If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

BR Standard class 6 No. 72010 'Hengist' and Clan Discussion Thread

الموضوع في 'Steam Traction' بواسطة Bulleid Pacific, بتاريخ ‏23 نوفمبر 2009.

  1. ianh1

    ianh1 Member

    إنضم إلينا في:
    ‏10 ماي 2018
    المشاركات:
    230
    عدد المعجبين:
    719
    الجنس:
    ذكر
    مكان الإقامة:
    Cumbria
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    No, not yet. We continue to make enquiries about this. The good news is that lack of the springs does not hold up progress with the bogie as they can be fitted at any time.
     
    Sheff و ross معجبون بهذا.
  2. Steve

    Steve Resident of Nat Pres Friend

    إنضم إلينا في:
    ‏7 اكتوبر 2006
    المشاركات:
    12,729
    عدد المعجبين:
    11,847
    الوظيفة:
    Gentleman of leisure, nowadays
    مكان الإقامة:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I suppose it would be theoretically possible to mill the required trapezoidal section from rod but the problem would be in finding a machine that could accommodate the length of bar required. Has that avenue been investigated?
     
  3. Dave Williams

    Dave Williams New Member

    إنضم إلينا في:
    ‏29 مارس 2021
    المشاركات:
    23
    عدد المعجبين:
    26
    الجنس:
    ذكر
    مكان الإقامة:
    Devon
    Heritage Railway Volunteer:
    Yes I am an active volunteer
  4. ianh1

    ianh1 Member

    إنضم إلينا في:
    ‏10 ماي 2018
    المشاركات:
    230
    عدد المعجبين:
    719
    الجنس:
    ذكر
    مكان الإقامة:
    Cumbria
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    We don't think that producing the trapezoidal section would be much of a problem. The stumbling block seems to be forming of the coil. A company in Rochdale used to have the formers for rectangular section coil springs but disposed of them some time ago. One spring company we discussed it with were concerned about the time that the bar would be out of the furnace while the coil was formed, i.e. the bar would cool down before the coil was finished
     
  5. northernsteam

    northernsteam Member

    إنضم إلينا في:
    ‏25 ماي 2010
    المشاركات:
    609
    عدد المعجبين:
    297
    الجنس:
    ذكر
    الوظيفة:
    Used to be in civil engineering, highway bridges.
    مكان الإقامة:
    Tyne and Wear
    Heritage Railway Volunteer:
    No I do not currently volunteer
    It is good to see the continuing progress in both small and large parts, everything is coming together slowly and carefully.
    I hope there is an Open Day soon so folk can see the actual progress.
     
  6. ianh1

    ianh1 Member

    إنضم إلينا في:
    ‏10 ماي 2018
    المشاركات:
    230
    عدد المعجبين:
    719
    الجنس:
    ذكر
    مكان الإقامة:
    Cumbria
    Heritage Railway Volunteer:
    Yes I am an active volunteer
  7. Hermod

    Hermod Well-Known Member

    إنضم إلينا في:
    ‏6 ماي 2017
    المشاركات:
    1,109
    عدد المعجبين:
    317
    الجنس:
    ذكر
    مكان الإقامة:
    Klitmoeller,Denmark
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Can the completed spring be machined from solid and why not?
     
  8. osprey

    osprey Resident of Nat Pres

    إنضم إلينا في:
    ‏3 اكتوبر 2007
    المشاركات:
    10,493
    عدد المعجبين:
    2,850
    الوظيفة:
    semi-retired, currently doing R&D for my patents
    مكان الإقامة:
    Halifax
    I don't think so..springs aren't made like that..all sorts of reasons ..grain flow..column stiffness...et al...
     
    Gareth, Sheff و LMS2968 معجبون بهذا.
  9. ianh1

    ianh1 Member

    إنضم إلينا في:
    ‏10 ماي 2018
    المشاركات:
    230
    عدد المعجبين:
    719
    الجنس:
    ذكر
    مكان الإقامة:
    Cumbria
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    We did approach a company in Worcestershire about machining the springs from solid. The price was very high. We were worried about machining marks being stress raisers and asked them how they would tackle that. Nothing heard
     
  10. osprey

    osprey Resident of Nat Pres

    إنضم إلينا في:
    ‏3 اكتوبر 2007
    المشاركات:
    10,493
    عدد المعجبين:
    2,850
    الوظيفة:
    semi-retired, currently doing R&D for my patents
    مكان الإقامة:
    Halifax
    I've jumped in here with both feet. I have not followed this project in detail so the spring subject intrigued me and now see where we are coming from. I didn't realise this design featured this type of spring on the front bogie. I'm not surprised you're having difficulty scourcing these here, have you tried the USA? Just a thought...
     
    Last edited: ‏20 إبريل 2022
  11. ianh1

    ianh1 Member

    إنضم إلينا في:
    ‏10 ماي 2018
    المشاركات:
    230
    عدد المعجبين:
    719
    الجنس:
    ذكر
    مكان الإقامة:
    Cumbria
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Oh yes! We approached a number of companies in the USA including one that proudly proclaimed that they could manufacture any spring. We sent them the details and they responded by saying - they couldn't.
     
