If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

West Somerset Railway General Discussion

Rasprava u 'Heritage Railways & Centres in the UK' pokrenuta od gwr4090, 15. Studeni 2007..

  1. Robin Moira White

    Robin Moira White Resident of Nat Pres

    Pridružen(a):
    27. Travanj 2014.
    Poruka:
    11,404
    Lajkova:
    18,231
    Spol:
    Žena
    Interesi:
    Barrister
    Grad:
    Stogumber
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Best not to talk nonsense, then.
     
  2. Robin Moira White

    Robin Moira White Resident of Nat Pres

    Pridružen(a):
    27. Travanj 2014.
    Poruka:
    11,404
    Lajkova:
    18,231
    Spol:
    Žena
    Interesi:
    Barrister
    Grad:
    Stogumber
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    We will get to that.
     
  3. D7076

    D7076 Well-Known Member

    Pridružen(a):
    21. Prosinac 2007.
    Poruka:
    1,538
    Lajkova:
    691
    What rubbish .
    Replacement of bridge costs £400k and month of line closure .Do you replace in February when line has 5 days of half term traffic or the month of December and cancel all santa trains which net you 25% of annual income ?
    I know which any well run line would choose .
     
  4. MellishR

    MellishR Resident of Nat Pres Friend

    Pridružen(a):
    16. Travanj 2009.
    Poruka:
    8,911
    Lajkova:
    5,847
    Straw man? Or deliberately misunderstanding? Of course it matters whether you replace a bridge when the line is closed anyway or when you would otherwise be operating, but it makes minimal difference to the need for a large amount of money.
     
    JBTEvans se sviđa ovo.
  5. 35B

    35B Nat Pres stalwart

    Pridružen(a):
    18. Lipanj 2011.
    Poruka:
    28,729
    Lajkova:
    28,654
    Spol:
    Muškarac
    Grad:
    Grantham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    On the contrary, as the time taken to deal with Seaward Way has illustrated, when you do this work makes a significant difference to the company as a whole. And if that is when the line is busy, that means the cost goes up significantly because the cost of the job is not just the direct cost, but also the income foregone. I'd say @D7076 has it about right when considering what should happen and when.
     
  6. Bayard

    Bayard Well-Known Member

    Pridružen(a):
    26. Travanj 2015.
    Poruka:
    1,841
    Lajkova:
    3,904
    Spol:
    Muškarac
    Heritage Railway Volunteer:
    No I do not currently volunteer
    "Rail replacement service". One of the most depressing ways you can put three words together in the English language.
     
    green five, Copper-capped i 35B se sviđa ovo.
  7. Paulthehitch

    Paulthehitch Well-Known Member

    Pridružen(a):
    13. Veljača 2020.
    Poruka:
    1,090
    Lajkova:
    1,093
    Spol:
    Muškarac
    Grad:
    Hayling Island
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Can actually be quicker than the trains they replace.
     
  8. andrewtoplis

    andrewtoplis Well-Known Member

    Pridružen(a):
    28. Ožujak 2006.
    Poruka:
    1,419
    Lajkova:
    878
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    In the context of paying to go on a heritage railway though....it's pretty sub optimal!
     
  9. Paulthehitch

    Paulthehitch Well-Known Member

    Pridružen(a):
    13. Veljača 2020.
    Poruka:
    1,090
    Lajkova:
    1,093
    Spol:
    Muškarac
    Grad:
    Hayling Island
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Depends whether it is a leisure entertainment on offer or an aspiration to provide a public transport service. The sad truth is thar after the introduction of the heavy duty pneumatic tyre between the wars, yer av'rage branch line tended to be on life support.
     
  10. 35B

    35B Nat Pres stalwart

    Pridružen(a):
    18. Lipanj 2011.
    Poruka:
    28,729
    Lajkova:
    28,654
    Spol:
    Muškarac
    Grad:
    Grantham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    The irony of which, in this specific context, is not lost on many.
     
    Sheff, green five, Bluenosejohn i 2 ostalih se sviđa ovo.
  11. MellishR

    MellishR Resident of Nat Pres Friend

    Pridružen(a):
    16. Travanj 2009.
    Poruka:
    8,911
    Lajkova:
    5,847
    Yes of course, if infrastructure work prevents or restricts operation of trains for a prolonged period that loses more money. But the post that I was responding to cited replacement of a bridge occupying one month, either in or out of season. Even if that had to be done during the normal operating season, the loss of income from one month's operation would be a fraction of the direct cost of replacing the bridge. The WSR lost a whole season's income, and because of the level crossing, which I would expect to be a bit cheaper than a bridge.
     
