    Some good progress on GWR 216, the gas lighting system is being completed with pipe runs on the roof and lamps powered by LED lights being installed, and on the exterior the window frames are turning cherry red. The alarm chain run has been completed.

    regards

    Matt
     

    附件文件:

    已获得Gareth, Sheff, Johnme101另外6人的支持.
  2. Matt78

    Matt78 Well-Known Member

    注册日期:
    2007-06-27
    帖子:
    1,729
    支持:
    3,862
    职业:
    Solicitor
    所在地:
    South Wales
    Progress continues.
     

    附件文件:

    已获得Sheff, thb17, pevans945@btinternet.com另外2人的支持.
  3. Matt78

    Matt78 Well-Known Member

    注册日期:
    2007-06-27
    帖子:
    1,729
    支持:
    3,862
    职业:
    Solicitor
    所在地:
    South Wales
    After much work on the lighting system the pipe runs are now complete and work is in hand to erect the lamps in the compartments.
     

    附件文件:

    已获得Johnme101, Sheff, echap另外4人的支持.
  4. Matt78

    Matt78 Well-Known Member

    注册日期:
    2007-06-27
    帖子:
    1,729
    支持:
    3,862
    职业:
    Solicitor
    所在地:
    South Wales
    9396AB60-8FE6-4424-9521-968FA9B9BAF6.jpeg Photo by Josh Holmes
     
    Last edited by a moderator: 2022-03-07
    已获得Belgrade, Fireline, Matt37401另外20人的支持.
  5. Wagoniester

    Wagoniester Member

    注册日期:
    2017-11-30
    帖子:
    686
    支持:
    1,409
    性别:
    所在地:
    Essex
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    That is a cracking image!
     
  6. Matt78

    Matt78 Well-Known Member

    注册日期:
    2007-06-27
    帖子:
    1,729
    支持:
    3,862
    职业:
    Solicitor
    所在地:
    South Wales
    A milestone on GWR 216 as the lighting system is completed, the new glass globes have also been fitted to the gas lamps. In the meantime 1369 was also out today.

    regards

    Matt
     

    附件文件:

    已获得echap, Johnme101, brmp201另外4人的支持.
  7. MellishR

    MellishR Resident of Nat Pres Friend

    注册日期:
    2009-04-16
    帖子:
    8,912
    支持:
    5,849
    Do they now have LED innards like the Metropolitan coach?
     
  8. Matt78

    Matt78 Well-Known Member

    注册日期:
    2007-06-27
    帖子:
    1,729
    支持:
    3,862
    职业:
    Solicitor
    所在地:
    South Wales
    Yes, that’s correct. LED system designed and encased in original GWR lamps with new globes made to fit. The roof layout has mock “gas pipes” which run into original GWR pepper pot ventilators.
     

    附件文件:

    已获得Johnme101, Copper-capped, echap另外1人的支持.
  9. Matt78

    Matt78 Well-Known Member

    注册日期:
    2007-06-27
    帖子:
    1,729
    支持:
    3,862
    职业:
    Solicitor
    所在地:
    South Wales
    More progress on GWR 216 and repairs to the fence at Bronwydd.
     

    附件文件:

  10. Matt78

    Matt78 Well-Known Member

    注册日期:
    2007-06-27
    帖子:
    1,729
    支持:
    3,862
    职业:
    Solicitor
    所在地:
    South Wales
    More work on the vintage carriages. After 18 months they will now have to leave the shed next week to allow work on other vehicles but plans are in place to complete the outstanding works so they can enter traffic.

    Both carriages are planned to be turned out in plain chocolate and cream (post 1925 livery) with red bolections.

    regards

    Matt
     

    附件文件:

    已获得brmp201, Copper-capped, ghost另外3人的支持.
  11. Matt78

    Matt78 Well-Known Member

    注册日期:
    2007-06-27
    帖子:
    1,729
    支持:
    3,862
    职业:
    Solicitor
    所在地:
    South Wales
    All ready for the day’s services.
    Regards

    Matt
     

    附件文件:

  12. Matt78

    Matt78 Well-Known Member

    注册日期:
    2007-06-27
    帖子:
    1,729
    支持:
    3,862
    职业:
    Solicitor
    所在地:
    South Wales
    Well it has been a little while since the last post on this thread, but there are a few things in the pipeline in the next few months aside from the usual operations.

    on the steam front Haulwen’s chassis is being readied for shot blasting which should happen in the next few weeks. The boiler is being worked on at Flour Mill.

    carriage wise some of the MK1’s have been in the shed for roof repaints and other repairs. Work will hopefully restart on the vintage carriages shortly.