    Gareth, Richard Roper, Bluenosejohn و 1 شخص آخر معجبون بهذا.
  12. osprey

    osprey Resident of Nat Pres

    إنضم إلينا في:
    ‏3 اكتوبر 2007
    المشاركات:
    10,493
    عدد المعجبين:
    2,850
    الوظيفة:
    semi-retired, currently doing R&D for my patents
    مكان الإقامة:
    Halifax
    Well I'm afraid I've been out of engineering now for some years having "retired" so I'm a bit out of touch. Forgive me if I'm teaching you to suck eggs, as it were, have you tried India? There are some quite good engineers out there..finding the right one though..all I can say is keep trying. I suppose using an alternative method will need reapproval?
     
  13. ianh1

    ianh1 Member

    إنضم إلينا في:
    ‏10 ماي 2018
    المشاركات:
    230
    عدد المعجبين:
    719
    الجنس:
    ذكر
    مكان الإقامة:
    Cumbria
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    We did try firms in India without success - there is probably someone out there who can do it but its a matter of finding them. We do have an alternative design of inner/outer round section coil springs but that will need Vampire testing. The last time we checked, the cost was around £20,000. Here's what the P2 Group had to do https://www.p2steam.com/design-study/ - scroll down to "Vampire".

    If you have a look at

    https://www.theclanproject.org/build/Clan_BuildTopic.php?topic=BWA&description=Front Bogie

    you can see the alternative design

    If anyone wants to help us find a supplier for these springs, we'd be very grateful. We can provide drawings and spring data.
     
    أعجب بهذه المشاركة Bluenosejohn
  14. std tank

    std tank Part of the furniture

    إنضم إلينا في:
    ‏20 سبتمبر 2005
    المشاركات:
    3,927
    عدد المعجبين:
    1,070
    الجنس:
    ذكر
    الوظيفة:
    Retired
    مكان الإقامة:
    Liverpool
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Have you assessed the round section side control springs as fitted to the Royal Scot class 46100 to 46170. The drawing No. is D53-21821. It is in the NRM drawings archive. Also, at least one Stanier Class 5 currently being overhauled has been fitted with double spring round section bogie side control springs. Contact NYMR loco department about this.
     
  15. ianh1

    ianh1 Member

    إنضم إلينا في:
    ‏10 ماي 2018
    المشاركات:
    230
    عدد المعجبين:
    719
    الجنس:
    ذكر
    مكان الإقامة:
    Cumbria
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Wheelsets and suspension are considered to be critical items and our Assessment Body is looking closely at this area. So any changes to the design (which for all BR standard 4 wheel bogies used a rectangular section springs) would require Vampire testing. Does the NYMR Class operate on the main line?
     
  16. std tank

    std tank Part of the furniture

    إنضم إلينا في:
    ‏20 سبتمبر 2005
    المشاركات:
    3,927
    عدد المعجبين:
    1,070
    الجنس:
    ذكر
    الوظيفة:
    Retired
    مكان الإقامة:
    Liverpool
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    As rectangular section springs are clearly no longer available, you have no option other than to use a design of round section springs. May I recommend that the two pairs of short springs are done away with and just two long springs are designed and put through Vampire testing. I have already given you one example of a BR modification from rectangular to round section springs in the Royal Scot class. Perhaps you could assess that for starters.
     
  17. Kylchap

    Kylchap Member

    إنضم إلينا في:
    ‏15 ديسمبر 2015
    المشاركات:
    492
    عدد المعجبين:
    935
    الجنس:
    ذكر
    مكان الإقامة:
    East Anglia
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Anyone know why rectangular section springs were used, apart from maybe making best use of space? As a non-engineer I'm guessing that a circular coiled spring would have a uniform curvature throughout its length and that the load placed upon it would be spread evenly along the length of the spring material. A rectangular spring would suffer greater stress at the corners where the curvature is tighter, thus more likely to fail. Just a hunch, I'm happy to be told I'm talking nonsense.
     
  18. ilvaporista

    ilvaporista Part of the furniture

    إنضم إلينا في:
    ‏16 يناير 2006
    المشاركات:
    4,356
    عدد المعجبين:
    5,455
    الجنس:
    ذكر
    الوظيفة:
    C.Eng
    مكان الإقامة:
    On the 45th!
    I did some work with Royal Spring Company in Bengal a few years ago for truck springs. I think they also did railway springs but no idea if the do trapezoidal. Usually in India if you talk of a low production volume they lose interest. Then when you talk quality standards and you see head wobbling you know you are in trouble. I have not been following suspension parts for a while now so the world may well have moved on. I won't mention Russia....
     
  19. Jamessquared

    Jamessquared Nat Pres stalwart

    إنضم إلينا في:
    ‏8 مارس 2008
    المشاركات:
    27,793
    عدد المعجبين:
    64,457
    مكان الإقامة:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    OK, I might be missing something here - but I assumed what was being discussed was a coil spring, but in which the cross-section of the bar that forms it is square (or rather, a trapezoid that ends up square when coiled up). I didn't think they meant a square that was literally square, i.e. with 90 degree corners?

    In other words, they are trying to make this:

    [​IMG]

    Not this:

    [​IMG]

    Have I got that right?

    Tom
     
    أعجب بهذه المشاركة Richard Roper
  20. std tank

    std tank Part of the furniture

    إنضم إلينا في:
    ‏20 سبتمبر 2005
    المشاركات:
    3,927
    عدد المعجبين:
    1,070
    الجنس:
    ذكر
    الوظيفة:
    Retired
    مكان الإقامة:
    Liverpool
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    No Tom. Have a look at the side control springs on the bogie of one of the Standard 4 2-6-4 tanks you have at the Bluebell. The springs are rectangular section.
     
    أعجب بهذه المشاركة 32110

مشاركة هذه الصفحة