If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Swanage Railway General Discussion

本贴由 Rumpole2012-10-10 发布. 版块名称: Heritage Railways & Centres in the UK

  1. twr12

    twr12 Well-Known Member

    注册日期:
    2007-09-02
    帖子:
    1,658
    支持:
    820
    Swanage Railway has two engineering apprentices, both started in September 2021.
    One is a mechanical fitter on steam locos and occasionally diesel shunters; the other is a machinist, who is also learning fitting work.
     
    已获得SunnieboyPaul4280104的支持.
  2. 80104

    80104 Member

    注册日期:
    2020-11-19
    帖子:
    725
    支持:
    481
    所在地:
    a small town in germany
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Thanks for the update and pleased to hear of this progress.

    I follow the news on both the Swanagerailway.co.uk and Swanagerailwaytrust.org.uk websites but there was no mention of this.
     
    Last edited: 2022-04-14
  3. Paul42

    Paul42 Part of the furniture

    注册日期:
    2006-07-17
    帖子:
    6,093
    支持:
    4,465
    性别:
    所在地:
    East Grinstead
    Screenshot_20220414-211627.png
     
    已获得Johnme101, 30854, Matt37401另外1人的支持.
  4. gz3xzf

    gz3xzf Member

    注册日期:
    2006-07-22
    帖子:
    318
    支持:
    77
    性别:
    职业:
    Retired
    所在地:
    21C142
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    80104
    I would also keep an eye out for Swanning Around it is a volunteer produced newsletter giving a look at what's happening around the Swanage Railway that is available to the public.
    https://www.srstaff.co.uk/swanningaround/index.php
     
  5. DcB

    DcB Well-Known Member

    注册日期:
    2018-06-05
    帖子:
    1,487
    支持:
    455
    所在地:
    Surrey
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I could not find any mention on a websearch other than the job ads.
    Good the SR is investing in the future to keep knowledge required for the running of steam trains.
    Hope they are well looked after and qualify in about 3 or 4 years time.
     
  6. DcB

    DcB Well-Known Member

    注册日期:
    2018-06-05
    帖子:
    1,487
    支持:
    455
    所在地:
    Surrey
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I see The Southener" has posted a video about Manston and 30053 in the workshop.
     
    已获得Johnme1013ABescotSunnieboy的支持.
  7. buzby2

    buzby2 Well-Known Member

    注册日期:
    2009-03-26
    帖子:
    1,712
    支持:
    586
    所在地:
    Swanage
    Most unlikely that the current engineering base at Herston Works would get planning permission for boiler work to be undertaken.
    It has adjacent offices and other businesses as well as local residents within a few hundred yards. I suspect they would not take kindly to riveting and other noisy boiler work.
    I believe the SVR at Bridgnorth do not have neighbours as close as at Herston but still had to upgrade their previously outdoors boiler work by building the specialist George William Knight Boiler Repair Shop at no little expense.
    There is presently no space that I know of, on Swanage Industrial Estate, that we could rent from the local authority near to Herston Works.
     
    已获得Sunnieboy的支持.
  8. M59137

    M59137 Well-Known Member

    注册日期:
    2009-09-23
    帖子:
    1,389
    支持:
    2,356
    性别:
    职业:
    Carriage & Wagon
    所在地:
    Sheringham
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    D6515 looks fantastic - one of Swanage Railway's jewels in the crown!

    Sent from my moto g(8) power using Tapatalk
     
  9. 30854

    30854 Resident of Nat Pres

    注册日期:
    2017-03-08
    帖子:
    12,172
    支持:
    11,496
    性别:
    职业:
    Retired
    所在地:
    Brighton&Hove
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Just a thought, but how many fully equipped boiler shops do UK heritage lines have already and how many do they actually need between them?
     
  10. mdewell

    mdewell Well-Known Member Friend

    注册日期:
    2005-03-23
    帖子:
    1,925
    支持:
    2,999
    职业:
    UK & Ireland Heritage Railways Webmaster
    所在地:
    Ruabon, Wrexham
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I should think the difficulty in trying to count them will depend upon your definition of 'fully equipped'. Most railways could probably handled retubing and new stays, but replacement of large sections of plating and/or foundation ring would be a different matter.
     
  11. 30854

    30854 Resident of Nat Pres

    注册日期:
    2017-03-08
    帖子:
    12,172
    支持:
    11,496
    性别:
    职业:
    Retired
    所在地:
    Brighton&Hove
    Heritage Railway Volunteer:
    No I do not currently volunteer
    True. This comes purely from a pleb's PoV, but I was thinking anything much beyond a retube (would that include superheater elements?). I'd imagine changing firebars, or reseating the odd fitting is almost as routine as washing out. Less so new throatplate, foundation ring, stays or barrel section.
     
