imps و 4 آخرون معجبون بهذا.
  10. 35B

    35B Nat Pres stalwart

    إنضم إلينا في:
    ‏18 جوان 2011
    المشاركات:
    28,731
    عدد المعجبين:
    28,657
    الجنس:
    ذكر
    مكان الإقامة:
    Grantham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Absolutely. Though I would also add the caution that you may get the service that you pay for. In another environment, I can think of a situation where moving from voluntary to paid for a professional role had significant benefit because paid and voluntary work were no longer in tension.


    Sent from my iPad using Tapatalk
     
  11. Bayard

    Bayard Well-Known Member

    إنضم إلينا في:
    ‏26 إبريل 2015
    المشاركات:
    1,841
    عدد المعجبين:
    3,904
    الجنس:
    ذكر
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Just belatedly reading the winter WSR Journal and there is mention of a meeting between the Plc, WSRA and WSRHT boards to be held in December. Does anyone know if this meeting took place and, if so, what came out of it?
     
  12. Piggy

    Piggy Member

    إنضم إلينا في:
    ‏28 فبراير 2020
    المشاركات:
    250
    عدد المعجبين:
    327
    الجنس:
    ذكر
    مكان الإقامة:
    Somerset
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I think this is a manoeuvre to bypass and supersede the original Partnership Development Group. If you read the minutes of their meeting on 26th May 2021 it appears to have been hijacked by JJP.......
     
  13. free2grice

    free2grice Part of the furniture Friend

    إنضم إلينا في:
    ‏19 سبتمبر 2005
    المشاركات:
    5,624
    عدد المعجبين:
    3,606
    الجنس:
    ذكر
    الوظيفة:
    Retired Rolls-Royce engineer
    مكان الإقامة:
    Bath Green Park / Mangotsfield
    Heritage Railway Volunteer:
    No I do not currently volunteer
    أعجب بهذه المشاركة Greenway
  14. 61624

    61624 Part of the furniture

    إنضم إلينا في:
    ‏27 سبتمبر 2006
    المشاركات:
    5,294
    عدد المعجبين:
    3,599
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    They should spend it quickly, before the PLC tries to get their hands on the money!
     
    Dennis John Brooks و Matt37401 معجبون بهذا.
  15. Matt37401

    Matt37401 Nat Pres stalwart

    إنضم إلينا في:
    ‏8 جوان 2014
    المشاركات:
    15,551
    عدد المعجبين:
    11,955
    مكان الإقامة:
    Wnxx
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Or before they get called the next ‘Cuckoo in the Nest’ if they don’t!
     
    أعجب بهذه المشاركة Great Western
  16. Maunsell907

    Maunsell907 Member

    إنضم إلينا في:
    ‏4 نوفمبر 2013
    المشاركات:
    915
    عدد المعجبين:
    2,078
    الجنس:
    ذكر
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    May I respectfully suggest you actually read the Gazette article i.e much of the money has been spent,
    including purchase of land adjacent to station, repairs/improvements to the station and surroundings
    plus contribution towards the Railway’s rail replacement fund.

    The PLC Chair thanks the station master and his team for all their hard work and support.

    Also perhaps you should note that a key element of their fundraising emanates from cream
    teas, drinks etc and station visitors. ( probably needs an operating Railway ! ? )

    A retraction of your post I’m sure would be welcome.


    Michael Rowe
     
    Mike West, 6960 Raveningham Hall و used2be معجبون بهذا.
  17. Matt37401

    Matt37401 Nat Pres stalwart

    إنضم إلينا في:
    ‏8 جوان 2014
    المشاركات:
    15,551
    عدد المعجبين:
    11,955
    مكان الإقامة:
    Wnxx
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I’ve read the article Micheal but whilst I doff my proverbial hat to those at Stogumber, it really makes me wonder why those in charge decided that it was a good idea to kick those off at another station down the line at Washford?
    There are some big questions that haven’t been answered yet. Or the answer’s we get seem rather vague shall we say.
     
    أعجب بهذه المشاركة 35B
  18. Pete Thornhill

    Pete Thornhill Resident of Nat Pres Staff Member Administrator Moderator Friend

    إنضم إلينا في:
    ‏24 جويلية 2008
    المشاركات:
    7,762
    عدد المعجبين:
    5,890
    From the gazette -
    It does raise the question is this money included (or has been) in the WSR appeal total?
     
    أعجب بهذه المشاركة Matt37401
  19. Bayard

    Bayard Well-Known Member

    إنضم إلينا في:
    ‏26 إبريل 2015
    المشاركات:
    1,841
    عدد المعجبين:
    3,904
    الجنس:
    ذكر
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Do you mean "has the whole £20K been included?" as I would have though it would be legitimate to include the amount donated by the Friends towards track renewal. Mind you, I wouldn't be surprised if the answer to that question were to be "yes". The appeal total did go up by rather a lot recently.
     
  20. gwilialan

    gwilialan Well-Known Member

    إنضم إلينا في:
    ‏8 ديسمبر 2012
    المشاركات:
    1,706
    عدد المعجبين:
    3,987
    الجنس:
    ذكر
    مكان الإقامة:
    Out there somewhere
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Lots of orange suits at work today on the right hand side of Seaward Way crossing nearest the station (as seen from the web cam)
     

مشاركة هذه الصفحة