If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

GWSR General Discussion and Operations

الموضوع في 'Heritage Railways & Centres in the UK' بواسطة michaelh, بتاريخ ‏25 أوت 2013.

  1. 6026 King John

    6026 King John Well-Known Member

    إنضم إلينا في:
    ‏10 نوفمبر 2006
    المشاركات:
    1,616
    عدد المعجبين:
    908
    مكان الإقامة:
    Hampton Court, Surrey
    I'm just curious to know why on most running days at the GWSR one of the steam locos is replaced by a diesel for the last run of the day. This practice seems to have been going on for several years. Is it simply to give the diesels a turn and keep diesel enthusiasts happy or is it for an operational reason (e.g. reducing the number of hours the steam crew are one duty)?
     
  2. flying scotsman123

    flying scotsman123 Resident of Nat Pres

    إنضم إلينا في:
    ‏9 سبتمبر 2013
    المشاركات:
    10,674
    عدد المعجبين:
    18,699
    الجنس:
    ذكر
    مكان الإقامة:
    Cheltenham
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    A bit of both, but principally the latter. On our 2 steam timetable if we were to run both trains steam all day we'd need 4 crews otherwise the shifts would both be over 12 hours long. Instead, we shorten 1 turn by one round trip to enable 1 crew to cover it, and split the other train into 2 shifts, with the afternoon crew also giving some lunchtime relief to the 'all day' crew before their main afternoon shift. That means we only need 3 crews instead of 4 per day. It's all very cunning!
     
    Biermeister, 3ABescot, D1039 و 5 آخرون معجبون بهذا.
  3. 6026 King John

    6026 King John Well-Known Member

    إنضم إلينا في:
    ‏10 نوفمبر 2006
    المشاركات:
    1,616
    عدد المعجبين:
    908
    مكان الإقامة:
    Hampton Court, Surrey
    Thanks for the explanation - that makes perfect sense.
     
    أعجب بهذه المشاركة flying scotsman123
  4. Steve

    Steve Resident of Nat Pres Friend

    إنضم إلينا في:
    ‏7 اكتوبر 2006
    المشاركات:
    12,729
    عدد المعجبين:
    11,847
    الوظيفة:
    Gentleman of leisure, nowadays
    مكان الإقامة:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Am I mis-interpreting this or are you replacing 4 steam crews with 3 steam and 1 diesel crew?
     
    أعجب بهذه المشاركة Jamessquared
  5. flying scotsman123

    flying scotsman123 Resident of Nat Pres

    إنضم إلينا في:
    ‏9 سبتمبر 2013
    المشاركات:
    10,674
    عدد المعجبين:
    18,699
    الجنس:
    ذكر
    مكان الإقامة:
    Cheltenham
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Not really replacing, because we'd never manage to field 4 steam crews day to day. This arrangement allows us to run a slightly longer day to cater to the Cheltenham-Broadway-Cheltenham daytrip market and the demand for an earlier train from Broadway whilst only requiring 3 steam crews. Before that we just ran shorter days.
     
  6. acorb

    acorb Part of the furniture

    إنضم إلينا في:
    ‏17 جويلية 2007
    المشاركات:
    2,950
    عدد المعجبين:
    4,380
    مكان الإقامة:
    Powys
    IMG_20230527_135101.jpg Very pleasant day on the railway yesterday, in the company of Pendennis Castle and Foremarke Hall. The crews were being very complimentary about 4079, describing her as 'smooth as silk' - sounded like there was a Didcot contingent there too. Either way, they gave us a splendid run to Broadway, with plenty of that fantastic bark! Good to see the progress on platform 2 and the footbridge.
    On the return, 7903 was gleaming and sounded just as good.
    Trains were comfortably loaded, but with no issues finding a seat, overall a very relaxed and enjoyable day.
     
    ragl, beavis, banburysaint و 8 آخرون معجبون بهذا.
  7. Sidmouth

    Sidmouth Resident of Nat Pres Staff Member Moderator

    إنضم إلينا في:
    ‏12 سبتمبر 2005
    المشاركات:
    10,146
    عدد المعجبين:
    9,777
    الجنس:
    ذكر
    مكان الإقامة:
    Alderan !
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    3ABescot, ykin01, banburysaint و 7 آخرون معجبون بهذا.
  8. Sidmouth

