4555 Damage at South Devon?

Rasprava u 'Steam Traction' pokrenuta od Jimc, 4. Svibanj 2022..

  1. Jimc

    Jimc Part of the furniture

    Pridružen(a):
    8. Rujan 2005.
    Poruka:
    4,117
    Lajkova:
    4,821
    Interesi:
    Once computers, now part time writer I suppose.
    Grad:
    SE England
    Heritage Railway Volunteer:
    No I do not currently volunteer
    This has surfaced on the dreaded Facebook. There are videos of her in service on May 2nd, so presumably happened later that day or since.

    [The image has now been deleted or restricted on Facebook]
    [​IMG]
     
    Last edited: 8. Svibanj 2022.
  2. Wagoniester

    Wagoniester Member

    Pridružen(a):
    30. Studeni 2017.
    Poruka:
    686
    Lajkova:
    1,409
    Spol:
    Muškarac
    Grad:
    Essex
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    My initial thought is: "Well I hope nobody got hurt when that happened!"
     
  3. martin1656

    martin1656 Nat Pres stalwart Friend

    Pridružen(a):
    8. Prosinac 2014.
    Poruka:
    19,263
    Lajkova:
    12,515
    Spol:
    Muškarac
    Grad:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    What on earth happened :( heavy shunt ?
     
  4. 8126

    8126 Member

    Pridružen(a):
    17. Ožujak 2014.
    Poruka:
    830
    Lajkova:
    974
    Spol:
    Muškarac
    Well that doesn't look very nice, I'm sure buffer beams shouldn't point downwards like that. Could this be an occasion where the Churchward-type extension frames at least keep damage localised (trying to look on the positive side)? Other than the platework damage, that is.
     
  5. Jimc

    Jimc Part of the furniture

    Pridružen(a):
    8. Rujan 2005.
    Poruka:
    4,117
    Lajkova:
    4,821
    Interesi:
    Once computers, now part time writer I suppose.
    Grad:
    SE England
    Heritage Railway Volunteer:
    No I do not currently volunteer
  6. brennan

    brennan Member

    Pridružen(a):
    11. Rujan 2016.
    Poruka:
    408
    Lajkova:
    452
    Grad:
    Gloucester
    Heritage Railway Volunteer:
    No I do not currently volunteer

    This demonstrates the effectiveness of the Churchward Energy Absorbing Front End. I'm not aware that a patent was taken out but clearly Swindon was well in advance of the motor industry in providing this safety feature.
     
  7. used2be

    used2be New Member

    Pridružen(a):
    8. Studeni 2021.
    Poruka:
    64
    Lajkova:
    29
    Spol:
    Muškarac
    Grad:
    u.k.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    let us hope all the people involved are O.K.

    Has the one buffer taken the full impact ?
    Has the step contacted the cylinder cover ?
    Looks like the steam pipe has been bent and the central plate of the front framing buckled up.
     
  8. Simon Smith

    Simon Smith New Member

    Pridružen(a):
    23. Veljača 2022.
    Poruka:
    122
    Lajkova:
    84
    Grad:
    South West
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    It is an unfortunate event but incidents like this seem to be occurring more and more.

    Only a couple of weeks ago the Black 5 at the NYMR hit the buffer stops at Whitby and ended up with the train being impounded by NR.

    Hopefully no one was injured in either event.
     
  9. Lord Belborough

    Lord Belborough New Member

    Pridružen(a):
    12. Siječanj 2022.
    Poruka:
    83
    Lajkova:
    148
    Spol:
    Muškarac
    Grad:
    Berkshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I was surprised last year at one steam gala which had a visiting steam loco very different to anything on their fleet when I asked the driver if he was from the visiting steam loco's railway to be told that he was a driver on the hosting line and that the hired loco came with an A4 folder of instructions. Surely stopping distances and performance need some degree of extra training? On the big railway it takes months to be trained up on new fleets. I realise speeds on heritage railways are lower but this incident at the SDR and also the one at NYMR referred to above (only one year after the Class 20 incident) seems to be part of a pattern.
     
  10. Steve

    Steve Resident of Nat Pres Friend

    Pridružen(a):
    7. Listopad 2006.
    Poruka:
    12,729
    Lajkova:
    11,847
    Interesi:
    Gentleman of leisure, nowadays
    Grad:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Let's put the buffer stop incident into perspective. The buffer stops at Whitby platform 2 are not the traditional rail built ones but are of the friction type, designed to absorb the energy of any impact and can slide back 30 feet or more. It is a requirement that, if the stops are touched in any way, Network Rail have to be informed as they require to be re-set . The loco was in the process of running round and, for the driver, the buffer stops are unsighted, the driver relying on experience as to where to stop. The loco came into gentle contact with the buffers, which were move back approximately 1 inch. However, it is reportable and operations had to come to a stop whilst it was investigated as it is also classed as a SPAD because the loco has effectively gone past the red light on the stops by that 1 inch. Twenty years ago and with traditional buffer stops, no one would have batted an eyelid.
     