    On the P Way front the next project is to build the three way point which will control access to the yard at Abergwili Jtn. We are also gearing up for a start on the car park and access road into the Abergwili site which will be a big project and will include a start on the much anticipated carriage shed.

    Regards

    Matt
     
    已获得Gareth, mdewell, Johnme101另外8人的支持.
  13. Matt78

    Matt78 Well-Known Member

    注册日期:
    2007-06-27
    帖子:
    1,729
    支持:
    3,862
    职业:
    Solicitor
    所在地:
    South Wales
    Update

    work has now commenced in building the giant three way point, which requires 41 timbers! This switch is key to maximising the space available at Abergwili with the layout of the carriage shed in mind.

    GWR 216 has re-entered the carriage workshop for more work to the doors and drop lights.

    meanwhile 1369 comes out for washout after today with “Moorbarrow” taking over for a couple of weeks before “Oddities” day.

    regards

    Matt
     

    附件文件:

  14. Matt78

    Matt78 Well-Known Member

    注册日期:
    2007-06-27
    帖子:
    1,729
    支持:
    3,862
    职业:
    Solicitor
    所在地:
    South Wales
    More work on GWR 216, upholstery being fitted…

    regards

    Matt
     

    附件文件:

  15. thb17

    thb17 Member

    注册日期:
    2012-02-07
    帖子:
    289
    支持:
    267
    性别:
    职业:
    National Key account manager
    所在地:
    Ely
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Look nearly finished!!!
     
  16. Matt78

    Matt78 Well-Known Member

    注册日期:
    2007-06-27
    帖子:
    1,729
    支持:
    3,862
    职业:
    Solicitor
    所在地:
    South Wales
    getting there, still a bit left to do but the list is getting smaller.
     

    附件文件:

    已获得Bluenosejohn, Johnme101, 30854另外2人的支持.
  17. Matt78

    Matt78 Well-Known Member

    注册日期:
    2007-06-27
    帖子:
    1,729
    支持:
    3,862
    职业:
    Solicitor
    所在地:
    South Wales
    We held the Oddities day today with a few smaller visitors and both steam locos working. Meanwhile in the shed another milestone on GWR 216 as the last doors are fitted after repair, still some adjustment required.

    Photos credit - D Rees, D Murray and D Jones

    regards

    Matt
     

    附件文件:

    已获得Gareth, thb17, Johnme101另外2人的支持.
  18. Matt78

    Matt78 Well-Known Member

    注册日期:
    2007-06-27
    帖子:
    1,729
    支持:
    3,862
    职业:
    Solicitor
    所在地:
    South Wales
    Looking complete, next jobs are to carry on fitting out the compartments internally with upholstery and draught excluders.

    regards

    Matt
     

    附件文件:

    已获得Gareth, thb17, Bluenosejohn另外3人的支持.
  19. Matt78

    Matt78 Well-Known Member

    注册日期:
    2007-06-27
    帖子:
    1,729
    支持:
    3,862
    职业:
    Solicitor
    所在地:
    South Wales
    More progress, the door frames have been painted Indian red, compartments being upholstered and the seat bases and backs being installed. It’s all coming together, next step is to complete the beading on the outside.

    meanwhile 1369 is back in service after washout.

    regards

    Matt
     

    附件文件:

    已获得Gareth, Copper-capped, thb17另外4人的支持.
  20. Flying Phil

    Flying Phil Part of the furniture

    注册日期:
    2018-12-10
    帖子:
    3,018
    支持:
    6,319
    性别:
    所在地:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Thanks Matt78 for keeping us up to date with your reports and photographs, they are appreciated.
     