    Sidmouth Resident of Nat Pres Staff Member Moderator

    إنضم إلينا في:
    ‏12 سبتمبر 2005
    المشاركات:
    10,146
    عدد المعجبين:
    9,777
    الجنس:
    ذكر
    مكان الإقامة:
    Alderan !
    Heritage Railway Volunteer:
    Yes I am an active volunteer




    Couple of video's from the evening
     
  9. Kinghambranch

    Kinghambranch Well-Known Member

    إنضم إلينا في:
    ‏20 ديسمبر 2006
    المشاركات:
    1,879
    عدد المعجبين:
    1,612
    الجنس:
    ذكر
    الوظيفة:
    Retired
    مكان الإقامة:
    White Rose County
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Thank you very much for the photo and videos of the 4079 charter on the GWSR. I attended the recent GWSR steam gala so was able to see Pendennis Castle in action. However, your photo proves to me that, after all the years of being a GWSR shareholder and supporter, dreams sometimes can become reality. This was the "Honeybourne Line" between 1952 and 1962. Thanks to you, and so many others, we can "get a glimpse" and experience what was and what is now.

    I can also report that our GWR 2-8-0 No 2807 now has its boiler back in the frames and the team is working hard to get all the remaining "bits" refitted, including the boiler cladding and reattaching the smokebox. It is expected that 2807 should be back in service in September, but we all know how things can take a bit longer with these beasts!
     
    MattA, ykin01, David likes trains و 3 آخرون معجبون بهذا.
  10. Biermeister

    Biermeister Member

    إنضم إلينا في:
    ‏4 أوت 2019
    المشاركات:
    361
    عدد المعجبين:
    669
    الجنس:
    ذكر
    الوظيفة:
    Brewer
    مكان الإقامة:
    Daylesford, Victoria, Australia
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Anything to report on the progress with 2807? A picture would be welcome.
     
  11. flying scotsman123

    flying scotsman123 Resident of Nat Pres

    إنضم إلينا في:
    ‏9 سبتمبر 2013
    المشاركات:
    10,674
    عدد المعجبين:
    18,699
    الجنس:
    ذكر
    مكان الإقامة:
    Cheltenham
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The blog is being updated again with plenty of pictures gwr2807.blogspot.com
     
    Johnme101 و Biermeister معجبون بهذا.
  12. Breva

    Breva Well-Known Member

    إنضم إلينا في:
    ‏11 اكتوبر 2010
    المشاركات:
    2,347
    عدد المعجبين:
    4,078
    مكان الإقامة:
    Gloucestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    If all goes well we should start waterproofing the Stanway viaduct this next closed season. It's not definite yet, as the appeal launched to fund the works could do with more support.
    https://www.gwrt.org.uk/donate/stanway-viaduct-appeal

    As you may know, ours was a double track main line but is now single track. When the track was relaid back over the viaduct (having been lifted in 1979) there was a debate about where to lay it, and in the end the middle was selected, right over the drain inspection covers.
    That debate is now topical again. Lay the track down one side, making access (and indeed viaduct mainenance) easier, or down the middle as before?

    What do people think?
     
    أعجب بهذه المشاركة Mark Thompson
  13. Mark Thompson

    Mark Thompson Well-Known Member

    إنضم إلينا في:
    ‏10 سبتمبر 2017
    المشاركات:
    1,591
    عدد المعجبين:
    3,934
    الجنس:
    ذكر
    مكان الإقامة:
    E sussex
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Difficult one. If the track is relaid on the original up or down footprint, then there is the problem of the structure being subjected to unequal loading, with associated stressing. How close can the track be laid to the centreline without fouling the inspection covers?
     
