If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

30777 to be overhauled

Dieses Thema im Forum 'Steam Traction' wurde von 5944 gestartet, 22 Juli 2020.

  1. 30854

    30854 Resident of Nat Pres

    Registriert seit:
    8 März 2017
    Beiträge:
    12.172
    Zustimmungen:
    11.496
    Geschlecht:
    männlich
    Beruf:
    Retired
    Ort:
    Brighton&Hove
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Not interested in the insurance inspector's gig then, Simon? ;)
     
  2. goldfish

    goldfish Nat Pres stalwart

    Registriert seit:
    13 Januar 2009
    Beiträge:
    16.157
    Zustimmungen:
    14.426
    HEALTH AND SAFETY GONE MAD!!!!
     
    30854 und John Merry gefällt dies.
  3. Dunfanaghy Road

    Dunfanaghy Road Well-Known Member

    Registriert seit:
    9 Oktober 2019
    Beiträge:
    1.401
    Zustimmungen:
    1.772
    Geschlecht:
    männlich
    Beruf:
    Retired
    Ort:
    Alton, Hants
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Tightening up of clearances has been going for - well, since forever. The LSWR loading gauge was less restrictive than the BoT in the platform area, so clearance had to reduce. A major mistake, IMHO, as it is the lower half of the loading gauge where GB differs most from UIC*. (Probably for the same reason as the decision to continue with Vacuum brake, rather than Air - All Too Difficult.)
    Pat
    *As a freighty I'm more interested in the restrictions on freight vehicles which in many cases is due to platform and underbridge clearance.
     
    Wenlock gefällt dies.
  4. S.A.C. Martin

    S.A.C. Martin Part of the furniture

    Registriert seit:
    31 August 2010
    Beiträge:
    5.615
    Zustimmungen:
    9.418
    Geschlecht:
    männlich
    Beruf:
    Asset Engineer (Signalling), MNLPS Treasurer
    Ort:
    London
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I didn’t say that.

    Both inform the other, and other laws and acts including accessibility inform the whole.

    As always, it’s a balancing act.
     
    jnc gefällt dies.
  5. MellishR

    MellishR Resident of Nat Pres Friend

    Registriert seit:
    16 April 2009
    Beiträge:
    8.911
    Zustimmungen:
    5.847
    Does that mean that sliding doors are less safe than hinged ones?
     
  6. Ploughman

    Ploughman Part of the furniture

    Registriert seit:
    1 April 2008
    Beiträge:
    5.969
    Zustimmungen:
    2.761
    Beruf:
    Ex a lot of things.
    Ort:
    Near where the 3 Ridings meet
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    When the Eurostars wre cleared for use on KX - Leeds runs, our office had been tasked with carrying out the realignments through the station platforms between Doncaster and Leeds.
    On one particular platformwe had to slew the track away from the platform about 100 - 150mm due to the centrethrow f the stock.
    Now imagine the commuters on the next days train to Leeds faced with an additional wide step to get on their train.
    That was down to a Railtrack design scheme.
     
  7. S.A.C. Martin

    S.A.C. Martin Part of the furniture

    Registriert seit:
    31 August 2010
    Beiträge:
    5.615
    Zustimmungen:
    9.418
    Geschlecht:
    männlich
    Beruf:
    Asset Engineer (Signalling), MNLPS Treasurer
    Ort:
    London
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    There seems to be a desire to point the finger, as it were, without considering all the facts.

    In the round, it is plain that old railway infrastructure and a mixture of rolling stock across ages will create anomalies in the desired output: which is train, track and platform interface in harmony to agreed standards (which as time goes on, gets updated).

    It is not possible to get complete harmony sometimes, so derogations are given where changes cannot be made to meet the railway group standard/act of parliament/level crossing act/etc

    This has been the case for decades and almost everything is on a case by case basis.

    It is easier to design and build new (e.g. hs2) to achieve the standards as the mix of rolling stock will not likely occur. The compromises happen where mixes of trains and older infrastructure interfaces happen.

    The Japanese and Chinese have the right idea - their high speed systems are strictly high speed trains only and there is no crossover or sharing of the track with old rolling stock.

