Bridge that Gap: Great Central Railway News

本贴由 Gav1062010-05-08 发布. 版块名称: Heritage Railways & Centres in the UK

  1. Ploughman

    Ploughman Part of the furniture

    注册日期:
    2008-04-01
    帖子:
    5,969
    支持:
    2,761
    职业:
    Ex a lot of things.
    所在地:
    Near where the 3 Ridings meet
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Hope it doesn't breakdown then and need to be replaced.:):)
     
  2. Flying Phil

    Flying Phil Part of the furniture

    注册日期:
    2018-12-10
    帖子:
    3,018
    支持:
    6,319
    性别:
    所在地:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    This weekend should see more work on the A60 Bridge as they are due to put the large concrete "caps" on top of the brick abutments I believe.
     
    已获得Johnme101J Rob't Harrison的支持.
  3. mogulb

    mogulb New Member

    注册日期:
    2010-12-20
    帖子:
    133
    支持:
    95
    Phil . Looks like next stage has been put back a week as the next road closure has been rescheduled.
     
  4. Flying Phil

    Flying Phil Part of the furniture

    注册日期:
    2018-12-10
    帖子:
    3,018
    支持:
    6,319
    性别:
    所在地:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Thanks for that update Mogulb. I knew that they had originally scheduled to have closures this weekend and next weekend. I also heard that they may be trying to do it all in one weekend so possibly all done next weekend???
     
  5. mogulb

    mogulb New Member

    注册日期:
    2010-12-20
    帖子:
    133
    支持:
    95
    Phil. According to one network there is also a closure planned for 18 to 21 November.
     
  6. J Rob't Harrison

    J Rob't Harrison Member

    注册日期:
    2016-11-06
    帖子:
    240
    支持:
    360
    性别:
    所在地:
    Stafford
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Looks like the new concrete abutment caps have been fitted to the A60 bridge.

     
    已获得30854, Johnme101, Flying Phil另外1人的支持.
  7. Flying Phil

    Flying Phil Part of the furniture

    注册日期:
    2018-12-10
    帖子:
    3,018
    支持:
    6,319
    性别:
    所在地:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Thanks for posting that clip J Rob't. It is great to see the progress.
     
  8. Johann Marsbar

    Johann Marsbar Well-Known Member

    注册日期:
    2016-02-21
    帖子:
    1,669
    支持:
    2,178
    性别:
    所在地:
    Suffolk
    Heritage Railway Volunteer:
    No I do not currently volunteer
    The condensed version of the weekends work has now been put online....

     
    已获得30854, J Rob't Harrison, Flying Phil另外2人的支持.
  9. Flying Phil

    Flying Phil Part of the furniture

    注册日期:
    2018-12-10
    帖子:
    3,018
    支持:
    6,319
    性别:
    所在地:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    There was no work being done yesterday (unless they are awaiting it to cure before doing bits?) so I presume it is all ready for the decks to go up on the 19/20th
    IMG20221109110102s.jpg
     
    已获得Johnme101, John Petley, Bluenosejohn另外2人的支持.
  10. 30854

    30854 Resident of Nat Pres

    注册日期:
    2017-03-08
    帖子:
    12,172
    支持:
    11,496
    性别:
    职业:
    Retired
    所在地:
    Brighton&Hove
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Of interest, what sort of headroom will the highway have beneath the reinstated bridge?
     
  11. Flying Phil

    Flying Phil Part of the furniture

    注册日期:
    2018-12-10
    帖子:
    3,018
    支持:
    6,319
    性别:
    所在地:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    "An extra few inches" is said on a GCR press release. The old bridge was stated as 4.3m and I suspect the new one will be 4.4m/4.5m, but we will have to see. The constraints are that the roadway floods and the rail track cannot have a greater gradient coming off from the Midland Main Line up the chord line.
     
  12. Flying Phil

    Flying Phil Part of the furniture

    注册日期:
    2018-12-10
    帖子:
    3,018
    支持:
    6,319
    性别:
    所在地:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    This weekend should see the new bridge decks being put on the abutments. It is also the "Last Hurrah Gala" on the GCR with an intensive timetable - including that "lengthy train" of Windcutter 16T minerals operating mid day on Sat and Sunday. In a few years time it will be fantastic to see them going North over the new bridges!
     
    已获得J Rob't Harrison, Johnme101, big.stu另外3人的支持.
  13. Flying Phil

    Flying Phil Part of the furniture

    注册日期:
    2018-12-10
    帖子:
    3,018
    支持:
    6,319
    性别:
    所在地:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Work is progressing steadily this weekend and there is a large crane now in place by the A 60 bridge and a lorry, with one of the decks, all ready to be off loaded.
    DSC02141.JPG
     
  14. Johann Marsbar

    Johann Marsbar Well-Known Member

    注册日期:
    2016-02-21
    帖子:
    1,669
    支持:
    2,178
    性别:
    所在地:
    Suffolk
    Heritage Railway Volunteer:
    No I do not currently volunteer
  15. Flying Phil

    Flying Phil Part of the furniture

    注册日期:
    2018-12-10
    帖子:
    3,018
    支持:
    6,319
    性别:
    所在地:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    At the A 60 bridge tonight I was told that both decks and the two anti- collision beams are in place. The big crane is being dis-assembled and the grouting etc should be done tomorrow. Then is needs some special matting, signage, ballast and track!
    DSC02156.JPG
     
  16. Johann Marsbar

    Johann Marsbar Well-Known Member

    注册日期:
    2016-02-21
    帖子:
    1,669
    支持:
    2,178
    性别:
    所在地:
    Suffolk
    Heritage Railway Volunteer:
    No I do not currently volunteer
  17. Flying Phil

    Flying Phil Part of the furniture

    注册日期:
    2018-12-10
    帖子:
    3,018
    支持:
    6,319
    性别:
    所在地:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Here is my picture, taken today, of the new A60 bridge.
    DSC02159.JPG
     
    已获得Martin Perry, GOEdwards, ilvaporista另外9人的支持.
  18. Miff

    Miff Part of the furniture Friend

    注册日期:
    2008-06-17
    帖子:
    3,000
    支持:
    3,023
    Gained 3 inches headroom judging by the new sign on the bridge, compared to the old one at the road side.
     
  19. pmh_74

    pmh_74 Part of the furniture

    注册日期:
    2009-01-28
    帖子:
    2,423
    支持:
    1,707
    Yes but life isn't that simple. If you look here:
    https://www.hgvalliance.com/Helpful-Guides/bridge-strike/low-bridge-finder/uk
    The bridge was already shown as 14'6" - maybe one of the reasons there were so many bridge strikes?
    So in effect the height gained is just to put the bridge where the HGV drivers already thought it was.
    I seem to recall someone telling me there were 14'6" signs further out as well (although I haven't confirmed this personally). So I suspect that 3" had been lost to road re-surfacing over the years.
     
    已获得Miff的支持.
  20. Vulcan Works

    Vulcan Works Member

    注册日期:
    2018-04-12
    帖子:
    266
    支持:
    745
    性别:
    所在地:
    England
    Heritage Railway Volunteer:
    No I do not currently volunteer
    That does look like a fine piece of civil engineering. I’ve said it before, the scale and complexity of the GCR’s works would be a challenge for much larger organisations so I can only assume that the GCR has some some decent civil engineers or project managers in its ranks!
     