If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Bridge that Gap: Great Central Railway News

Discussie in 'Heritage Railways & Centres in the UK' gestart door Gav106, 8 mei 2010.

  1. Jamie C. Steel

    Jamie C. Steel Member

    Lid geworden:
    3 jan 2006
    Berichten:
    903
    Leuk Bevonden:
    103
    Geslacht:
    Man
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    A higher standard, I'm not party to the details but it involved ultrasonic axle testing of each vehicle involved that didn't usually run at the higher speed and an increased frequency of examination. Along with various restrictions upon the line, eg Quorn and Swithland signalbox switched out of circuit as it is signalled for 60mph not 75mph, and no member of staff lineside with access to the railway through gates chained and padlocked.
     
    acorb en Matt37401 vinden dit leuk.
  2. Matt37401

    Matt37401 Nat Pres stalwart

    Lid geworden:
    8 jun 2014
    Berichten:
    15.551
    Leuk Bevonden:
    11.955
    Locatie:
    Wnxx
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Cheers Jamie.
     
  3. sycamore

    sycamore Member

    Lid geworden:
    17 aug 2009
    Berichten:
    596
    Leuk Bevonden:
    238
    Geslacht:
    Man
    Beroep:
    Guard & Signalman (E&BAR) / Driver (HVMR)
    Locatie:
    Embsay or Bolton Abbey, sometimes in between...
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Is there any news on the A60 bridge progress does anybody know? Not seen an update since the bridge lift.

    TIA
    Will
     
  4. Flying Phil

    Flying Phil Part of the furniture

    Lid geworden:
    10 dec 2018
    Berichten:
    3.018
    Leuk Bevonden:
    6.319
    Geslacht:
    Man
    Locatie:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The new bridge went in on time, but I don't think any ballast or track has been put on it yet. I would think there is a waterproof membrane and some covering though.
     
  5. jasa76

    jasa76 New Member

    Lid geworden:
    11 mei 2016
    Berichten:
    96
    Leuk Bevonden:
    24
    Geslacht:
    Man
    Locatie:
    Nottingham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Thats what I was told as well at the weekend when having a tour of the shed. On the canal bridge they have put a covering of ballast, but its not up to the level of the surrounding ground as there's a distinct lip. I imagine that they will wait until all the work is done, so that it the track and ballast can be laid all the way through to make sure that its all aligned.
     
  6. Mark_108

    Mark_108 New Member

    Lid geworden:
    10 mrt 2015
    Berichten:
    37
    Leuk Bevonden:
    19
    Geslacht:
    Man
    Beroep:
    Senior Engineer - Offshore Design
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    There is already ballast north and south of the A60 bridge so it would be more of a 'fill in' job, to the heights already in place, for where the running line off the chord and beyond is/was. The non running line had the ballast removed years ago to reduce the load on the bridge structure.

    I suspect its more to do with EMRT not having anyone currently who does anything on that part of the line (as GCR have not taken it on, and they took it off GCRN) so would need contractors and somebody else to organise it.

    It makes sense to put something down as the water proofing may well by sensitive to UV, a layer of ballast is pretty effective at protecting such things
     
    Last edited: 20 jun 2023
    Chris86 en J Rob't Harrison vinden dit leuk.
  7. Flying Phil

    Flying Phil Part of the furniture

    Lid geworden:
    10 dec 2018
    Berichten:
    3.018
    Leuk Bevonden:
    6.319
    Geslacht:
    Man
    Locatie:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    It is believed that the planning permission has been applied for for the "Factory Fly-over" section and the fund raising has nearly reached the £2M mark....according to talk during the Q W & W weekend on the FoGCRML stand. So hopefully there will be an official update soon.
     
    Hando, Johnme101, CH 19 en 2 anderen vinden dit leuk.
  8. Mark_108

    Mark_108 New Member

    Lid geworden:
    10 mrt 2015
    Berichten:
    37
    Leuk Bevonden:
    19
    Geslacht:
    Man
    Beroep:
    Senior Engineer - Offshore Design
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Nothing showing on the Charnwood planning portal
     
  9. brmp201

    brmp201 Member

    Lid geworden:
    18 mei 2010
    Berichten:
    614
    Leuk Bevonden:
    964
    Geslacht:
    Man
    Beroep:
    IT Director
    Locatie:
    Surrey, UK
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Hando, Johnme101 en The Dainton Banker vinden dit leuk.
  10. J Rob't Harrison

    J Rob't Harrison Member

    Lid geworden:
    6 nov 2016
    Berichten:
    240
    Leuk Bevonden:
    360
    Geslacht:
    Man
    Locatie:
    Stafford
    Heritage Railway Volunteer:
    No I do not currently volunteer
    A memorandum of understanding between Loughborough and Ruddington is good news indeed. It makes me a bit more minded to restart my direct debit...
     