    60017, ross, Gareth i 22 ostalih se sviđa ovo.
  11. 35B

    35B Nat Pres stalwart

    Pridružen(a):
    18. Lipanj 2011.
    Poruka:
    28,732
    Lajkova:
    28,659
    Spol:
    Muškarac
    Grad:
    Grantham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Understood, and the clarification of risk is useful to understand. However, I confess I'm surprised that such a modern installation includes a SPAD trap like that, and requires drivers to operate unsighted.
     
  12. GWR4707

    GWR4707 Nat Pres stalwart

    Pridružen(a):
    12. Svibanj 2006.
    Poruka:
    19,232
    Lajkova:
    17,566
    Spol:
    Muškarac
    Grad:
    Cumbria
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Previously discussed here. https://www.national-preservation.com/threads/driver-competencies.1419319/
     
    Lord Belborough se sviđa ovo.
  13. Jamessquared

    Jamessquared Nat Pres stalwart

    Pridružen(a):
    8. Ožujak 2008.
    Poruka:
    27,793
    Lajkova:
    64,458
    Grad:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I think I would want to hear formally what the actual cause was, rather than leaping to a conclusion about crew familiarity on a visiting loco.

    At the moment, the sum total of public domain knowledge seems to be (1) a photo of 4555 showing front end damage and (2) a public statement saying there was a low-speed accident involving 4555 and 5526. We don't even know definitively which one was moving and which was stationary (or whether both were moving). So speculation feels premature.

    Tom
     
  14. 5944

    5944 Resident of Nat Pres

    Pridružen(a):
    14. Siječanj 2006.
    Poruka:
    8,863
    Lajkova:
    9,262
    Spol:
    Muškarac
    Interesi:
    Train Maintainer for GTR at Hornsey
    Grad:
    Letchworth
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I think any buffer stop collision is now classed as a SPAD, at least on running lines. As @Steve said, it's gone past a red signal, but this one is in the middle of the four foot.

    Whitby station is on a curve, so if the driver is looking out backwards from the cab on the platform side, the track is curving away behind the tender out of sight. Looking at photos, it appears there's about 100' between the end of the points and the stops, so not a huge margin for error with a 65' long loco.
     
  15. 35B

    35B Nat Pres stalwart

    Pridružen(a):
    18. Lipanj 2011.
    Poruka:
    28,732
    Lajkova:
    28,659
    Spol:
    Muškarac
    Grad:
    Grantham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Understood - but my surprise is that there are no mitigations provided for this very modern installation.
     
  16. WishIHadAName

    WishIHadAName New Member

    Pridružen(a):
    7. Kolovoz 2013.
    Poruka:
    199
    Lajkova:
    176
    Spol:
    Muškarac
    Heritage Railway Volunteer:
    Yes I am an active volunteer

    To be fair 4555 is a visiting small prairie, Id imagine the SDR crews are pretty familiar with them as two are based on the line.
     
  17. Chris86

    Chris86 Well-Known Member

    Pridružen(a):
    31. Listopad 2011.
    Poruka:
    1,575
    Lajkova:
    1,783
    Interesi:
    Safety, technical and vehicle trainer
    Grad:
    South Yorkshire
    Heritage Railway Volunteer:
    No I do not currently volunteer
    This also surprises me given the usage and the recognition that it is unsighted that there is not additional controls in place.

    Im not party to the NYMR operating documents but I would be surprised if there wasn't visual distance markers in place, or a work instruction/procedure for the shunt to be directed/ by an additional member of staff to ensure the loco is positioned accurately in the headshunt.

    Chris
     
  18. duncananderson

    duncananderson New Member

    Pridružen(a):
    24. Svibanj 2010.
    Poruka:
    20
    Lajkova:
    33
    Are they happening more and more or are they just reported more easily?

    It’s only in recent years that this sort of thing is on Facebook almost instantly and all over the internet within a couple of days.
     
    MattA se sviđa ovo.
  19. torgormaig

    torgormaig Part of the furniture Friend

    Pridružen(a):
    17. Srpanj 2007.
    Poruka:
    4,906
    Lajkova:
    7,651
    I think this is getting a bit overdramatised. What additional controls do you want at a crash resistant bufferstop with at least a 30 foot overrun margin beyond it. The contact made with the stops was no greater, and probably less, than would be made when buffering up to a train and that could have a few hundred people in it. The buffers themselves are all the control needed and they did their job ok. The biggest problem is that it has to be reported, then the job is stopped and a court of inquiry established to make sure that there was no real danger to life or limb.

    Peter
     
  20. Steve

    Steve Resident of Nat Pres Friend

    Pridružen(a):
    7. Listopad 2006.
    Poruka:
    12,729
    Lajkova:
    11,847
    Interesi:
    Gentleman of leisure, nowadays
    Grad:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Incidents have always happened. Once upon a time they would generally have led to disciplinary action so were invariably covered up if people could get away with it. Modern thinking is simply to investigate incidents and look to how they could be avoided in future and not point fingers at people. As a result there is much more of a culture to report them, even where they are relatively trivial and would otherwise go unnoticed.
     
    60017, acorb, green five i 4 ostalih se sviđa ovo.