    At the end of the day, companies like Network Rail are here to run a service for their customers. They’ve been flexible in the past- likely will continue to do so - we criticize their approach as steam enthusiasts at our peril, as they would be well within their rights to turn around and stop it completely where steam is concerned.

    Gauging is only one aspect of an entire systems engineering approach, after all.
     
    MellishR, jnc und Bluenosejohn gefällt dies.
  8. Jimc

    Jimc Part of the furniture

    Registriert seit:
    8 September 2005
    Beiträge:
    4.117
    Zustimmungen:
    4.821
    Beruf:
    Once computers, now part time writer I suppose.
    Ort:
    SE England
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I believe overall passenger injuries are down, but everything has disadvantages as well as advantages, and of course its sensible to address the disadvantages.
     
  9. D1039

    D1039 Guest

    There’s rolling stock policy? Stadler are delivering FLIRTs with low floors, Hitachi are delivering 8xx with high floors to allow space underneath for engines. Hitachi are 26m long, FLIRTs 16 or 21 and have articulation.

    Reverse that and you find NR setting parameters around what exists, with manufacturers saying “this isn’t compatible with our FLIRT/AT etc rolling stock platform and we’d have to bespoke it (more), and it will take longer/ increase the price”. East Midlands’ Hitachi 802 > 810 redesign means that what would have been a straightforward follow on order is taking 4 years to reach service

    Patrick


    Sent from my iPhone using Tapatalk
     
  10. Hirn

    Hirn Member

    Registriert seit:
    11 August 2015
    Beiträge:
    512
    Zustimmungen:
    320
    Geschlecht:
    männlich
    (In practical use and you have a loco boiler to run an ejector from, vacuum is a better brake than Westinghouse - handier and more reliable, therefore safer - this can be mitigated with two pipes along the train but that was never general in steam days.
    Vacuum brakes were used in the USA on the three foot gauge and the elevated railroads - both with little through running with other railways and the latter with lots of stops. Also extensively used at the same time on the Continent.)
     
  11. Flying Phil

    Flying Phil Part of the furniture

    Registriert seit:
    10 Dezember 2018
    Beiträge:
    3.018
    Zustimmungen:
    6.318
    Geschlecht:
    männlich
    Ort:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    All the cladding has been removed and some work has been done inside the boiler. It has had an inspection and "50 copper side stays together with lots of foundation ring and other steel rivets" will need replacing (according to Main Line #190). As it is the locomotives 100th birthday in 2025(24?) I'm sure it will be finished well before then.
     
    John Petley, green five und S.A.C. Martin gefällt dies.
  12. Flying Phil

    Flying Phil Part of the furniture

    Registriert seit:
    10 Dezember 2018
    Beiträge:
    3.018
    Zustimmungen:
    6.318
    Geschlecht:
    männlich
    Ort:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Work continues inside the boiler with replacing of rivets and side stays. Not an easy job with an oxy/fuel (Acetylene or Propane?) torch inside the firebox!
     
    Richard Roper gefällt dies.
  13. Dunfanaghy Road

    Dunfanaghy Road Well-Known Member

    Registriert seit:
    9 Oktober 2019
    Beiträge:
    1.401
    Zustimmungen:
    1.772
    Geschlecht:
    männlich
    Beruf:
    Retired
    Ort:
    Alton, Hants
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Only just noticed this - not paying attention at the back!
    Superficially, vacuum is a simpler and therefore better brake. (It was certainly claimed to use less steam than Westinghouse.)
    But as the railways have developed vacuum's limitations became more obvious. Firstly, it is less effective at the end of a long train (problem for US standard gauge lines). Second, its pressure differential of 10 lb/in² against atmosphere at sea level makes it very unattractive in the mountains (Alps, Rockies, Andes, &c.). Thirdly, it is very much less capable for applying brake force in proportion to loaded weight. The latter is less of a problem on a passenger system, but a big deal in freight. It was a bit of luck for AB-equipped lines that changing from steam to diesel or electric was relatively easy - after all the locos needed compressors for air supply on the loco anyway.
    Pat
     
    MellishR gefällt dies.
  14. 8126

    8126 Member

    Registriert seit:
    17 März 2014
    Beiträge:
    830
    Zustimmungen:
    974
    Geschlecht:
    männlich
    I beg to differ on one small point. Phillipson (Steam locomotive design: data and formulae) estimated that a vacuum ejector used three times as much steam as an air pump in comparable applications. This isn't particularly surprising; although a vacuum ejector has the virtue of great mechanical simplicity with very few moving parts, creating vacuum tends to be fairly inefficient compared to compressing air, and the small ejector runs constantly.
     
