If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Ten foot or Six foot?

Discuție în 'Civil Engineering M.I.C.' creată de ralphchadkirk, 31 Mar 2009.

  1. class8mikado

    class8mikado Part of the furniture

    Înscris:
    1 Iun 2009
    Mesaje:
    3.842
    Aprecieri primite:
    1.644
    Ocupație:
    Print Estimator/ Repository of Useless Informatio.
    Locație:
    Bingley W.Yorks.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Nearest Relevant thread; ?
    Considering doing a night school course ' Rail engineering Level 3'.
    What kind of job might need that qualification ?
     
  2. 5944

    5944 Resident of Nat Pres

    Înscris:
    14 Ian 2006
    Mesaje:
    8.870
    Aprecieri primite:
    9.288
    Sex:
    Masculin
    Ocupație:
    Train Maintainer for GTR at Hornsey
    Locație:
    Letchworth
    Heritage Railway Volunteer:
    No I do not currently volunteer
    A lot - but from what I can see is it is essentially an apprenticeship or A level grade, so you'd still need to pick a speciality afterwards. But it'll put you in good stead for a job with NR or a TOC.
     
  3. Martin Adalar

    Martin Adalar New Member

    Înscris:
    2 Mai 2018
    Mesaje:
    193
    Aprecieri primite:
    69
    Sex:
    Masculin
    Locație:
    5D
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I cannot really see the point of this thread: there has never been any confusion i know of regarding the position of 6' or 10'. There are many places where you can find cess/US/UF/DS/DF/cess and cess/US/DS/UF/DF/cess on the same line and the 10' will just divide two pairs of tracks whether they be paired by direction or speed or to separate a siding or loop from the nearest running line. This has nothing to do with any supposed set in stone policy of some pre nationalisation or pre grouping company.
     
  4. Ploughman

    Ploughman Part of the furniture

    Înscris:
    1 Apr 2008
    Mesaje:
    5.969
    Aprecieri primite:
    2.761
    Ocupație:
    Ex a lot of things.
    Locație:
    Near where the 3 Ridings meet
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    South of York between Holgate and Copmanthorpe the tracks run Up Down Up Down.
    You would therefore expect the spacing to be 6ft / 10ft / 6ft. So the 10ft should act as it should, separating pairs of tracks.
    Not so
    The actual spacing is 10ft / 6ft/ 10ft. ( I know because I had to measure them for a renewal)

    Anyone care to answer why?
    Historically they have always been in this arrangement.
     
  5. 35B

    35B Nat Pres stalwart

    Înscris:
    18 Iun 2011
    Mesaje:
    28.745
    Aprecieri primite:
    28.694
    Sex:
    Masculin
    Locație:
    Grantham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Are (were) there bridge piers encouraging a centre pair and two outliers?
     
  6. Ploughman

    Ploughman Part of the furniture

    Înscris:
    1 Apr 2008
    Mesaje:
    5.969
    Aprecieri primite:
    2.761
    Ocupație:
    Ex a lot of things.
    Locație:
    Near where the 3 Ridings meet
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    No bridges or drainage that I am aware of that would account for this.
     
    35B apreciază asta.
  7. Ploughman

    Ploughman Part of the furniture

    Înscris:
    1 Apr 2008
    Mesaje:
    5.969
    Aprecieri primite:
    2.761
    Ocupație:
    Ex a lot of things.
    Locație:
    Near where the 3 Ridings meet
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Just had a thought.
    There were yards either side of the ECML here at Dringhouses.
    That may have been a reason, with a through goods line at a 6ft either side.
     
    35B apreciază asta.
  8. Martin Adalar

    Martin Adalar New Member

    Înscris:
    2 Mai 2018
    Mesaje:
    193
    Aprecieri primite:
    69
    Sex:
    Masculin
    Locație:
    5D
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Either side of a pair of lines there should be a position of safety and that is what the 10' is for, without knowing the location you mention i would hazard a guess that the two outer lines that you describe are slows, goods lines or loops which in this case means there is a P.o.S. either side of each outer track and either side of the two mains which are the pair.
     

Distribuie pagina asta