If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Bridge that Gap: Great Central Railway News

الموضوع في 'Heritage Railways & Centres in the UK' بواسطة Gav106, بتاريخ ‏8 ماي 2010.

  1. Flying Phil

    Flying Phil Part of the furniture

    إنضم إلينا في:
    ‏10 ديسمبر 2018
    المشاركات:
    3,018
    عدد المعجبين:
    6,318
    الجنس:
    ذكر
    مكان الإقامة:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I was told that there are signs up at the A60 bridge indicating that the worksite is being prepared. I expect that the track will be being lifted and ballast removed so that the old bridge decks can be lifted. Also the brick abutments will need repair/preparation work before the new decks go in. The actual lifts are scheduled for two dates in October.
    The fundraising for the two "Factory Flyover sections is now around £1.2M and there is the desire to get something started sooner rather than later in view of the inflation affecting costs. Could this follow on relatively quickly from the A 60 bridge work??
     
    AndyY, Hando, ilvaporista و 1 شخص آخر معجبون بهذا.
  2. Flying Phil

    Flying Phil Part of the furniture

    إنضم إلينا في:
    ‏10 ديسمبر 2018
    المشاركات:
    3,018
    عدد المعجبين:
    6,318
    الجنس:
    ذكر
    مكان الإقامة:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I was driving in Loughborough today and I can confirm that there are road signs up in both directions to the A 60 bridge indicating road access to works....but there is no sign, yet, of any plant or workers on site.
     
    أعجب بهذه المشاركة Andrew MI
  3. Vulcan Works

    Vulcan Works Member

    إنضم إلينا في:
    ‏12 إبريل 2018
    المشاركات:
    266
    عدد المعجبين:
    745
    الجنس:
    ذكر
    مكان الإقامة:
    England
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Good progress being made and very sensible to place orders ‘now’, especially for materials. I work for a utility company and the price of bulk orders of concrete for example are only being honoured by suppliers for a day! Other railways should take note and order what they can if they’re fundraising for civics projects because construction materials inflation is 10-15% (depending on the product), which could quickly erode the value of any donations coming in to an appeal fund. Granted a few hundred cube of ready mix isn’t sensible to store, but you get the idea!
     
    أعجب بهذه المشاركة J Rob't Harrison
  4. Jamessquared

    Jamessquared Nat Pres stalwart

    إنضم إلينا في:
    ‏8 مارس 2008
    المشاركات:
    27,793
    عدد المعجبين:
    64,456
    مكان الإقامة:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    My understanding is that HS2 is sucking up construction materials at a tremendous rate and driving a shortage in the market, and hence very rapid inflation.

    Tom
     
    أعجب بهذه المشاركة J Rob't Harrison
  5. J Rob't Harrison

    J Rob't Harrison Member

    إنضم إلينا في:
    ‏6 نوفمبر 2016
    المشاركات:
    240
    عدد المعجبين:
    360
    الجنس:
    ذكر
    مكان الإقامة:
    Stafford
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Not just the materials, but the elements of the materials. Some of the larger civils projects on it actually have their own dedicated new-build concrete plants. Construction materials generally have gone through the roof of late so I'm glad to hear orders are being placed and costs locked-in, rather than potentially watching the price going up quicker than the donations.
     
    أعجب بهذه المشاركة Hando
  6. Musket The Dog

    Musket The Dog New Member

    إنضم إلينا في:
    ‏5 يناير 2022
    المشاركات:
    198
    عدد المعجبين:
    458
    الجنس:
    ذكر
    الوظيفة:
    Mechanical Engineer
    مكان الإقامة:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    An update on the A60 bridge provided today:

     
    Flying Phil, banburysaint, Dave Williams و 5 آخرون معجبون بهذا.
  7. Dave Williams

    Dave Williams New Member

    إنضم إلينا في:
    ‏29 مارس 2021
    المشاركات:
    23
    عدد المعجبين:
    26
    الجنس:
    ذكر
    مكان الإقامة:
    Devon
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Please could I ask if the new bridge will be raised to ensure it will not be at risk of being hit by road traffic?
     
  8. 30854

    30854 Resident of Nat Pres

    إنضم إلينا في:
    ‏8 مارس 2017
    المشاركات:
    12,172
    عدد المعجبين:
    11,496
    الجنس:
    ذكر
    الوظيفة:
    Retired
    مكان الإقامة:
    Brighton&Hove
    Heritage Railway Volunteer:
    No I do not currently volunteer
    However high or wide you make a bridge, Sod's Law dictates some pratt will manage to find a way to hit it.
     
    Gareth, ilvaporista, weltrol و 1 شخص آخر معجبون بهذا.
  9. 45045

    45045 New Member

    إنضم إلينا في:
    ‏28 جويلية 2009
    المشاركات:
    117
    عدد المعجبين:
    49
    Generally a replacement bridge will have a thinner deck, due to improvements in materials and design. However, it may not be enough to still need a restricted height. Then adding crash protection, as was done at Broadway, is an option.
     
    أعجب بهذه المشاركة 30854
  10. Belgarath001

    Belgarath001 New Member

    إنضم إلينا في:
    ‏2 إبريل 2012
    المشاركات:
    149
    عدد المعجبين:
    382
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    In the lastest issue of MainLine it mentions that there is very little room for manoeuvre in terms of either lifting the bridge or lowering the road. The design incorporates as much headroom as possible supposedly, but as @45045 mentions above, crash protection will be installed also.
     