    MellishR, Jamessquared und Sheff gefällt dies.
  15. Jimc

    Jimc Part of the furniture

    Registriert seit:
    8 September 2005
    Beiträge:
    4.117
    Zustimmungen:
    4.821
    Beruf:
    Once computers, now part time writer I suppose.
    Ort:
    SE England
    Heritage Railway Volunteer:
    No I do not currently volunteer
    In 'Swindon Steam' Ken Cook (ex WR and LNE CMWE in BR days) states that a committee was set up at the grouping to decide on whether to standardise on Westinghouse or vacuum, and that the Westinghouse used appreciably less steam, although the GWR setup with vacuum pump rather than small ejector ran it fairly close.
     
  16. Dunfanaghy Road

    Dunfanaghy Road Well-Known Member

    Registriert seit:
    9 Oktober 2019
    Beiträge:
    1.401
    Zustimmungen:
    1.772
    Geschlecht:
    männlich
    Beruf:
    Retired
    Ort:
    Alton, Hants
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I wish I could recall where I saw the bit about steam consumption.
    In Don Bradley's 'LSWR Locomotives: The Adams Classes' he quotes results of trials with both Automatic Vacuum and Westinghouse brakes. 2 engines each were fitted with the brakes:
    The 2 with AV worked a total of 3,685 miles between them "Effective, reliable, simple operation, £4 6s 10d maintenance, no failures".
    The 2 with Westinghouse brake worked a total of 4,490 miles between them "Strong and rapid acting, £21 6s 5d maintenance, three failures with burst pipes, two with defective pumps".
    Not hard to see how a Victorian railway plumped for vacuum! Still a shame , taking the long view, though.
    Pat
     
    Wenlock gefällt dies.
  17. MellishR

    MellishR Resident of Nat Pres Friend

    Registriert seit:
    16 April 2009
    Beiträge:
    8.911
    Zustimmungen:
    5.847
    Would posts #53 to #56 be better in the Mutual Improvement section?
     
  18. Bill2

    Bill2 New Member

    Registriert seit:
    14 August 2020
    Beiträge:
    131
    Zustimmungen:
    295
    Geschlecht:
    männlich
    Ort:
    Wilmslow
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Webb on the LNWR also ran trials between trains equipped with the automatic vacuum and air brakes (and, like Adams, with the simple vacuum brake as well) and got the same answer in that the air brake was more expensive to maintain and suffered a number of failures. Note, however, that neither of these engineers commented on the performance of the brake itself, whereas Stroudley on the Brighton stated that he chose the air brake because it gave the best performance during the Newark brake trials.
     
  19. Jamessquared

    Jamessquared Nat Pres stalwart

    Registriert seit:
    8 März 2008
    Beiträge:
    27.790
    Zustimmungen:
    64.453
    Ort:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    In that light, I’ve always found it interesting that of the three companies around London who standardised on air brakes, all three had very intensive suburban passenger traffic. (LBSCR, LCDR, GER). In the LCDR case at least, they evidently found the benefits outweighed the additional licensing costs, despite their general status as a somewhat impecunious company.

    Tom
     
    Bluenosejohn, Wenlock, 35B und 2 anderen gefällt dies.
  20. 30854

    30854 Resident of Nat Pres

    Registriert seit:
    8 März 2017
    Beiträge:
    12.172
    Zustimmungen:
    11.496
    Geschlecht:
    männlich
    Beruf:
    Retired
    Ort:
    Brighton&Hove
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Ditto the Isle of Wight's pre-grouping lines (partially excepting the FYNR, who managed to use both systems!).
     
    Bluenosejohn gefällt dies.

Die Seite empfehlen