  14. Ploughman

    Ploughman Part of the furniture

    إنضم إلينا في:
    ‏1 إبريل 2008
    المشاركات:
    5,969
    عدد المعجبين:
    2,761
    الوظيفة:
    Ex a lot of things.
    مكان الإقامة:
    Near where the 3 Ridings meet
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Can the drain run be altered to cess and cess?
    What fall is currently in place in the formation?
    For tamping you will need minimum ballast depth below the sleeper bottom of 150mm plus crossfall.
    When the Bluebell extended to E Grinstead didn't they have the same problem?
     
  15. 61624

    61624 Part of the furniture

    إنضم إلينا في:
    ‏27 سبتمبر 2006
    المشاركات:
    5,294
    عدد المعجبين:
    3,599
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    There must surely be a straightforward answer to this question, depending on the size of the inspection covers - adjust the sleeper spacing to straddle the cover or cut away the sleeper middle leaving the ends to support the rail and lay the track in the middle of the structure? One sleeper, or at most two, is surely all it would take, particularly if it is cwr at that point. That wouldn't be enough to allow the gauge to spread, but if that's a concern removable tie bars could be fitted.
     
  16. Breva

    Breva Well-Known Member

    إنضم إلينا في:
    ‏11 اكتوبر 2010
    المشاركات:
    2,347
    عدد المعجبين:
    4,078
    مكان الإقامة:
    Gloucestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I'd be interested to know of other examples.

    Why would the loading be unequal? Originally the two tracks ran on one side each, that could be just one side. Wasn't the viaduct built to be loaded along each side?
    The track is currently laid in the centre, but that made it difficult to examine the centre drains. 4 years ago or so the track was removed, and pipes were fitted upwards to allow camera inspections from between the sleepers.

    If the track is laid in the centre, you can't use rail mounted cherry picker inspection vehicles, and you lose the haul road that we have along the track elsewhere. That is very useful.
     
    أعجب بهذه المشاركة Gtb. Man
  17. Jamessquared

    Jamessquared Nat Pres stalwart

    إنضم إلينا في:
    ‏8 مارس 2008
    المشاركات:
    27,793
    عدد المعجبين:
    64,460
    مكان الإقامة:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    On Imberhorne Viaduct, the track is offset, essentially running along the up (western) side. I'm not sure if it is precisely on the old up line alignment, or is slightly moved towards the centre, but it definitely isn't along the centre line. (I've got a vague recollection it is slewed slightly towards the centre to allow more space to access the parapet-side of a train in the event of an emergency, but I might have got that wrong, it's a long time ago!)

    See this photo (not mine): https://folkestonejack.wordpress.com/2013/04/06/extension-to-east-grinstead/bluebellopening_02/

    http://www.bluebell-railway.co.uk/bluebell/pic2/wn/2013a/trtr_onviaduct_johns_24feb13h.jpg

    Tom
     
    Last edited: ‏30 جويلية 2023
    Nick C و Breva معجبون بهذا.
  18. Breva

    Breva Well-Known Member

    إنضم إلينا في:
    ‏11 اكتوبر 2010
    المشاركات:
    2,347
    عدد المعجبين:
    4,078
    مكان الإقامة:
    Gloucestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Thanks Tom, that is very helpful.
     
  19. Dunfanaghy Road

    Dunfanaghy Road Well-Known Member

    إنضم إلينا في:
    ‏9 اكتوبر 2019
    المشاركات:
    1,401
    عدد المعجبين:
    1,772
    الجنس:
    ذكر
    الوظيفة:
    Retired
    مكان الإقامة:
    Alton, Hants
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    It's not that unusual to see a crack running through an arch (below the 6 foot) due to the two tracks above stressing the structure on different sides (and different times).
    Pat
     
  20. Chuffington

    Chuffington New Member

    إنضم إلينا في:
    ‏25 إبريل 2018
    المشاركات:
    98
    عدد المعجبين:
    63
    الجنس:
    ذكر
    مكان الإقامة:
    Cheltenham
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Extend the loop to the broadway side, down trains run one side up trains run on the other side, thus minimising any stress caused, you also gain a small section of double track.
     
    Biermeister, The Dainton Banker, toplight و 3 آخرون معجبون بهذا.

مشاركة هذه الصفحة