    35B se sviđa ovo.
  12. JBTEvans

    JBTEvans Part of the furniture

    Pridružen(a):
    14. Veljača 2008.
    Poruka:
    2,597
    Lajkova:
    793
    Spol:
    Muškarac
    Grad:
    Casnewydd, De Cymru
    Heritage Railway Volunteer:
    No I do not currently volunteer
    :Chillout:
     
  13. JBTEvans

    JBTEvans Part of the furniture

    Pridružen(a):
    14. Veljača 2008.
    Poruka:
    2,597
    Lajkova:
    793
    Spol:
    Muškarac
    Grad:
    Casnewydd, De Cymru
    Heritage Railway Volunteer:
    No I do not currently volunteer
    How did they lose a whole season's operations? They provided a service to Minehead last year and didn't run in 2020 but neither did some other railways, including the commercially operated Vale of Rhediol, which is similar to the WSR in having a seaside location.

    The past is the past and let's move on, 11 days until trains roll in and out of MD with passengers on board.
     
    Snail368 se sviđa ovo.
  14. JBTEvans

    JBTEvans Part of the furniture

    Pridružen(a):
    14. Veljača 2008.
    Poruka:
    2,597
    Lajkova:
    793
    Spol:
    Muškarac
    Grad:
    Casnewydd, De Cymru
    Heritage Railway Volunteer:
    No I do not currently volunteer
    You've missed the point. Yes you would do it in a closed season and not in the summer or on the pre-Christmas run up, but the cost of replacing the bridge doesn't change whenever you do it, that needed fundraising. That was the point I was making.
     
  15. JBTEvans

    JBTEvans Part of the furniture

    Pridružen(a):
    14. Veljača 2008.
    Poruka:
    2,597
    Lajkova:
    793
    Spol:
    Muškarac
    Grad:
    Casnewydd, De Cymru
    Heritage Railway Volunteer:
    No I do not currently volunteer
    :Yawn:

    People go on like they scrapped 53808, burnt down Washford and ran a bus from Crowcombe to Minehead, jeeze, chill out guys.

    Crossing is replaced (which was a SCC project) and trains are back to normal again.
     
  16. JBTEvans

    JBTEvans Part of the furniture

    Pridružen(a):
    14. Veljača 2008.
    Poruka:
    2,597
    Lajkova:
    793
    Spol:
    Muškarac
    Grad:
    Casnewydd, De Cymru
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Such railway has changed the ownership structure of the carriages, and now a daily rate is paid everytime each carriage is used to pay for future repairs, plus plans to build a carriage shed with pieces of the jigsaw ongoing to get that to happen.

    That's future proofin'!

    Anyway, back to the lovely WSR...
     
  17. JBTEvans

    JBTEvans Part of the furniture

    Pridružen(a):
    14. Veljača 2008.
    Poruka:
    2,597
    Lajkova:
    793
    Spol:
    Muškarac
    Grad:
    Casnewydd, De Cymru
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Ah Brains SA, nice stuff. Dark is nice too. Rev James are good ales. Not had some in a while. ;)
     
  18. Ploughman

    Ploughman Part of the furniture

    Pridružen(a):
    1. Travanj 2008.
    Poruka:
    5,969
    Lajkova:
    2,761
    Interesi:
    Ex a lot of things.
    Grad:
    Near where the 3 Ridings meet
    Heritage Railway Volunteer:
    Yes I am an active volunteer

    The other factor to consider, is how much do you want to spend doing the work?
    Spend a lot and get the "Bridge or whatever" replaced in a weekend or spend less and take longer.

    Which would cause the least damage to the Bank Account in the long run?

    As an illustration take look at the Bluebell track renewal works.
    The plant in use will cost a lot but they get the job done with the least disturbance to the normal service.
     
    Jamessquared se sviđa ovo.
  19. ross

    ross Well-Known Member

    Pridružen(a):
    18. Svibanj 2017.
    Poruka:
    1,002
    Lajkova:
    2,477
    Spol:
    Muškarac
    Grad:
    Titfield
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Good, Quick, Cheap- choose any two
     
    Sheff se sviđa ovo.
  20. Cuckoo Line

    Cuckoo Line Member

    Pridružen(a):
    29. Kolovoz 2020.
    Poruka:
    373
    Lajkova:
    382
    Spol:
    Muškarac
    Grad:
    South West
    Heritage Railway Volunteer:
    No I do not currently volunteer
    You need the plant whatever way you do it and if you need to hire it probably cheaper to say hire for 2 -3 weeks than ad hoc days. But importantly see how other railways e.g. NYMR, Bluebell etc do a lot of preparatory work to minimise the time the railway is shut down. Also remember some of those lines do high income experiences during the off season.
     

Podijelite ovu stranicu