    أعجب بهذه المشاركة Dave Williams
  11. 30854

    30854 Resident of Nat Pres

    إنضم إلينا في:
    ‏8 مارس 2017
    المشاركات:
    12,172
    عدد المعجبين:
    11,496
    الجنس:
    ذكر
    الوظيفة:
    Retired
    مكان الإقامة:
    Brighton&Hove
    Heritage Railway Volunteer:
    No I do not currently volunteer
    We've a notoriously tight bridge, single track on a blind bend when heading west, beneath the Brighton Main Line on Mill Road (joins the A23 at the roundabout forming the junction with the A27 bypass). The number of times it's been clouted, repaired and reinforced defies counting.

    Why on earth it's not been replaced during one of any of the dozens occasions the BML has been closed for planned repairs (i.e. not the dozens of times it's suffered unscheduled closures), or due to motor insurance companies fed up with endless payouts is anyone's guess.

    I wish the GCR the very best and trust they've a top notch civil engineer to design the bridge (and it's defences) and Local Authority Highways Dept alert to the issues.
     
  12. SpudUk

    SpudUk Well-Known Member

    إنضم إلينا في:
    ‏5 فبراير 2009
    المشاركات:
    1,736
    عدد المعجبين:
    597
    الجنس:
    ذكر
    الوظيفة:
    Project Manager
    مكان الإقامة:
    Wales
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Looking at the mock-up, I'm assuming the new bridge deck will be double width, should doubling this section ever be on the agenda?
     
  13. Musket The Dog

    Musket The Dog New Member

    إنضم إلينا في:
    ‏5 يناير 2022
    المشاركات:
    198
    عدد المعجبين:
    458
    الجنس:
    ذكر
    الوظيفة:
    Mechanical Engineer
    مكان الإقامة:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I think I've seen it written and sketched that the two decks are already necessary because of the proximity of the bridge to the main line link. It might have been a combination of the differences in height between the alignments needed to get the MML up to the GCR and the need to stable the trains from the mainline on the GCR off of the curve/embankment. They haven't gone to the trouble of making any of the rest of the gap double in the plans, this would be quite a small piece, just in case.
     
  14. SpudUk

    SpudUk Well-Known Member

    إنضم إلينا في:
    ‏5 فبراير 2009
    المشاركات:
    1,736
    عدد المعجبين:
    597
    الجنس:
    ذكر
    الوظيفة:
    Project Manager
    مكان الإقامة:
    Wales
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Ah that makes sense, thanks!
     
  15. mogulb

    mogulb New Member

    إنضم إلينا في:
    ‏20 ديسمبر 2010
    المشاركات:
    133
    عدد المعجبين:
    95
    The bridge will be double track, one for the cord from the MML and one for the link from Loughborough Central. A section of double track is planned north of the new bridge to allow a run round for any incoming traffic heading south.
     
    30854, SpudUk, The Dainton Banker و 2 آخرون معجبون بهذا.
  16. Flying Phil

    Flying Phil Part of the furniture

    إنضم إلينا في:
    ‏10 ديسمبر 2018
    المشاركات:
    3,018
    عدد المعجبين:
    6,318
    الجنس:
    ذكر
    مكان الإقامة:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Work has started!
    There are now some container type buildings being placed in the compound by the North embankment of the MML bridge. This is for the works compound for the A 60 bridge work.
    DSC01864.JPG

    There is some new fencing and gate at the works access.
     
  17. NBDR Lock

    NBDR Lock New Member

    إنضم إلينا في:
    ‏18 جوان 2012
    المشاركات:
    151
    عدد المعجبين:
    126
    Good news Phil, thanks for posting.

    Do we yet have any more idea of the problems with Bridge 307 at Bunny Lane? If this bridge is to be out of service for a long period it would preclude any thoughts of running between Ruddington and Rushcliffe Halt and also prevent the running round movements needed for the Gypsum traffic. To allow the gypsum train loco to run round without straying onto this bridge and get this traffic going again, would it be possible to relay the crossover further south or would this compromise the ability to deal with a full length train?
     
    أعجب بهذه المشاركة GOEdwards
  18. Flying Phil

    Flying Phil Part of the furniture

    إنضم إلينا في:
    ‏10 ديسمبر 2018
    المشاركات:
    3,018
    عدد المعجبين:
    6,318
    الجنس:
    ذكر
    مكان الإقامة:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I have seen nor heard any more information about that Bridge 307. Perhaps it can be used only at slow speed until it gets repaired? If so the Gypsum traffic could be allowed once the A60 bridge is replaced.....But that is only a supposition in the absence of any new information!
     
  19. Miff

    Miff Part of the furniture Friend

    إنضم إلينا في:
    ‏17 جوان 2008
    المشاركات:
    3,000
    عدد المعجبين:
    3,023
    Is there any guarantee the Gypsum will come back? I hope it does but I assume the producer and customers will have made other transport arrangements since the bridges broke.
     
  20. Flying Phil

    Flying Phil Part of the furniture

    إنضم إلينا في:
    ‏10 ديسمبر 2018
    المشاركات:
    3,018
    عدد المعجبين:
    6,318
    الجنس:
    ذكر
    مكان الإقامة:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Miff makes a good point but I'm sure that the GCR will have been working very closely with British Gypsum. I believe the supply of Gypsum is both from the ground and as a by-product from some types of power station so a variety of sources/locations.
     
    أعجب بهذه المشاركة Miff

مشاركة هذه الصفحة