    GOEdwards, Flying Phil en brmp201 vinden dit leuk.
  11. Flying Phil

    Flying Phil Part of the furniture

    Lid geworden:
    10 dec 2018
    Berichten:
    3.018
    Leuk Bevonden:
    6.319
    Geslacht:
    Man
    Locatie:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    There is also a new 12 page leaflet about the project. This can be viewed via the GCR website in the Reunification August update.
     
    Hando, brmp201 en J Rob't Harrison vinden dit leuk.
  12. Flying Phil

    Flying Phil Part of the furniture

    Lid geworden:
    10 dec 2018
    Berichten:
    3.018
    Leuk Bevonden:
    6.319
    Geslacht:
    Man
    Locatie:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    There was a meeting of a new joint committee (GCR plus GCR(N) plus others) to help the planning and implementation of Reunification according to the latest GCR Video update.
    It also implied that more paperwork/plans need to be finalised before it (Factory Flyover) can to go to the Planning dept.
     
  13. Flying Phil

    Flying Phil Part of the furniture

    Lid geworden:
    10 dec 2018
    Berichten:
    3.018
    Leuk Bevonden:
    6.319
    Geslacht:
    Man
    Locatie:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The latest GM Update video has the news that the track is to be relayed over the A60 bridge this month. So a little bit more progress.
     
  14. bristolian

    bristolian Member

    Lid geworden:
    25 jul 2005
    Berichten:
    531
    Leuk Bevonden:
    297
    Geslacht:
    Man
    Locatie:
    Huntingdon. Formerly from Bristol.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Do you have a link to the video, please?.
     
    Andrew MI vindt dit leuk.
  15. J Rob't Harrison

    J Rob't Harrison Member

    Lid geworden:
    6 nov 2016
    Berichten:
    240
    Leuk Bevonden:
    360
    Geslacht:
    Man
    Locatie:
    Stafford
    Heritage Railway Volunteer:
    No I do not currently volunteer
    An interesting update in the latest copy of Mainline. I'm very pleased to be reading about the establishment of a dedicated project board (it's beyond me why it's taken so long to recognise that such a body is a Good Thing to Have with a project like this). I'm considering whether the project has been turned around enough to warrant my re-starting my direct debit in support.
    The really interesting bit though is that "it transpires doubling to Leicester North isn't just nice to do but very important when the line is 18 miles long". Now there's something I'd definitely be minded to contribute toward.
     
    Gareth, CoalFiredGeek en acorb vinden dit leuk.
  16. WesternRegionHampshireman

    WesternRegionHampshireman Well-Known Member

    Lid geworden:
    25 sep 2021
    Berichten:
    1.188
    Leuk Bevonden:
    222
    Geslacht:
    Man
    Locatie:
    Hampshire
    Heritage Railway Volunteer:
    No I do not currently volunteer
    So when both sites are joined together, it's going to be 18 miles long?
     
    Last edited by a moderator: 14 dec 2023
  17. Andrew MI

    Andrew MI New Member

    Lid geworden:
    5 jan 2022
    Berichten:
    23
    Leuk Bevonden:
    19
    Locatie:
    Yorkshire
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Presumably the reason why doubling to Leicester North is very important is an operational reason? I am very much not familiar with that, but can anyone shed any light on or unpack this please?
     
  18. 35B

    35B Nat Pres stalwart

    Lid geworden:
    18 jun 2011
    Berichten:
    28.741
    Leuk Bevonden:
    28.689
    Geslacht:
    Man
    Locatie:
    Grantham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I'm also curious about this, especially when north of Loughborough is predominantly single track.
     
    MuzTrem vindt dit leuk.
  19. Gav106

    Gav106 Well-Known Member

    Lid geworden:
    29 mrt 2010
    Berichten:
    1.772
    Leuk Bevonden:
    2.170
    Locatie:
    Nantwich, Cheshire
    If that museum gets built one day then surely you would want to maximise the traffic able to get to it?
     
  20. Belgarath001

    Belgarath001 New Member

    Lid geworden:
    2 apr 2012
    Berichten:
    149
    Leuk Bevonden:
    382
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Yes.

    Elsewhere in Mainline, it mentions "one of the tasks currently being undertaken is understanding future timetables to help inform what infrastructure might be needed to ensure there is the right level of flexibility and avoidance of pinch points. Early work suggests that very quickly the single track between Rothley and Leicester North becomes a considerable timetable constraint." I don't know how this ties in to @35B's point about north of Loughborough, and the presumably even bigger constraint of the 10 mile single track with loops. But I'm confident it's being looked at, and if it's early days still, there may be no point in mentioning anything whilst the study continues.

    Also worth mentioning from Mainline I think, given previous concerns, is the news of the drafting of a Memorandum of Understanding between GCR PLC and GCR(N), setting out how the two organisations work towards aligning processes, systems and ways of working explicitly with the intent of being able to operate as one railway.
     

Deel Deze Pagina