  12. Steve

    Steve Resident of Nat Pres Friend

    注册日期:
    2006-10-07
    帖子:
    12,729
    支持:
    11,847
    职业:
    Gentleman of leisure, nowadays
    所在地:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Off the top of my head the following will do major boiler work:
    NYMR
    SVR
    Bluebell
    WCRC
    NNR
    SDR
    Isreal Newton
    Ian Riley
    Northern Steam engineering
    Heritage Boiler Services
    Locomotive Maintenance Services
    Crewe

    No doubt there are others.
     
    已获得Johnme101Jamessquared的支持.
  13. Jamessquared

    Jamessquared Nat Pres stalwart

    注册日期:
    2008-03-08
    帖子:
    27,793
    支持:
    64,458
    所在地:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The Flour Mill could be added to that list too.

    Tom
     
  14. ady

    ady Well-Known Member

    注册日期:
    2006-07-04
    帖子:
    2,375
    支持:
    285
    性别:
    职业:
    Post office
    所在地:
    South
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Mid hants have a boiler shop too
     
  15. DcB

    DcB Well-Known Member

    注册日期:
    2018-06-05
    帖子:
    1,487
    支持:
    455
    所在地:
    Surrey
    Heritage Railway Volunteer:
    No I do not currently volunteer
    NNR seem to very capable and have a contract to overhaul a boiler from Switzerland.
    They have finished Sidmouth's boiler which is sadly going to Sir Keith Park instead for the SVR.
    A websearch gives Swanning around showing 30053's boiler being worked on in 2019 at the NNR. Yet 3 years later still to be completed?.
     
  16. DcB

    DcB Well-Known Member

    注册日期:
    2018-06-05
    帖子:
    1,487
    支持:
    455
    所在地:
    Surrey
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Maybe the NNR contract for the 30053 boiler did not specify an end date?
     
    Last edited: 2022-04-20
  17. 80104

    80104 Member

    注册日期:
    2020-11-19
    帖子:
    725
    支持:
    481
    所在地:
    a small town in germany
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I would argue that boiler smithing is a core competency and given the annual mileage SR run (number of steam locos utilised) should therefore be "in house".

    Out sourcing such an activity means that SR are hostage to fortune. Reading through various HR newsletters etc over the years seems to indicate that lengthy waits for the return of out sourced boilers seems to be a common occurrence.
     
  18. ghost

    ghost Part of the furniture

    注册日期:
    2006-05-29
    帖子:
    4,303
    支持:
    5,727
    性别:
    所在地:
    N.Ireland
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Could you explain why it is sad that Sidmouth's boiler is going to keep SKP running? Sidmouth is years from being ready to receive a boiler, so is it not a better idea to keep SKP running and earning money to pay for Sidmouth's restoration?
    Regarding 30053, there could be technical difficulties, unplanned extra expenditure, supplier issues etc. It is unwise to blame (or imply blame on) the NNR
     
    已获得ShaggySpitfireMatt37401的支持.
  19. Jamessquared

    Jamessquared Nat Pres stalwart

    注册日期:
    2008-03-08
    帖子:
    27,793
    支持:
    64,458
    所在地:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Perennial problem of outsourcing versus doing work in house. One important point is that if you outsource, it doesn't remove the requirement to have sufficient skills and knowledge to both specify, and oversee, the work being carried out on the railway's behalf. As an example, if you send a boiler to the NNR for repair, that is a really long day out from Swanage to go and inspect the work, possibly two days with an overnight stay; and you may well be needing to do that monthly. That's a not inconsiderable overhead. The Llangollen / Patriot saga is an illustration of the importance of needing a proper quality control process in place if you outsource work. Of course, you still need quality control if you do it in house, but the logistics are easier, and also potentially you can go through the query / discussion / decision cycle more rapidly when issues arise.

    Tom
     
    已获得Steve的支持.
  20. 35B

    35B Nat Pres stalwart

    注册日期:
    2011-06-18
    帖子:
    28,732
    支持:
    28,659
    性别:
    所在地:
    Grantham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    But the flip side of that is that maintaining the capacity in house requires a consistent workload to keep the staff (paid or volunteer) gainfully employed, plus a level of investment in ensuring that the skills remain current and do not degrade. Reading between the lines, Llangollen also shows how a railway can be vulnerable to that degrading effect in house if not managed properly effectively.

    I would be interested to know how many in house boiler repairs are also delayed, but not reported on in the same way because of different expectations.

    There is no right answer here, and the trade off will vary for different places at different times. Pity the poor boards of trustees and directors having to make these decisions about where to allocate their limited resources.
     

分享此页面